2 resultados para trigeneration
em Dalarna University College Electronic Archive
Resumo:
The aim of this report is to give an overview of the results of Work Package 5 “Engineering Tools”. In this workpackage numerical tools have been developed for all relevant CHCP systems in the PolySMART demonstration projects (WP3). First, existing simulation platforms have been described and specific characteristics have been identified. Several different simulation platforms are in principle appropriate for the needs in the PolySMART project. The result is an evaluation of available simulation and engineering tools for CHCP simulation, and an agreement upon a common simulation environment within the PolySMART project. Next, numerical models for components in the demonstration projects have been developed. These models are available to the PolySMART consortium. Of all modeled components an overall and detailed working principle is formulated, including a parameter list and (in some cases) a control strategy. Finally, for four CHCP systems in the PolySMART project, a system simulation model has been developed. For each system simulation a separate deliverable is available (D5.5b to D5.5e) These deliverables replace deliverable 5.4 ‘system models’. The numerical models for components and systems developed in the Polysmart project form a valuable basis for the component development and optimisation and for the system optimisation, both within and outside the project. Developers and researchers interested in more information about specific models can refer to the institutes and contact persons involved in the model development.
Resumo:
The PolySMART demonstration system SP1b has been modeled in TRNSYS and calibrated against monitored data. The system is an example of distributed cooling with centralized CHP, where the driving heat is delivered via the district heating network. The system pre-cools the cooling water for the head office of Borlänge municipality, for which the main cooling is supplied by a 200 kW compression chiller. The SP1b system thus provides pre-cooling. It consists of ClimateWell TDC with nominal capacity of 10 kW together with a dry cooler for recooling and heat exchangers in the cooling and driving circuits. The cooling system is only operated from 06:00 to 17:00 during working days, and the cooling season is generally from mid May to mid September. The nominal operating conditions of the main chiller are 12/15°C. The main aims of this simulation study were to: reduce the electricity consumption, and if possible to improve the thermal COP and capacity at the same time; and to study how the system would perform with different boundary conditions such as climate and load. The calibration of the system model was made in three stages: estimation of parameters based on manufacturer data and dimensions of the system; calibration of each circuit (pipes and heat exchangers) separately using steady state point; and finally calibration of the complete model in terms of thermal and electrical energy as well as running times, for a five day time series of data with one minute average data values. All the performance figures were with 3% of the measured values apart from the running time for the driving circuit that was 4% different. However, the performance figures for this base case system for the complete cooling season of mid-May to midSeptember were significantly better than those for the monitoring data. This was attributed to long periods when the monitored system was not in operation and due to a control parameter that hindered cold delivery at certain times.