3 resultados para total cost

em Dalarna University College Electronic Archive


Relevância:

60.00% 60.00%

Publicador:

Resumo:

Today there are many system development projects that break both budget and time plan. Often this depends on defects in the information systems that could have been prevented. The cost of test can in some cases be as high as 50 % of the projects total cost and it's at the same time an important part of development. Test as such has moved its focus from the software it self and its faults to a wider perspective on whole infrastructures of information systems where assure a good quality is important. Sogeti in the Netherlands have developed a test method called TMap (Test Management approach) that can be used for structured testing of information systems. TMap haven't been used as much as desired in the office in Borlänge. Because Microsoft is releasing a new version of their platform Visual Studio Team System (VSTS 2010) some colleges at Sogeti in the Netherlands are about to develop a template that can support the use of TMap in VSTS 2010. When we write this the template is still in development. The goal for Sogeti was to find out the differences between the test functionality in VSTS 2008 and 2010. By using the purpose with this essay, which was to analyze the test process in VSTS 2008 with TMap against the test process in VSTS 2010 together with the template we got much help to achieve the goal. The analysis was done with four different aspects: The TPI and TMMi models, problem and strength analyses and a few question formulations. The TPI and TMMi models where used to analyses and evaluate the test process. The analysis showed that there were differences between the both test processes. VSTS 2010 together with the template gave a better support to use TMap and perform test. In VSTS 2010 the test tool Camano is connected to TFS and the tool is also to make the execution and logging of tests easier. This leads to a test process that is easier to handle and has a better support for TMap.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Companies implement a module product assortment as a part of their strategy to, among others, shorten lead-times, increase the product quality and to create more product variants with fever parts. However, the increased number of variants becomes a challenging task for the personnel responsible for the product verifications. By implementing verifications at module level, so called MPV (Module Property Verification) several advantages ensue. The advantages is not only a decrease in cost of verifications, but also a decrease in repair times, occupied space, storages with spare parts, and repair tools. Further, MPV also give an increased product quality due to an increased understanding of which defects that may occur. As an approach to implement MPV, this paper discusses defects and verification processes based on a study at a Swedish company. It also describes a matrix which is used to map relations between company specific cost drivers and so called verification factors. The matrix may indicate cost drivers which have a large impact on the total cost of product verifications.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This thesis uses zonal travel cost method (ZTCM) to estimate consumer surplus of Peace & Love festival in Borlänge, Sweden. The study defines counties as zones of origin of the visitors. Visiting rates from each zone are estimated based on survey data. The study is novel due to the fact that mostly TCM has been applied in the environmental and recreational sector, not for short term events, like P&L festival. The analysis shows that travel cost has a significantly negative effect on visiting rate as expected. Even though income has previously shown to be significant in similar studies, it turns out to be insignificant in this study. A point estimate for the total consumer surplus of P&L festival is 35.6 million Swedish kronor. However, this point estimate is associated with high uncertainty since a 95 % confidence interval for it is (17.9, 53.2). It is also important to note that the estimated value only represents one part of the total economic value, the other values of the festival's totaleconomic value have not been estimated in this thesis.