2 resultados para software agents

em Dalarna University College Electronic Archive


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Bergkvist insjön AB is a sawmill yard which is capable of producing 350,000 cubic meter of timber every year this requires lot of internal resources. Sawmill operations can be classified as unloading, sorting, storage and production of timber. In the company we have trucks arriving at random they have to be unloaded and sent back at the earliest to avoid queuing up of trucks creating a problem for truck owners. The sawmill yard has to operate with two log stackers that does several tasks including transporting the logs from trucks to measurement station where the logs will be sorted into classes and dropped into pockets from pockets to the sorted timber yard where they are stored and finally from there to sawmill for final processing. The main issue that needs to be answered here is the lining up trucks that are waiting to be unload, creating a problem for both sawmill as well as the truck owners and given huge production volume, it is certain that handling of resources is top priority. A key challenge in handling of resources would be unloading of trucks and finding a way to optimize internal resources.To address this problem i have experimented on different ways of using internal resources, i have designed different cases, in case 1 we have both the log stackers working on sawmill and measurement station. The main objective of having this case is to make sawmill and measurement station to work all the time. Then in case 2, i have divided the work between both the log stackers, one log stacker will be working on sawmill and pocket_control and second log stacker will be working on measurement station and truck. Then in case 3 we have only one log stacker working on all the agents, this case was designed to reduce cost of production, as the experiment cannot be done in real-time due to operational cost, for this purpose simulation is used, preliminary investigation into simulation results suggested that case 2 is the best option has it reduced waiting time of trucks considerably when compared with other cases and it showed 50% increase in optimizing internal resources.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The main objective of this thesis work is to develop communication link between Runrev Revolution (IDE) and JADE (Multi-Agent System) through Socket programming using TCP/IP layer. These two independent platforms are connected using socket programming technique. Socket programming is considered to be newly emerging technology among these two platforms, the work done in this thesis work is considered to be a prototype.A Graphical simulation model is developed by salixphere (Company in Hedemora) to simulate logistic problems using Runrev Revolution (IDE). The simulation software/program is called “BIOSIM”. The logistic problems are complex, and conventional optimization techniques are unlikely very successful. “BIOSIM” can demonstrate the graphical representation of logistic problems depending upon the problem domains. As this simulation model is developed in revolution programming language (Transcript) which is dynamically typed and English-like language, it is quite slow compared to other high level programming languages. The object of this thesis work is to add intelligent behaviour in graphical objects and develop communication link between Runrev revolution (IDE) and JADE (Multi-Agent System) using TCP/IP layers.The test shows the intelligent behaviour in the graphical objects and successful communication between Runrev Revolution (IDE) and JADE (Multi-Agent System).