2 resultados para schedule of cleanings

em Dalarna University College Electronic Archive


Relevância:

30.00% 30.00%

Publicador:

Resumo:

This thesis is done to solve two issues for Sayid Paper Mill Ltd Pakistan. Section one deals with a practical problem arise in SPM that is cutting a given set of raw paper rolls of known length and width, and a set of product paper rolls of known length (equal to the length of raw paper rolls) and width, practical cutting constraints on a single cutting machine, according to demand orders for all customers. To solve this problem requires to determine an optimal cutting schedule to maximize the overall cutting process profitability while satisfying all demands and cutting constraints. The aim of this part of thesis is to develop a mathematical model which solves this problem.Second section deals with a problem of delivering final product from warehouse to different destinations by finding shortest paths. It is an operational routing problem to decide the daily routes for sending trucks to different destination to deliver their final product. This industrial problem is difficult and includes aspect such as delivery to a single destination and multiple destinations with limited resources. The aim of this part of thesis is to develop a process which helps finding shortest path.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper summarises the results of using image processing technique to get information about the load of timber trucks before their arrival using digital images or geo tagged images. Once the images are captured and sent to sawmill by drivers from forest, we can predict their arrival time using geo tagged coordinates, count the number of (timber) logs piled up in a truck, identify their type and calculate their diameter. With this information we can schedule and prioritise the inflow and unloading of trucks in the light of production schedules and raw material stocks available at the sawmill yard. It is important to keep all the actors in a supply chain integrated coordinated, so that optimal working routines can be reached in the sawmill yard.