2 resultados para parallel processor

em Dalarna University College Electronic Archive


Relevância:

20.00% 20.00%

Publicador:

Resumo:

The present work will explain a method to achieve a remote controlled (via IR LED) alphanumeric Liquid Crystal Display. In modern times, the remote access of different devices has become quite popular, therefore, the aim of this project is to provide a useful tool that will integrate common and easy to access devices. The system includes a C language based user interface, an assembly language code for the AT89C51ED2 microcontroller instructions and some digital electronic circuits needed for the driving and control of both the LCD and the infrared communication, as well as the PC with a parallel port. The interaction of all the devices provides a whole system that can be helpful in different applications, or it can be separated into each one of its different stages to take the best advantage as possible.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In order to achieve the high performance, we need to have an efficient scheduling of a parallelprogram onto the processors in multiprocessor systems that minimizes the entire executiontime. This problem of multiprocessor scheduling can be stated as finding a schedule for ageneral task graph to be executed on a multiprocessor system so that the schedule length can be minimize [10]. This scheduling problem is known to be NP- Hard.In multi processor task scheduling, we have a number of CPU’s on which a number of tasksare to be scheduled that the program’s execution time is minimized. According to [10], thetasks scheduling problem is a key factor for a parallel multiprocessor system to gain betterperformance. A task can be partitioned into a group of subtasks and represented as a DAG(Directed Acyclic Graph), so the problem can be stated as finding a schedule for a DAG to beexecuted in a parallel multiprocessor system so that the schedule can be minimized. Thishelps to reduce processing time and increase processor utilization. The aim of this thesis workis to check and compare the results obtained by Bee Colony algorithm with already generatedbest known results in multi processor task scheduling domain.