2 resultados para large antenna array

em Dalarna University College Electronic Archive


Relevância:

30.00% 30.00%

Publicador:

Resumo:

One of the main aims of this thesis is to design an optimized commercial Photovoltaic (PV) system in Barbados from several variables such as racking type, module type and inverter type based on practicality, technical performance as well as financial returns to the client. Detailed simulations are done in PVSYST and financial models are used to compare different systems and their viability. Once the preeminent system is determined from a financial and performance perspective a detailed design is done using PVSYST and AutoCAD to design the most optimal PV system for the customer. In doing so, suitable engineering drawings are generated which are detailed enough for construction of the system. Detailed cost with quotes from relevant manufacturers, suppliers and estimators become instrumental in determining Balance of System Costs in addition to total project cost. The final simulated system is suggested with a PV capacity of 425kW and an inverter output of 300kW resulting in an array oversizing of 1.42. The PV system has a weighted Performance Ratio of 77 %, a specific yield of 1467 kWh/kWp and a projected annual production of 624 MWh/yr. This system is estimated to offset approximately 28 % of Carlton’s electrical load annually. Over the course of 20 years the PV system is projected to produce electricity at a cost of $0.201USD/kWh which is significantly lower than the $0.35 USD/kWh paid to the utility at the time of writing this thesis. Due to the high cost of electricity on the island, an attractive Feed-In-Tariff is not necessary to warrant the installation of a commercial System which over a lifetime which produces electricity at less than 60% of the cost to the user purchasing electricity from the utility. A simple payback period of 5.4 years, a return on investment of 17 % without incentives, in addition to an estimated diversion of 6840 barrels of oil or 2168 tonnes of CO2 further provides compelling justification for the installation of a commercial Photovoltaic System not only on Carlton A-1 Supermarket, but also island wide as well as regionally where most electricity supplies are from imported fossil fuels.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

A common problem when planning large free field PV-plants is optimizing the ground occupation ratio while maintaining low shading losses. Due to the complexity of this task, several PV-plants have been built using various configurations. In order to compare the shading losses of different PV technologies and array designs, empirical performance data of five free field PV-plants operating in Germany was analyzed. The data collected comprised 140 winter days from October 2011 until March 2012. The relative shading losses were estimated by comparing the energy output of selected arrays in the front rows (shading-free) against that of shaded arrays in the back rows of the same plant. The results showed that landscape mounting with mc-Si PV-modules yielded significantly better results than portrait one. With CIGS modules, making cross-table strings using the lower modules was not beneficial as expected and had more losses than a one-string-per-table layout. Parallel substrings with CdTe showed relatively low losses. Among the two CdTe products analyzed, none showed a significantly better performance.