8 resultados para k-out-of-n system
em Dalarna University College Electronic Archive
Resumo:
The main objective for this degree project is to implement an Application Availability Monitoring (AAM) system named Softek EnView for Fujitsu Services. The aim of implementing the AAM system is to proactively identify end user performance problems, such as application and site performance, before the actual end users experience them. No matter how well applications and sites are designed and nomatter how well they meet business requirements, they are useless to the end users if the performance is slow and/or unreliable. It is important for the customers to find out whether the end user problems are caused by the network or application malfunction. The Softek EnView was comprised of the following EnView components: Robot, Monitor, Reporter, Collector and Repository. The implemented system, however, is designed to use only some of these EnView elements: Robot, Reporter and depository. Robots can be placed at any key user location and are dedicated to customers, which means that when the number of customers increases, at the sametime the amount of Robots will increase. To make the AAM system ideal for the company to use, it was integrated with Fujitsu Services’ centralised monitoring system, BMC PATROL Enterprise Manager (PEM). That was actually the reason for deciding to drop the EnView Monitor element. After the system was fully implemented, the AAM system was ready for production. Transactions were (and are) written and deployed on Robots to simulate typical end user actions. These transactions are configured to run with certain intervals, which are defined collectively with customers. While they are driven against customers’ applicationsautomatically, transactions collect availability data and response time data all the time. In case of a failure in transactions, the robot immediately quits the transactionand writes detailed information to a log file about what went wrong and which element failed while going through an application. Then an alert is generated by a BMC PATROL Agent based on this data and is sent to the BMC PEM. Fujitsu Services’ monitoring room receives the alert, reacts to it according to the incident management process in ITIL and by alerting system specialists on critical incidents to resolve problems. As a result of the data gathered by the Robots, weekly reports, which contain detailed statistics and trend analyses of ongoing quality of IT services, is provided for the Customers.
Resumo:
This thesis is done to solve two issues for Sayid Paper Mill Ltd Pakistan. Section one deals with a practical problem arise in SPM that is cutting a given set of raw paper rolls of known length and width, and a set of product paper rolls of known length (equal to the length of raw paper rolls) and width, practical cutting constraints on a single cutting machine, according to demand orders for all customers. To solve this problem requires to determine an optimal cutting schedule to maximize the overall cutting process profitability while satisfying all demands and cutting constraints. The aim of this part of thesis is to develop a mathematical model which solves this problem.Second section deals with a problem of delivering final product from warehouse to different destinations by finding shortest paths. It is an operational routing problem to decide the daily routes for sending trucks to different destination to deliver their final product. This industrial problem is difficult and includes aspect such as delivery to a single destination and multiple destinations with limited resources. The aim of this part of thesis is to develop a process which helps finding shortest path.
Resumo:
The main idea of this research to solve the problem of inventory management for the paper industry SPM PVT limited. The aim of this research was to find a methodology by which the inventory of raw material could be kept at minimum level by means of buffer stock level.The main objective then lies in finding the minimum level of buffer stock according to daily consumption of raw material, finding the Economic Order Quantity (EOQ) reorders point and how much order will be placed in a year to control the shortage of raw material.In this project, we discuss continuous review model (Deterministic EOQ models) that includes the probabilistic demand directly in the formulation. According to the formula, we see the reorder point and the order up to model. The problem was tackled mathematically as well as simulation modeling was used where mathematically tractable solution was not possible.The simulation modeling was done by Awesim software for developing the simulation network. This simulation network has the ability to predict the buffer stock level based on variable consumption of raw material and lead-time. The data collection for this simulation network is taken from the industrial engineering personnel and the departmental studies of the concerned factory. At the end, we find the optimum level of order quantity, reorder point and order days.
Resumo:
This report describes work on the thesis “IT systems and organizational development”. The work is carried out on Stocksbro Energi AB, during spring 2009. The company wanted better flow in their production but also review if the inventory management function located in Visma SPCS Administration 2000, could be used in the organization. Under the first part of this report the system were tested to ensure if the system would work together with the organization. After testing the desired features they were evaluated along with two of the users to the system at the company. The wanted functions could not be obtained whenthe Admin 2000 is an economic system and are not made for the producing companies. Thereafter the theoretical possibility was examined of introducing a more advanced system to get the desired functionality to work together with the organization. To introduce a more advanced system will require major changes of the organization, before, during and after the introduction. It is therefore important how the management implements a possibility of a new system. It’s important to make the staff join in this implementation but also get as much as possible out of the system.To conclude the thesis a goal and problem analysis but also a solution proposal was made with the help of the FA/SIMM method. Also some suggestions are mentioned how the company could proceed in the implementation of the proposals for a solution.
Resumo:
This study has investigated the question of relation between literacy practices in and out of school in rural Tanzania. By using the perspective of linguistic anthropology, literacy practices in five villages in Karagwe district in the northwest of Tanzania have been analysed. The outcome may be used as a basis for educational planning and literacy programs. The analysis has revealed an intimate relation between language, literacy and power. In Karagwe, traditional élites have drawn on literacy to construct and reconstruct their authority, while new élites, such as individual women and some young people have been able to use literacy as one tool to get access to power. The study has also revealed a high level of bilingualism and a high emphasis on education in the area, which prove a potential for future education in the area. At the same time discontinuity in language use, mainly caused by stigmatisation of what is perceived as local and traditional, such as the mother-tongue of the majority of the children, and the high status accrued to all that is perceived as Western, has turned out to constitute a great obstacle for pupils’ learning. The use of ethnographic perspectives has enabled comparisons between interactional patterns in schools and outside school. This has revealed communicative patterns in school that hinder pupils’ learning, while the same patterns in other discourses reinforce learning. By using ethnography, relations between explicit and implicit language ideologies and their impact in educational contexts may be revealed. This knowledge may then be used to make educational plans and literacy programmes more relevant and efficient, not only in poor post-colonial settings such as Tanzania, but also elsewhere, such as in Western settings.
Resumo:
Planning policies in several European countries have aimed at hindering the expansion of out-of-town shopping centers. One argument for this is concern for the increase in transport and a resulting increase in environmental externalities such as CO2-emissions. This concern is weakly founded in science as few studies have attempted to measure CO2-emissions of shopping trips as a function of the location of the shopping centers. In this paper we conduct a counter-factual analysis comparing downtown, edge-of-town and out-of-town shopping. In this comparison we use GPS to track 250 consumers over a time-span of two months in a Swedish region. The GPS-data enters the Oguchi’s formula to obtain shopping trip-specific CO2-emissions. We find that consumers’ out-of-town shopping would generate an excess of 60 per cent CO2-emissions whereas downtown and edge-of-town shopping centers are comparable.