2 resultados para farm equipment
em Dalarna University College Electronic Archive
Resumo:
The Thesis focused on hardware based Load balancing solution of web traffic through a load balancer F5 content switch. In this project, the implemented scenario for distributing HTTPtraffic load is based on different CPU usages (processing speed) of multiple member servers.Two widely used load balancing algorithms Round Robin (RR) and Ratio model (weighted Round Robin) are implemented through F5 load balancer. For evaluating the performance of F5 content switch, some experimental tests has been taken on implemented scenarios using RR and Ratio model load balancing algorithms. The performance is examined in terms of throughput (bits/sec) and Response time of member servers in a load balancing pool. From these experiments we have observed that Ratio Model load balancing algorithm is most suitable in the environment of load balancing servers with different CPU usages as it allows assigning the weight according to CPU usage both in static and dynamic load balancing of servers.
Resumo:
Over the last decade, we have seen a massive increase in the construction of wind farms in northern Fennoscandia. Wind farms comprising hundreds of wind turbines are being built, with little knowledge of the possible cumulative adverse effects on the habitat use and migration of semi-domesticated free-ranging reindeer. We assessed how reindeer responded to wind farm construction in an already fragmented landscape, with specific reference to the effects on use of movement corridors and reindeer habitat selection. We used GPS-data from reindeer during calving and post-calving in the MalAyen reindeer herding community in Sweden. We analysed data from the pre-development years compared to the construction years of two relatively small wind farms. During construction of the wind farms, use of original migration routes and movement corridors within 2 km of development declined by 76 %. This decline in use corresponded to an increase in activity of the reindeer measured by increased step lengths within 0-5 km. The step length was highest nearest the development and declining with distance, as animals moved towards migration corridors and turned around or were observed in holding patterns while not crossing. During construction, reindeer avoided the wind farms at both regional and landscape scale of selection. The combined construction activities associated with even a few wind turbines combined with power lines and roads in or close to central movement corridors caused a reduction in the use of such corridors and grazing habitat and increased the fragmentation of the reindeer calving ranges.