6 resultados para cost-informed process execution
em Dalarna University College Electronic Archive
Resumo:
Today there are many system development projects that break both budget and time plan. Often this depends on defects in the information systems that could have been prevented. The cost of test can in some cases be as high as 50 % of the projects total cost and it's at the same time an important part of development. Test as such has moved its focus from the software it self and its faults to a wider perspective on whole infrastructures of information systems where assure a good quality is important. Sogeti in the Netherlands have developed a test method called TMap (Test Management approach) that can be used for structured testing of information systems. TMap haven't been used as much as desired in the office in Borlänge. Because Microsoft is releasing a new version of their platform Visual Studio Team System (VSTS 2010) some colleges at Sogeti in the Netherlands are about to develop a template that can support the use of TMap in VSTS 2010. When we write this the template is still in development. The goal for Sogeti was to find out the differences between the test functionality in VSTS 2008 and 2010. By using the purpose with this essay, which was to analyze the test process in VSTS 2008 with TMap against the test process in VSTS 2010 together with the template we got much help to achieve the goal. The analysis was done with four different aspects: The TPI and TMMi models, problem and strength analyses and a few question formulations. The TPI and TMMi models where used to analyses and evaluate the test process. The analysis showed that there were differences between the both test processes. VSTS 2010 together with the template gave a better support to use TMap and perform test. In VSTS 2010 the test tool Camano is connected to TFS and the tool is also to make the execution and logging of tests easier. This leads to a test process that is easier to handle and has a better support for TMap.
Resumo:
Setup time reduction facilitate the flexibility needed for just-in-time production. An integrated steel mill with meltshop, continuous caster and hot rolling mill is often operated as decoupled processes. Setup time reduction provides the flexibility needed to reduce buffering, shorten lead times and create an integrated process flow. The interdependency of setup times, process flexibility and integration were analysed through system dynamics simulation. The results showed significant reductions of energy consumption and tied capital. It was concluded that setup time reduction in the hot strip mill can aid process integration and hence improve production economy while reducing environmental impact.
Resumo:
The cost of a road construction over its service life is a function of design, quality of construction as well as maintenance strategies and operations. An optimal life-cycle cost for a road requires evaluations of the above mentioned components. Unfortunately, road designers often neglect a very important aspect, namely, the possibility to perform future maintenance activities. Focus is mainly directed towards other aspects such as investment costs, traffic safety, aesthetic appearance, regional development and environmental effects. This doctoral thesis presents the results of a research project aimed to increase consideration of road maintenance aspects in the planning and design process. The following subgoals were established: Identify the obstacles that prevent adequate consideration of future maintenance during the road planning and design process; and Examine optimisation of life-cycle costs as an approach towards increased efficiency during the road planning and design process. The research project started with a literature review aimed at evaluating the extent to which maintenance aspects are considered during road planning and design as an improvement potential for maintenance efficiency. Efforts made by road authorities to increase efficiency, especially maintenance efficiency, were evaluated. The results indicated that all the evaluated efforts had one thing in common, namely ignorance of the interrelationship between geometrical road design and maintenance as an effective tool to increase maintenance efficiency. Focus has mainly been on improving operating practises and maintenance procedures. This fact might also explain why some efforts to increase maintenance efficiency have been less successful. An investigation was conducted to identify the problems and difficulties, which obstruct due consideration of maintainability during the road planning and design process. A method called “Change Analysis” was used to analyse data collected during interviews with experts in road design and maintenance. The study indicated a complex combination of problems which result in inadequate consideration of maintenance aspects when planning and designing roads. The identified problems were classified into six categories: insufficient consulting, insufficient knowledge, regulations and specifications without consideration of maintenance aspects, insufficient planning and design activities, inadequate organisation and demands from other authorities. Several urgent needs for changes to eliminate these problems were identified. One of the problems identified in the above mentioned study as an obstacle for due consideration of maintenance aspects during road design was the absence of a model for calculating life-cycle costs for roads. Because of this lack of knowledge, the research project focused on implementing a new approach for calculating and analysing life-cycle costs for roads with emphasis on the relationship between road design and road maintainability. Road barriers were chosen as an example. The ambition is to develop this approach to cover other road components at a later stage. A study was conducted to quantify repair rates for barriers and associated repair costs as one of the major maintenance costs for road barriers. A method called “Case Study Research Method” was used to analyse the effect of several factors on barrier repairs costs, such as barrier type, road type, posted speed and seasonal effect. The analyses were based on documented data associated with 1625 repairs conducted in four different geographical regions in Sweden during 2006. A model for calculation of average repair costs per vehicle kilometres was created. Significant differences in the barrier repair costs were found between the studied barrier types. In another study, the injuries associated with road barrier collisions and the corresponding influencing factors were analysed. The analyses in this study were based on documented data from actual barrier collisions between 2005 and 2008 in Sweden. The result was used to calculate the cost for injuries associated with barrier collisions as a part of the socio-economic cost for road barriers. The results showed significant differences in the number of injuries associated with collisions with different barrier types. To calculate and analyse life-cycle costs for road barriers a new approach was developed based on a method called “Activity-based Life-cycle Costing”. By modelling uncertainties, the presented approach gives a possibility to identify and analyse factors crucial for optimising life-cycle costs. The study showed a great potential to increase road maintenance efficiency through road design. It also showed that road components with low investment costs might not be the best choice when including maintenance and socio-economic aspects. The difficulties and problems faced during the collection of data for calculating life-cycle costs for road barriers indicated a great need for improving current data collecting and archiving procedures. The research focused on Swedish road planning and design. However, the conclusions can be applied to other Nordic countries, where weather conditions and road design practices are similar. The general methodological approaches used in this research project may be applied also to other studies.
Resumo:
The capacitor test process at ABB Capacitors in Ludvika must be improved to meet future demands for high voltage products. To find a solution to how to improve the test process, an investigation was performed to establish which parts of the process are used and how they operate. Several parts which can improves the process were identified. One of them was selected to be improved in correlation with the subject, mechanical engineering. Four concepts were generated and decision matrixes were used to systematically select the best concept. By improving the process several benefits has been added to the process. More units are able to be tested and lead time is reduced. As the lead time is reduced the cost for each unit is reduced, workers will work less hours for the same amount of tested units, future work to further improve the process is also identified. The selected concept was concept 1, the sway stop concept. This concept is used to reduce the sway of the capacitors as they have entered the test facility, the box. By improving this part of the test process a time saving of 20 seconds per unit can be achieved, equivalent to 7% time reduction. This can be compared to an additional 1400 units each year.
Resumo:
Foreign graduates have been part of the success stories of many developed countries. This is as a result of their immeasurable deposit of ideas, knowledge, and innovation in the host country. Though the process of these foreign graduates penetrating and integrating into the labour market of the host country could be slow and rough as they encounter some obstacles on the way; they still strive to break through and be part of the country’s workforce because they foresee some opportunities therein. This research study is about the obstacles and opportunities foreign graduates meet in Dalarna labour market. The study investigated and identified the obstacles and opportunities foreign graduates meet in Dalarna labour market. For a thorough execution of this research, we collected primary data by handing questionnaires to 65 foreign graduates searching for jobs in Dalarna region and interviewed eight people, among which seven were foreign graduates and one of them was a staff at Arbestförmedlingen (Employment Agency) to give us a general view of the Dalarna labour market. We read previous research works and related articles to understand the topic in order to get an overview of the terminologies and concept to apply. This study concluded that language is a major obstacle foreign graduates meet in the Dalarna labour market. Other possible obstacles include culture, poor integration policies, lack of a placement bureau, lack of trust, limited opportunities, favoritism, lack of jobs, lack of references and experience. On the other hand factors like job availability, outgoing labour force and unskilled labour are possible opportunities foreign graduates meet in the Dalarna labour market. Furthermore flexible work time, good working atmosphere, experience, social security/welfare, good standard of living, family friendly region, higher wages, job security and cheap cost of living are also possible benefits that foreign graduates get in Dalarna.
Resumo:
In a global economy, manufacturers mainly compete with cost efficiency of production, as the price of raw materials are similar worldwide. Heavy industry has two big issues to deal with. On the one hand there is lots of data which needs to be analyzed in an effective manner, and on the other hand making big improvements via investments in cooperate structure or new machinery is neither economically nor physically viable. Machine learning offers a promising way for manufacturers to address both these problems as they are in an excellent position to employ learning techniques with their massive resource of historical production data. However, choosing modelling a strategy in this setting is far from trivial and this is the objective of this article. The article investigates characteristics of the most popular classifiers used in industry today. Support Vector Machines, Multilayer Perceptron, Decision Trees, Random Forests, and the meta-algorithms Bagging and Boosting are mainly investigated in this work. Lessons from real-world implementations of these learners are also provided together with future directions when different learners are expected to perform well. The importance of feature selection and relevant selection methods in an industrial setting are further investigated. Performance metrics have also been discussed for the sake of completion.