6 resultados para cable capacitive current

em Dalarna University College Electronic Archive


Relevância:

20.00% 20.00%

Publicador:

Resumo:

The cost of a road construction over its service life is a function of design, quality of construction as well as maintenance strategies and operations. An optimal life-cycle cost for a road requires evaluations of the above mentioned components. Unfortunately, road designers often neglect a very important aspect, namely, the possibility to perform future maintenance activities. Focus is mainly directed towards other aspects such as investment costs, traffic safety, aesthetic appearance, regional development and environmental effects. This doctoral thesis presents the results of a research project aimed to increase consideration of road maintenance aspects in the planning and design process. The following subgoals were established: Identify the obstacles that prevent adequate consideration of future maintenance during the road planning and design process; and Examine optimisation of life-cycle costs as an approach towards increased efficiency during the road planning and design process. The research project started with a literature review aimed at evaluating the extent to which maintenance aspects are considered during road planning and design as an improvement potential for maintenance efficiency. Efforts made by road authorities to increase efficiency, especially maintenance efficiency, were evaluated. The results indicated that all the evaluated efforts had one thing in common, namely ignorance of the interrelationship between geometrical road design and maintenance as an effective tool to increase maintenance efficiency. Focus has mainly been on improving operating practises and maintenance procedures. This fact might also explain why some efforts to increase maintenance efficiency have been less successful. An investigation was conducted to identify the problems and difficulties, which obstruct due consideration of maintainability during the road planning and design process. A method called “Change Analysis” was used to analyse data collected during interviews with experts in road design and maintenance. The study indicated a complex combination of problems which result in inadequate consideration of maintenance aspects when planning and designing roads. The identified problems were classified into six categories: insufficient consulting, insufficient knowledge, regulations and specifications without consideration of maintenance aspects, insufficient planning and design activities, inadequate organisation and demands from other authorities. Several urgent needs for changes to eliminate these problems were identified. One of the problems identified in the above mentioned study as an obstacle for due consideration of maintenance aspects during road design was the absence of a model for calculating life-cycle costs for roads. Because of this lack of knowledge, the research project focused on implementing a new approach for calculating and analysing life-cycle costs for roads with emphasis on the relationship between road design and road maintainability. Road barriers were chosen as an example. The ambition is to develop this approach to cover other road components at a later stage. A study was conducted to quantify repair rates for barriers and associated repair costs as one of the major maintenance costs for road barriers. A method called “Case Study Research Method” was used to analyse the effect of several factors on barrier repairs costs, such as barrier type, road type, posted speed and seasonal effect. The analyses were based on documented data associated with 1625 repairs conducted in four different geographical regions in Sweden during 2006. A model for calculation of average repair costs per vehicle kilometres was created. Significant differences in the barrier repair costs were found between the studied barrier types. In another study, the injuries associated with road barrier collisions and the corresponding influencing factors were analysed. The analyses in this study were based on documented data from actual barrier collisions between 2005 and 2008 in Sweden. The result was used to calculate the cost for injuries associated with barrier collisions as a part of the socio-economic cost for road barriers. The results showed significant differences in the number of injuries associated with collisions with different barrier types. To calculate and analyse life-cycle costs for road barriers a new approach was developed based on a method called “Activity-based Life-cycle Costing”. By modelling uncertainties, the presented approach gives a possibility to identify and analyse factors crucial for optimising life-cycle costs. The study showed a great potential to increase road maintenance efficiency through road design. It also showed that road components with low investment costs might not be the best choice when including maintenance and socio-economic aspects. The difficulties and problems faced during the collection of data for calculating life-cycle costs for road barriers indicated a great need for improving current data collecting and archiving procedures. The research focused on Swedish road planning and design. However, the conclusions can be applied to other Nordic countries, where weather conditions and road design practices are similar. The general methodological approaches used in this research project may be applied also to other studies.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Going from having bought the most essential at the small shops close to home, better communications and an increasingly consumption oriented lifestyle has created a change in shopping behavior and has led to phenomenon such as shopping centres and more. These are constantly being built in Sweden: in the cities, outside the cities and more recently even in small cities -small cities as for one reason or another have access to a larger customer base which can have businesses to flourish economically. During the first decade of the 21st century, shopping centres have been established along the Swedish/Norwegian border. Since the Norwegian Krone is much stronger than the Swedish Krona Norwegians save a great deal of money on going to Sweden to shop. During the shopping trips to Sweden, it is mostly alcohol, meat, tobacco and candy that are being bought. However, other products such as clothing, technology, household appliances and more are also being purchased, all to save money on the trip. Together these cross border shoppers spent 11, 6 billion in Sweden during the year of 2010. This gives an average spending of approximately 10 900 SEK per cross border shopper on annual basis. Nordby, Töcksfors and Charlottenberg (small cities located in southwestern Sweden) are places characterized by Norwegian cross border shopping. Together, they generate billions every year and this only seems to increase. These places are relatively small in size but have prominent attributes such as proximity to the Norwegian border. Apart from these resorts and shopping centres, there are few or none similar places near the Norwegian border in the rest of Sweden. However, a place which is geographically well located and has a relatively large Norwegian and Swedish customer base is the ski resort of Sälen in west central of Sweden. Sälen is a village located near the Norwegian border, although fairly sparsely populated. The destination has annually about one million official guest nights, based on the 414 000 visitors who stay an average of about 4, 5 days.  Per visit, these tourists individually spend an average of 862 SEK on shopping at the destination. The expenditure of the mountain tourists together with the Norwegian border shoppers makes it very interesting to explore the opportunities for shopping development in terms of a shopping centre in the region of Sälen.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Objective: For the evaluation of the energetic performance of combined renewable heating systems that supply space heat and domestic hot water for single family houses, dynamic behaviour, component interactions, and control of the system play a crucial role and should be included in test methods. Methods: New dynamic whole system test methods were developed based on “hardware in the loop” concepts. Three similar approaches are described and their differences are discussed. The methods were applied for testing solar thermal systems in combination with fossil fuel boilers (heating oil and natural gas), biomass boilers, and/or heat pumps. Results: All three methods were able to show the performance of combined heating systems under transient operating conditions. The methods often detected unexpected behaviour of the tested system that cannot be detected based on steady state performance tests that are usually applied to single components. Conclusion: Further work will be needed to harmonize the different test methods in order to reach comparable results between the different laboratories. Practice implications: A harmonized approach for whole system tests may lead to new test standards and improve the accuracy of performance prediction as well as reduce the need for field tests.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Swedish upper secondary school has made a transition from a school for the elite to be a school for everybody. When almost every youth nowadays chooses to continue studying, for some of them this is not what they want to do most of all. However, as there in practice is no choice, there come up problems and many upper secondary school teachers experience a growing frustration. We will here discuss some aspects of the following questions: -  How do upper secondary schoolteachers handle their working-conditions in a new situation? - What possible consequences do this have on teacher education?

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper elaborates the routing of cable cycle through available routes in a building in order to link a set of devices, in a most reasonable way. Despite of the similarities to other NP-hard routing problems, the only goal is not only to minimize the cost (length of the cycle) but also to increase the reliability of the path (in case of a cable cut) which is assessed by a risk factor. Since there is often a trade-off between the risk and length factors, a criterion for ranking candidates and deciding the most reasonable solution is defined. A set of techniques is proposed to perform an efficient and exact search among candidates. A novel graph is introduced to reduce the search-space, and navigate the search toward feasible and desirable solutions. Moreover, admissible heuristic length estimation helps to early detection of partial cycles which lead to unreasonable solutions. The results show that the method provides solutions which are both technically and financially reasonable. Furthermore, it is proved that the proposed techniques are very efficient in reducing the computational time of the search to a reasonable amount.