6 resultados para WALLS
em Dalarna University College Electronic Archive
Resumo:
The study shows the current need for security solutions concerning work with information in different areas.Investigations will show important solutions for printers’ needs to meet the increasingly harder demands forfast and safe digital communications. Important factors to be analyzed in the investigations are: access todifferent types of information, workers authority of information, access to the data base register internallyand externally, production solutions for an effective fault detection and data base solutions fororders and distribution.Planned and unplanned stops result in a standard of value in interruptions. Internal data bases areprotected by so-called “Fire Walls”, “Watch Dogs” and Virtual Private Networks. Offset plates are locked infor a definitive range of time. Subsequent destruction and remaining sheets are shredded and recycled. Alldocumentation is digital, in business control systems, which guarantees that no important documents arelying around in working places. Fault detection work is facilitated by the ability to fully track the order numberson incoming orders.
Resumo:
Extramural learning refers to the educational process that takes place outside the walls of the school (or the university). Extramural learning that takes place in a science center is characterized by hands-on and interactivity. Interactive solar energy exhibits are particularly well suited for out-door science centers. The paper presents some solar energy hands-on exhibits and extramural activities that the author has initiated and participated in.
Resumo:
This master thesis presents a new technological combination of two environmentally friendly sources of energy in order to provide DHW, and space heating. Solar energy is used for space heating, and DHW production using PV modules which supply direct current directly to electrical heating elements inside a water storage tank. On the other hand a GSHP system as another source of renewable energy provides heat in the water storage tank of the system in order to provide DHW and space heating. These two sources of renewable energy have been combined in this case-study in order to obtain a more efficient system, which will reduce the amount of electricity consumed by the GSHP system.The key aim of this study is to make simulations, and calculations of the amount ofelectrical energy that can be expected to be produced by a certain amount of PV modules that are already assembled on a house in Vantaa, southern Finland. This energy is then intended to be used as a complement to produce hot water in the heating system of the house beside the original GSHP system. Thus the amount of electrical energy purchased from the grid should be reduced and the compressor in the GSHP would need fewer starts which would reduce the heating cost of the GSHP system for space heating and providing hot water.The produced energy by the PV arrays in three different circuits will be charged directly to three electrical heating elements in the water storage tank of the existing system to satisfy the demand of the heating elements. The excess energy can be used to heat the water in the water storage tank to some extent which leads to a reduction of electricity consumption by the different components of the GSHP system.To increase the efficiency of the existing hybrid system, optimization of different PV configurations have been accomplished, and the results are compared. Optimization of the arrays in southern and western walls shows a DC power increase of 298 kWh/year compared with the existing PV configurations. Comparing the results from the optimization of the arrays on the western roof if the intention is to feed AC power to the components of the GSHP system shows a yearly AC power production of 1,646 kWh.This is with the consideration of no overproduction by the PV modules during the summer months. This means the optimized PV systems will be able to cover a larger part of summer demand compared with the existing system.
Resumo:
In this project, Stora Enso’s newly developed building system has been further developed to allow building to the Swedish passive house standard for the Swedish climate. The building system is based on a building framework of CLT (Cross laminated timber) boards. The concept has been tested on a small test building. The experience gained from this test building has also been used for planning a larger building (two storeys with the option of a third storey) with passive house standard with this building system. The main conclusions from the project are: It is possible to build airtight buildings with this technique without using traditional vapour barriers. Initial measurements show that this can be done without reaching critical humidity levels in the walls and roof, at least where wood fibre insulation is used, as this has a greater capacity for storing and evening out the moisture than mineral wool. However, the test building has so far not been exposed to internal generation of moisture (added moisture from showers, food preparation etc.). This needs to be investigated and this will be done during the winter 2013-14. A new fixing method for doors and windows has been tested without traditional fibre filling between them and the CLT panel. The door or window is pressed directly on to the CLT panel instead, with an expandable sealing strip between them. This has been proved to be successful. The air tightness between the CLT panels is achieved with expandable sealing strips between the panels. The position of the sealing strips is important, both for the air tightness itself and to allow rational assembly. Recurrent air tightness measurements show that the air tightness decreased somewhat during the first six months, but not to such an extent that the passive house criteria were not fulfilled. The reason for the decreased air tightness is not clear, but can be due to small movements in the CLT construction and also to the sealing strips being affected by changing outdoor temperatures. Long term measurements (at least two years) have to be carried out before more reliable conclusions can be drawn regarding the long term effect of the construction on air tightness and humidity in the walls. An economic analysis comparing using a concrete frame or the studied CLT frame for a three storey building shows that it is probably more expensive to build with CLT. For buildings higher than three floors, the CLT frame has economic advantages, mainly because of the shorter building time compared to using concrete for the frame. In this analysis, no considerations have been taken to differences in the influence on the environment or the global climate between the two construction methods.
Resumo:
In this paper, Finite Element method and full-scale experiments have been used to study a hot forging method for fabri-cation of a spindle using reduced initial stock size. The forging sequence is carried out in two stages. In the first stage, the hot rolled cylindrical billet is pre-formed and pierced in a closed die using a spherical nosed punch to within 20 mm of its base. This process of piercing or impact extrusion leads to high strains within the work piece but requires high press loads. In the second stage, the resulting cylinder is placed in a die with a flange chamber and upset forged to form a flange. The stock mass is optimized for complete die filling. Process parameters such as effective strain distribution, material flow and forging load in different stages of the process are analyzed. It is concluded from the simulations that minor modifications of piercing punch geometry to reduce contact between the punch and emerging vertical walls of the cylinder appreciably reduces the piercing load. In the flange chamber, a die surfaces angle of 52° instead of 45° is pro-posed to ensure effective material flow and exert sufficient tool pressure to achieve complete cavity filling. In order to achieve better compression, it is also proposed to shorten both the length of the inserted punch and the die “tongues” by a few mm.
Resumo:
Allt hårdare lagkrav gör att det är svårt att energieffektivisera befintliga byggnader utan att förändra deras utseende. Syftet med examensarbetet är att utreda hur stor energieffektivisering, för tre befintliga småhus uppförda under 1900-talet, som är möjlig att uppnå genom förbättring av byggnadernas klimatskal, det vill säga tak, väggar, golv, fönster och dörrar, utan att förvanska byggnadernas utseende och samtidigt bevara deras kulturhistoriska värden. Arbetet bestod av en förstudie där tre byggnader identifierades, ett undersökningsskede där information om byggnaderna togs fram och ett slutsatsskede där energibesparande åtgärdsförslag togs fram och utvärderades. Byggnader som var goda representanter för sin tid och stil söktes. Byggnader från 1910-talet, 1930-talet och 1970-talet, lokaliserades. Sedan gjordes det fallstudier med intervjuer och inventeringar. För att utreda byggnadens klimatskal utfördes u-värdesberäkningar och energiberäkningar av befintliga byggander och byggnader baserade på föreslagna åtgärdsförslag. Ingen av byggnaderna nådde efter föreslagna åtgärder ner till passivhuskravet 59 kWh/år/m2 Atemp eller BBR-kravet 110 kWh/år/m2 Atemp för en byggnads specifika energianvändning. Den största möjliga energieffektivisering för de tre byggnaderna uppförda under 1900-talet, som är möjlig att uppnå utan att förvanska byggnadernas utseende och samtidigt bevara deras kulturhistoriska värden är 13,0 kWh/år/m2 Atemp, 49,7 kWh/år/m2 Atemp respektive 64,8 kWh/år/m2 Atemp. Slutsatser från arbetet är att byggnader från 1910-tal kan åtgärdas genom att isolera fönstren, sätta dit en extra dörr på insidan av ytterdörren samt tilläggsisolera snedtaket. Byggnader från 1930-tal kan åtgärdas genom att isolera fönstren med en isolerruta på insidan av fönstret och dörrarna med en extra dörr på insidan av ytterdörren. Byggnader från 1970-tal kan åtgärda fönstren genom att byta ut dem till energifönster, ingen åtgärd för golvet men fasaden isoleras utvändigt med vakuumisolering. Byggnaden från 1970-talet klarade sig bäst i jämförelsen eftersom den var i autentiskt skick från början vilket gjorde att förbättringen blev större än för till exempel byggnaden från 1910-talet som redan var ombyggd innan åtgärder föreslogs.