2 resultados para Timed and Probabilistic Automata
em Dalarna University College Electronic Archive
Resumo:
The main idea of this research to solve the problem of inventory management for the paper industry SPM PVT limited. The aim of this research was to find a methodology by which the inventory of raw material could be kept at minimum level by means of buffer stock level.The main objective then lies in finding the minimum level of buffer stock according to daily consumption of raw material, finding the Economic Order Quantity (EOQ) reorders point and how much order will be placed in a year to control the shortage of raw material.In this project, we discuss continuous review model (Deterministic EOQ models) that includes the probabilistic demand directly in the formulation. According to the formula, we see the reorder point and the order up to model. The problem was tackled mathematically as well as simulation modeling was used where mathematically tractable solution was not possible.The simulation modeling was done by Awesim software for developing the simulation network. This simulation network has the ability to predict the buffer stock level based on variable consumption of raw material and lead-time. The data collection for this simulation network is taken from the industrial engineering personnel and the departmental studies of the concerned factory. At the end, we find the optimum level of order quantity, reorder point and order days.
Resumo:
This paper is concerned with the cost efficiency in achieving the Swedish national air quality objectives under uncertainty. To realize an ecologically sustainable society, the parliament has approved a set of interim and long-term pollution reduction targets. However, there are considerable quantification uncertainties on the effectiveness of the proposed pollution reduction measures. In this paper, we develop a multivariate stochastic control framework to deal with the cost efficiency problem with multiple pollutants. Based on the cost and technological data collected by several national authorities, we explore the implications of alternative probabilistic constraints. It is found that a composite probabilistic constraint induces considerably lower abatement cost than separable probabilistic restrictions. The trend is reinforced by the presence of positive correlations between reductions in the multiple pollutants.