We consider method of moment fixed effects (FE) estimation of technical inefficiency. When N, the number of cross sectional observations, is large it ispossible to obtain consistent central moments of the population distribution of the inefficiencies. It is well-known that the traditional FE estimator may be seriously upward biased when N is large and T, the number of time observations, is small. Based on the second central moment and a single parameter distributional assumption on the inefficiencies, we obtain unbiased technical inefficiencies in large N settings. The proposed methodology bridges traditional FE and maximum likelihood estimation – bias is reduced without the random effects assumption.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The FE ('fixed effects') estimator of technical inefficiency performs poorly when N ('number of firms') is large and T ('number of time observations') is small. We propose estimators of both the firm effects and the inefficiencies, which have small sample gains compared to the traditional FE estimator. The estimators are based on nonparametric kernel regression of unordered variables, which includes the FE estimator as a special case. In terms of global conditional MSE ('mean square error') criterions, it is proved that there are kernel estimators which are efficient to the FE estimators of firm effects and inefficiencies, in finite samples. Monte Carlo simulations supports our theoretical findings and in an empirical example it is shown how the traditional FE estimator and the proposed kernel FE estimator lead to very different conclusions about inefficiency of Indonesian rice farmers.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This Degree Project is carried through in association with Fototext in Guthenburg. The firmsees benefits using”Soft Proof” technology for both economic and time-saving. The reasonfor ”Soft Proofing” for internal/ external production is to estimate and controll documentswithout using digital or chemical printing output.The different technical solutions to ”Soft Proof”, knowledges and facts aboutColorManagement together with PDF-workflow is going to pattern for a correct succesfull”Soft Proofing” on the monitor.Acrobat 5 in association with Photoshop 6 are effectively used in ”Soft Proofing” technic.The advance and capacity of the graphical softwares which are explained in this reporthelps the users to begin to experiment with ”Soft Proof”. Graphical firms which are interestedto begin working with ”Soft Proof” need to allready have knowledge in ICC-profilingand a practical ColorManaged workflow.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This report describes the outcome of the first visit to Tanzania, within the project "Mini-grids supplied by renewable energy - improving technical and social feasibility". The trip included visits to three different organizations; Ihushi Development Center (IDC) near Mwanza, TIDESO near Bukoba, and Mavuno Project in Karagwe. At IDC, a brief evaluation of the current power system was done and measuring equipment for long term measurements were installed. At all three locations investigations regarding the current and future electricity demand were conducted and connections to people relevant to the study were established. The report is including as well some technical specifications as some observations regarding organization and management of the technical systems. The trip was including only short visits and therefore only brief introductions to the different organizations, based on observations done by the author. The report is hence describing the author’s understanding of the technical system and social structures after only short visits to each of the organizations, and may differ from observations done at another point in time, over a different time period, or by some other person.This report describes the outcome of the first visit to Tanzania, within the project "Mini-grids supplied by renewable energy - improving technical and social feasibility". The trip included visits to three different organizations; Ihushi Development Center (IDC) near Mwanza, TIDESO near Bukoba, and Mavuno Project in Karagwe. At IDC, a brief evaluation of the current power system was done and measuring equipment for long term measurements were installed. At all three locations investigations regarding the current and future electricity demand were conducted and connections to people relevant to the study were established. The report is including as well some technical specifications as some observations regarding organization and management of the technical systems. The trip was including only short visits and therefore only brief introductions to the different organizations, based on observations done by the author. The report is hence describing the author’s understanding of the technical system and social structures after only short visits to each of the organizations, and may differ from observations done at another point in time, over a different time period, or by some other person.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

One of the main aims of this thesis is to design an optimized commercial Photovoltaic (PV) system in Barbados from several variables such as racking type, module type and inverter type based on practicality, technical performance as well as financial returns to the client. Detailed simulations are done in PVSYST and financial models are used to compare different systems and their viability. Once the preeminent system is determined from a financial and performance perspective a detailed design is done using PVSYST and AutoCAD to design the most optimal PV system for the customer. In doing so, suitable engineering drawings are generated which are detailed enough for construction of the system. Detailed cost with quotes from relevant manufacturers, suppliers and estimators become instrumental in determining Balance of System Costs in addition to total project cost. The final simulated system is suggested with a PV capacity of 425kW and an inverter output of 300kW resulting in an array oversizing of 1.42. The PV system has a weighted Performance Ratio of 77 %, a specific yield of 1467 kWh/kWp and a projected annual production of 624 MWh/yr. This system is estimated to offset approximately 28 % of Carlton’s electrical load annually. Over the course of 20 years the PV system is projected to produce electricity at a cost of $0.201USD/kWh which is significantly lower than the $0.35 USD/kWh paid to the utility at the time of writing this thesis. Due to the high cost of electricity on the island, an attractive Feed-In-Tariff is not necessary to warrant the installation of a commercial System which over a lifetime which produces electricity at less than 60% of the cost to the user purchasing electricity from the utility. A simple payback period of 5.4 years, a return on investment of 17 % without incentives, in addition to an estimated diversion of 6840 barrels of oil or 2168 tonnes of CO2 further provides compelling justification for the installation of a commercial Photovoltaic System not only on Carlton A-1 Supermarket, but also island wide as well as regionally where most electricity supplies are from imported fossil fuels.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A tool for standardized calculation of solar collector performance has been developed in cooperation between SP Technical Research Institute of Sweden, DTU Denmark and SERC Dalarna University. The tool is designed to calculate the annual performance of solar collectors at representative locations in Europe. The collector parameters used as input in the tool are compiled from tests according to EN12975, without any intermediate conversions. The main target group for this tool is test institutes and certification bodies that are intended to use it for conversion of collector model parameters (derived from performance tests) into a more user friendly quantity: the annual energy output. The energy output presented in the tool is expressed as kWh per collector module. A simplified treatment of performance for PVT collectors is added based on the assumption that the thermal part of the PVT collector can be tested and modeled as a thermal collector, when the PV electric part is active with an MPP tracker in operation. The thermal collector parameters from this operation mode are used for the PVT calculations. © 2012 The Authors.