3 resultados para Software measurement

em Dalarna University College Electronic Archive


Relevância:

30.00% 30.00%

Publicador:

Resumo:

This Thesis project is a part of the all-round automation of production of concentrating solar PV/T systems Absolicon X10. ABSOLICON Solar Concentrator AB has been invented and started production of the prospective solar concentrated system Absolicon X10. The aims of this Thesis project are designing, assembling, calibrating and putting in operation the automatic measurement system intended to evaluate the shape of concentrating parabolic reflectors.On the basis of the requirements of the company administration and needs of real production process the operation conditions for the Laser testing rig were formulated. The basic concept to use laser radiation was defined.At the first step, the complex design of the whole system was made and division on the parts was defined. After the preliminary conducted simulations the function and operation conditions of the all parts were formulated.At the next steps, the detailed design of all the parts was conducted. Most components were ordered from respective companies. Some of the mechanical components were made in the workshop of the company. All parts of the Laser-testing rig were assembled and tested. Software part, which controls the Laser-testing rig work, was created on the LabVIEW basis. To tune and test software part the special simulator was designed and assembled.When all parts were assembled in the complete system, the Laser-testing rig was tested, calibrated and tuned.In the workshop of Absolicon AB, the trial measurements were conducted and Laser-testing rig was installed in the production line at the plant in Soleftea.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This Thesis project is a part of the research conducted in Solar industry. ABSOLICON Solar Concentrator AB has invented and started production of the prospective solar concentrated system Absolicon X10. The aims of this Thesis project are designing, assembling, calibrating and putting in operation the automatic measurement system intended to evaluate distribution of density of solar radiation in the focal line of the concentrated parabolic reflectors and to measure radiation from the artificial source of light being a calibration-testing tool.On the basis of the requirements of the company’s administration and needs of designing the concentrated reflectors the operation conditions for the Sun-Walker were formulated. As the first step, the complex design of the whole system was made and division on the parts was specified. After the preliminary conducted simulation of the functions and operation conditions of the all parts were formulated.As the next steps, the detailed design of all the parts was made. Most components were ordered from respective companies. Some of the mechanical components were made in the workshop of the company. All parts of the Sun-Walker were assembled and tested. The software part, which controls the Sun-Walker work and conducts measurements of solar irradiation, was created on the LabVIEW basis. To tune and test the software part, the special simulator was designed and assembled.When all parts were assembled in the complete system, the Sun-Walker was tested, calibrated and tuned.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Bergkvist insjön AB is a sawmill yard which is capable of producing 350,000 cubic meter of timber every year this requires lot of internal resources. Sawmill operations can be classified as unloading, sorting, storage and production of timber. In the company we have trucks arriving at random they have to be unloaded and sent back at the earliest to avoid queuing up of trucks creating a problem for truck owners. The sawmill yard has to operate with two log stackers that does several tasks including transporting the logs from trucks to measurement station where the logs will be sorted into classes and dropped into pockets from pockets to the sorted timber yard where they are stored and finally from there to sawmill for final processing. The main issue that needs to be answered here is the lining up trucks that are waiting to be unload, creating a problem for both sawmill as well as the truck owners and given huge production volume, it is certain that handling of resources is top priority. A key challenge in handling of resources would be unloading of trucks and finding a way to optimize internal resources.To address this problem i have experimented on different ways of using internal resources, i have designed different cases, in case 1 we have both the log stackers working on sawmill and measurement station. The main objective of having this case is to make sawmill and measurement station to work all the time. Then in case 2, i have divided the work between both the log stackers, one log stacker will be working on sawmill and pocket_control and second log stacker will be working on measurement station and truck. Then in case 3 we have only one log stacker working on all the agents, this case was designed to reduce cost of production, as the experiment cannot be done in real-time due to operational cost, for this purpose simulation is used, preliminary investigation into simulation results suggested that case 2 is the best option has it reduced waiting time of trucks considerably when compared with other cases and it showed 50% increase in optimizing internal resources.