4 resultados para Socio-technical styles of production
em Dalarna University College Electronic Archive
Resumo:
This thesis is done to solve two issues for Sayid Paper Mill Ltd Pakistan. Section one deals with a practical problem arise in SPM that is cutting a given set of raw paper rolls of known length and width, and a set of product paper rolls of known length (equal to the length of raw paper rolls) and width, practical cutting constraints on a single cutting machine, according to demand orders for all customers. To solve this problem requires to determine an optimal cutting schedule to maximize the overall cutting process profitability while satisfying all demands and cutting constraints. The aim of this part of thesis is to develop a mathematical model which solves this problem.Second section deals with a problem of delivering final product from warehouse to different destinations by finding shortest paths. It is an operational routing problem to decide the daily routes for sending trucks to different destination to deliver their final product. This industrial problem is difficult and includes aspect such as delivery to a single destination and multiple destinations with limited resources. The aim of this part of thesis is to develop a process which helps finding shortest path.
Resumo:
The main idea of this research to solve the problem of inventory management for the paper industry SPM PVT limited. The aim of this research was to find a methodology by which the inventory of raw material could be kept at minimum level by means of buffer stock level.The main objective then lies in finding the minimum level of buffer stock according to daily consumption of raw material, finding the Economic Order Quantity (EOQ) reorders point and how much order will be placed in a year to control the shortage of raw material.In this project, we discuss continuous review model (Deterministic EOQ models) that includes the probabilistic demand directly in the formulation. According to the formula, we see the reorder point and the order up to model. The problem was tackled mathematically as well as simulation modeling was used where mathematically tractable solution was not possible.The simulation modeling was done by Awesim software for developing the simulation network. This simulation network has the ability to predict the buffer stock level based on variable consumption of raw material and lead-time. The data collection for this simulation network is taken from the industrial engineering personnel and the departmental studies of the concerned factory. At the end, we find the optimum level of order quantity, reorder point and order days.
Resumo:
This report describes the outcome of the first visit to Tanzania, within the project "Mini-grids supplied by renewable energy - improving technical and social feasibility". The trip included visits to three different organizations; Ihushi Development Center (IDC) near Mwanza, TIDESO near Bukoba, and Mavuno Project in Karagwe. At IDC, a brief evaluation of the current power system was done and measuring equipment for long term measurements were installed. At all three locations investigations regarding the current and future electricity demand were conducted and connections to people relevant to the study were established. The report is including as well some technical specifications as some observations regarding organization and management of the technical systems. The trip was including only short visits and therefore only brief introductions to the different organizations, based on observations done by the author. The report is hence describing the author’s understanding of the technical system and social structures after only short visits to each of the organizations, and may differ from observations done at another point in time, over a different time period, or by some other person.This report describes the outcome of the first visit to Tanzania, within the project "Mini-grids supplied by renewable energy - improving technical and social feasibility". The trip included visits to three different organizations; Ihushi Development Center (IDC) near Mwanza, TIDESO near Bukoba, and Mavuno Project in Karagwe. At IDC, a brief evaluation of the current power system was done and measuring equipment for long term measurements were installed. At all three locations investigations regarding the current and future electricity demand were conducted and connections to people relevant to the study were established. The report is including as well some technical specifications as some observations regarding organization and management of the technical systems. The trip was including only short visits and therefore only brief introductions to the different organizations, based on observations done by the author. The report is hence describing the author’s understanding of the technical system and social structures after only short visits to each of the organizations, and may differ from observations done at another point in time, over a different time period, or by some other person.