3 resultados para Schleswig-Holstein, Germany

em Dalarna University College Electronic Archive


Relevância:

90.00% 90.00%

Publicador:

Resumo:

Development of an infrastructure for Brundtland Renewable Energy Network - BREN is a European Commission Alterner Project with Contract no XVII/4. 1030/Z96-032.The project has its origin in the UN-report “Our Common Future”, 1989. A change in and reduction of the use of energy was fundamental in order to reach the goals which the report proposed. Denmark decided on an action plan on how energy consumption could be reduced “Energi 2000 - Handlingsplan för en bäredygtig udvikling”. The ministries of energy in Denmark and Schleswig Holstein both agreed to start an energy saving project in a smaller town. The project was called “Brundtlandby” and the two first were Toftlund in South Jutland and Bredstedt in North Friesland. After a short period a further two German Cities, Rheinsberg and Viernheim, and Rajec in Slovakia joined the group. A network for the exchange of knowledge and experience between the cities was formed. The network, Brundtland City Project, inspired the participating cities in the continuing work with energy saving measures. The Brundtland City Project was presented at an international conference “Cities and Energy” in Trondheim, Norway,in December 1995. Great interest was shown in the project and it was decided that a network should be developed in northern European countries as a pilot project to be enlarged with other European countries later on. A steering committee was formed with representatives from the nordic countries.An application was sent to the European Commission, Alterner Program, and was approved in Juli 1996. The project was subdivided into nine activities. Activity 1, consisted of summarising the experiences of the Brundtland City Project in Toftlund, Denmark and the Brundtland Cities network in Slovakia, Germany and Denmark. The Scandinavian part started with Activity 2, to engage municipalities/cities in Finland, Norway and Sweden in the project. The Solar Energy Research Center, SERC, Högskolan Dalarna was appointed as co-ordinator for the Swedish part. The project was presented at a seminar on the 30th September for representatives from the municipalities of Borlänge and Falun. On the 10th of December 1996 the two municipalities accepted the invitation to join the Northern network. Pelle Helje, Borlänge Energi, has been informant for the municipality of Borlänge and Anders Goop, Department of Urban Planninginformant for the municipality of Falun with Jan Kaans, Estates department providing information to the basis for the Newsletter.Reports on the work in Borlänge and Falun municipalities have been made to Brundtland Center Denmark on three occasions; Activities 2-5, 16-12-1997, Activities 6-7, including parts of activities 8-9, 03-03-1998, and the basis for the Newsletter, 01-07-1998. The Nordic reports have been compiled at the Brundtland Center Denmark for submission to the European Commission. English has been the common language. After the report of activities 2 - 5 the participants wereinvited to a project meeting and a workshop at Brundtland Center the 23rd and 24th March 1998.This was the first occasion the participants in the project met and the network thus took a moreconcrete form. It also was decided that the next meeting should be in Borlänge in August 1998,with Borlänge Energi and Solar Energy Research Center SERC as organisers. As BrundtlandCentre Denmark was wound up for financial reasons, the project meeting in Borlänge wascancelled.Compilation of the Final Report was carried out by Esbensen Consultants in October 1998Future development of the networkIt is intended to continue the work with the Brundtland City Network as an “EU Thermie Bproject”and the network will be enlarged with the addition of four new Brundtland Cities from Austria, Germany, Italy and Great Britain. In addition the village of Putja in Estonia will join the network but this will be financed by the EU-Phare programme.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Within the framework of the REBUS project the German building industry has been investigated regarding their energy concepts. The intention was to evaluatethe establishment of renewable energy sources on the German market for new built houses and prefab houses in particular. For this purpose the products of 85manufacturers of prefab houses have been analyzed. Of special interest was the applicationof heating and hot water systems driven by solar energy and biomass. The results show that both techniques are well accepted and established. Almost 90% of themanufacturers offer solar systems on request and almost 70% heating systems based on Pellets. 24% offered solar and 7% as standard options in their range. From theachieved figures the potential of the Swedish market can be worked out. Strategies to introduce renewable energy to a greater extent to Swedish house manufacturers and builders might also be found.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Participation as observer at the meeting of Task 14 of IEA's Solar Heating and Cooling Projects held in Hameln, Germany has led to greater understanding of interesting developments underway in several countries. This will be of use during the development of small scale systems suitable for Swedish conditions. A summary of the work carried out by the working groups within Task 14 is given, with emphasis on the Domestic Hot Water group. Experiences of low-flow systems from several countries are related, and the conclusion is drawn that the maximum theoretical possible increase in performance of 20% has not been achieved due to poor heat exchangers and poor stratification in the storage tanks. Positive developments in connecting tubes and pumps is noted. Further participation as observer in Task 14 meetings is desired, and is looked on favourably by the members of the group. Another conclusion is that SERC should carry on with work on Swedish storage tanks, with emphasis on better stratification and heat exchangers, and possible modelling of system components. Finally a German Do-it-Vourself kit is described and judged in comparison with prefabricated models and Swedish Do-it-Yourself kits.