5 resultados para Project portfolio management (ppm)
em Dalarna University College Electronic Archive
Resumo:
In an office building in the US the office equipment uses about 7% of the total electricity use. Eventhough this is a low number, there is still a reason to save more energy, especially since one third of theenergy savings are lost when power management is not enabled.The core in the project ”Power Management Controls” is to develop a voluntary standard, The UserInterface Standard, that manufacturers of office equipment can use as a reference when they developnew equipment and design new interfaces. The interface is an important part of the use of powermanagement and doing this should increase the use of power management and save more energy. Theinterfaces are ofter hidden or inconsistent and confusing, which makes it harder for the user tounderstand power management. A more consistent interface makes it easier for the user to understandthe meaning of an interface and power management itselfThe standard consists of six different parts, which describe what can be done to achieve a consistentinterface. The standard also describes the part of the project called Dynamic Behavior. This part isconcentrating on the interfaces and the behavior of the device over time, which is important for the userto understand.The purpose of this degree project is to study and participate in the project ”Power ManagementControls”, and to understand what is being done to save more energy.
Resumo:
The work concerns development of a prototype molecular tests to identify vitality status of conifer seedlings. The work is done by NSure, Holland, Dalarna University and SUAS. In case for spruce, a successful validation experiment has been performed to validate the identified frost tolerance and vitality genes. Multiple indicators were identified that can be used to either reinforce the existing ColdnSure test, but also for development of a vitality test. The identified frost tolerance and vitality genes for pine still need to be validated. NSure together with Dalarna University aim to perform a validation next season. Multiple LN indicators were identified in spruce that can be used to determine the effectiveness of a LN treatment, but they are not yet validated. In spruce and pine hardly any scientific research is performed to study the effect of a LN treatment, particularly not at molecular level. Therefore NSure together with Dalarna Research Station want to apply for a project. Within this project, we would be able to develop the tests further.
Resumo:
This Degree Project is a cooperativ work with the advertising agency PAX in Falun and the industrial companyRemote Control, who constructs and sells actuators for the global market.The assignment concerns bringing out a graphic profile, or with another expression a Design Management, forRemote Control AB graphic materials. Remote Control AB has a quality certification ISO 9000 and is workingwith, when this report was wrote, an environment certification ISO 14001.The Company has been paid attention to Internet and other media.The supervisors are familiar to that Design Management is a soon coming competition element, like quality andenvironment management.This Degree project contains research, analysis and the construction of graphic material. The research has beencommitted most of the time to trace the customer, the market and the competitor, because its the most importantphase. It’s also important looking at competitor’s way of working with marketing management, so you can separatethem from the own company.
Resumo:
This report describes the outcome of the first visit to Tanzania, within the project "Mini-grids supplied by renewable energy - improving technical and social feasibility". The trip included visits to three different organizations; Ihushi Development Center (IDC) near Mwanza, TIDESO near Bukoba, and Mavuno Project in Karagwe. At IDC, a brief evaluation of the current power system was done and measuring equipment for long term measurements were installed. At all three locations investigations regarding the current and future electricity demand were conducted and connections to people relevant to the study were established. The report is including as well some technical specifications as some observations regarding organization and management of the technical systems. The trip was including only short visits and therefore only brief introductions to the different organizations, based on observations done by the author. The report is hence describing the author’s understanding of the technical system and social structures after only short visits to each of the organizations, and may differ from observations done at another point in time, over a different time period, or by some other person.This report describes the outcome of the first visit to Tanzania, within the project "Mini-grids supplied by renewable energy - improving technical and social feasibility". The trip included visits to three different organizations; Ihushi Development Center (IDC) near Mwanza, TIDESO near Bukoba, and Mavuno Project in Karagwe. At IDC, a brief evaluation of the current power system was done and measuring equipment for long term measurements were installed. At all three locations investigations regarding the current and future electricity demand were conducted and connections to people relevant to the study were established. The report is including as well some technical specifications as some observations regarding organization and management of the technical systems. The trip was including only short visits and therefore only brief introductions to the different organizations, based on observations done by the author. The report is hence describing the author’s understanding of the technical system and social structures after only short visits to each of the organizations, and may differ from observations done at another point in time, over a different time period, or by some other person.
Resumo:
Small-scale enterprises face difficulties in fulfilling the regulations for organising Systematic Work Environment Management. This study compared three groups of small-scale manufacturing enterprises with and without support for implementing the provision. Two implementation methods, supervised and network method, were used. The third group worked according to their own ideas. Twenty-three enterprises participated. The effects of the implementation were evaluated after one year by semi-structured dialogue with the manager and safety representative. Each enterprise was classified on compliance with ten demands concerning the provision. The work environment was estimated by the WEST-method. Impact of the implementation on daily work was also studied. At the follow-up, the enterprises in the supervised method reported slightly more improvements in the fulfilment of the demands in the provision than the enterprises in the network method and the enterprises working on their own did. The effect of the project reached the employees faster in the enterprises with the supervised method. In general, the work environment improved to some extent in all enterprises. Extensive support to small-scale enterprises in terms of advise and networking aimed to fulfil the regulations of Systematic Work Environment Management had limited effect especially considering the cost of applying these methods.