The capacitor test process at ABB Capacitors in Ludvika must be improved to meet future demands for high voltage products. To find a solution to how to improve the test process, an investigation was performed to establish which parts of the process are used and how they operate. Several parts which can improves the process were identified. One of them was selected to be improved in correlation with the subject, mechanical engineering. Four concepts were generated and decision matrixes were used to systematically select the best concept. By improving the process several benefits has been added to the process. More units are able to be tested and lead time is reduced. As the lead time is reduced the cost for each unit is reduced, workers will work less hours for the same amount of tested units, future work to further improve the process is also identified. The selected concept was concept 1, the sway stop concept. This concept is used to reduce the sway of the capacitors as they have entered the test facility, the box. By improving this part of the test process a time saving of 20 seconds per unit can be achieved, equivalent to 7% time reduction. This can be compared to an additional 1400 units each year.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The diffusion of Concentrating Solar Power Systems (CSP) systems is currently taking place at a much slower pace than photovoltaic (PV) power systems. This is mainly because of the higher present cost of the solar thermal power plants, but also for the time that is needed in order to build them. Though economic attractiveness of different Concentrating technologies varies, still PV power dominates the market. The price of CSP is expected to drop significantly in the near future and wide spread installation of them will follow. The main aim of this project is the creation of different relevant case studies on solar thermal power generation and a comparison betwwen them. The purpose of this detailed comparison is the techno-economic appraisal of a number of CSP systems and the understanding of their behaviour under various boundary conditions. The CSP technologies which will be examined are the Parabolic Trough, the Molten Salt Power Tower, the Linear Fresnel Mirrors and the Dish Stirling. These systems will be appropriatly sized and simulated. All of the simulations aim in the optimization of the particular system. This includes two main issues. The first is the achievement of the lowest possible levelized cost of electricity and the second is the maximization of the annual energy output (kWh). The project also aims in the specification of these factors which affect more the results and more specifically, in what they contribute to the cost reduction or the power generation. Also, photovoltaic systems will be simulated under same boundary conditions to facolitate a comparison between the PV and the CSP systems. Last but not leats, there will be a determination of the system which performs better in each case study.