5 resultados para Pipelines--Maintenance and repair
em Dalarna University College Electronic Archive
Resumo:
The occurrence of pauses and hesitations in spontaneous speech has been shown to occur systematically, for example, "between sentences, after discourse markers and conjunctions and before accented content words." (Hansson [15]) This is certainly plausible in English, where pauses and hesitations can and often do occur before content words such as nominals, for example, "uh, there's a … man." (Chafe [8]) However, if hesitations are, in fact, evidence of "deciding what to talk about next," (Chafe [8]) then the complex grammatical system of German should render this pausing position precarious, since pre-modifiers must account for the gender of the nominals they modify.In this paper, I present data to test the hypothesis that pre-nominal hesitation patterns in German are dissimilar to those in English. Hesitations in German will be shown, in fact, to occur within noun phrase units. Nevertheless, native speakers most often succeed in supplying a nominal which conforms to the gender indicated by the determiner or pre-modifier. Corrections, or repairs, of infelicitous pre-modifiers indicate that the speaker was unable to supply a nominal of the same gender which the choice of pre-modifier had committed him/her to. The frequency of such repairs is shown to vary according to task, with fewest repairs occurring in elicited speech which allows for linguistic freedom and therefore is most like spontaneous speech. The data sets indicate that among German native speakers, hesitations occurring before noun phrase units (pre-NPU hesitations) indicate deliberation of what to say, while hesitations within or before the head of the noun phrase (pre-NPH hesitations) indicate deliberation of how to say what has already been decided (cf. Chafe [8]).
Resumo:
The cost of a road construction over its service life is a function of the design, quality of construction, maintenance strategies and maintenance operations. Unfortunately, designers often neglect a very important aspect which is the possibility to perform future maintenance activities. The focus is mainly on other aspects such as investment costs, traffic safety, aesthetic appearance, regional development and environmental effects. This licentiate thesis is a part of a Ph.D. project entitled “Road Design for lower maintenance costs” that aims to examine how the life-cycle costs can be optimized by selection of appropriate geometrical designs for the roads and their components. The result is expected to give a basis for a new method used in the road planning and design process using life-cycle cost analysis with particular emphasis on road maintenance. The project started with a review of literature with the intention to study conditions causing increased needs for road maintenance, the efforts made by the road authorities to satisfy those needs and the improvement potential by consideration of maintenance aspects during planning and design. An investigation was carried out to identify the problems which obstruct due consideration of maintenance aspects during the road planning and design process. This investigation focused mainly on the road planning and design process at the Swedish Road Administration. However, the road planning and design process in Denmark, Finland and Norway were also roughly evaluated to gain a broader knowledge about the research subject. The investigation was carried out in two phases: data collection and data analysis. Data was collected by semi-structured interviews with expert actors involved in planning, design and maintenance and by a review of design-related documents. Data analyses were carried out using a method called “Change Analysis”. This investigation revealed a complex combination of problems which result in inadequate consideration of maintenance aspects. Several urgent needs for changes to eliminate these problems were identified. Another study was carried out to develop a model for calculation of the repair costs for damages of different road barrier types and to analyse how factors such as road type, speed limits, barrier types, barrier placement, type of road section, alignment and seasonal effects affect the barrier damages and the associated repair costs. This study was carried out using a method called the “Case Study Research Method”. Data was collected from 1087 barrier repairs in two regional offices of the Swedish Road Administration, the Central Region and the Western Region. A table was established for both regions containing the repair cost per vehicle kilometre for different combinations of barrier types, road types and speed limits. This table can be used by the designers in the calculation of the life-cycle costs for different road barrier types.
Resumo:
The cost of a road construction over its service life is a function of design, quality of construction as well as maintenance strategies and operations. An optimal life-cycle cost for a road requires evaluations of the above mentioned components. Unfortunately, road designers often neglect a very important aspect, namely, the possibility to perform future maintenance activities. Focus is mainly directed towards other aspects such as investment costs, traffic safety, aesthetic appearance, regional development and environmental effects. This doctoral thesis presents the results of a research project aimed to increase consideration of road maintenance aspects in the planning and design process. The following subgoals were established: Identify the obstacles that prevent adequate consideration of future maintenance during the road planning and design process; and Examine optimisation of life-cycle costs as an approach towards increased efficiency during the road planning and design process. The research project started with a literature review aimed at evaluating the extent to which maintenance aspects are considered during road planning and design as an improvement potential for maintenance efficiency. Efforts made by road authorities to increase efficiency, especially maintenance efficiency, were evaluated. The results indicated that all the evaluated efforts had one thing in common, namely ignorance of the interrelationship between geometrical road design and maintenance as an effective tool to increase maintenance efficiency. Focus has mainly been on improving operating practises and maintenance procedures. This fact might also explain why some efforts to increase maintenance efficiency have been less successful. An investigation was conducted to identify the problems and difficulties, which obstruct due consideration of maintainability during the road planning and design process. A method called “Change Analysis” was used to analyse data collected during interviews with experts in road design and maintenance. The study indicated a complex combination of problems which result in inadequate consideration of maintenance aspects when planning and designing roads. The identified problems were classified into six categories: insufficient consulting, insufficient knowledge, regulations and specifications without consideration of maintenance aspects, insufficient planning and design activities, inadequate organisation and demands from other authorities. Several urgent needs for changes to eliminate these problems were identified. One of the problems identified in the above mentioned study as an obstacle for due consideration of maintenance aspects during road design was the absence of a model for calculating life-cycle costs for roads. Because of this lack of knowledge, the research project focused on implementing a new approach for calculating and analysing life-cycle costs for roads with emphasis on the relationship between road design and road maintainability. Road barriers were chosen as an example. The ambition is to develop this approach to cover other road components at a later stage. A study was conducted to quantify repair rates for barriers and associated repair costs as one of the major maintenance costs for road barriers. A method called “Case Study Research Method” was used to analyse the effect of several factors on barrier repairs costs, such as barrier type, road type, posted speed and seasonal effect. The analyses were based on documented data associated with 1625 repairs conducted in four different geographical regions in Sweden during 2006. A model for calculation of average repair costs per vehicle kilometres was created. Significant differences in the barrier repair costs were found between the studied barrier types. In another study, the injuries associated with road barrier collisions and the corresponding influencing factors were analysed. The analyses in this study were based on documented data from actual barrier collisions between 2005 and 2008 in Sweden. The result was used to calculate the cost for injuries associated with barrier collisions as a part of the socio-economic cost for road barriers. The results showed significant differences in the number of injuries associated with collisions with different barrier types. To calculate and analyse life-cycle costs for road barriers a new approach was developed based on a method called “Activity-based Life-cycle Costing”. By modelling uncertainties, the presented approach gives a possibility to identify and analyse factors crucial for optimising life-cycle costs. The study showed a great potential to increase road maintenance efficiency through road design. It also showed that road components with low investment costs might not be the best choice when including maintenance and socio-economic aspects. The difficulties and problems faced during the collection of data for calculating life-cycle costs for road barriers indicated a great need for improving current data collecting and archiving procedures. The research focused on Swedish road planning and design. However, the conclusions can be applied to other Nordic countries, where weather conditions and road design practices are similar. The general methodological approaches used in this research project may be applied also to other studies.
Resumo:
BACKGROUND: Reminder systems in electronic patient records (EPR) have proven to affect both health care professionals' behaviour and patient outcomes. The aim of this cluster randomised trial was to investigate the effects of implementing a clinical practice guideline (CPG) for peripheral venous catheters (PVCs) in paediatric care in the format of reminders integrated in the EPRs, on PVC-related complications, and on registered nurses' (RNs') self-reported adherence to the guideline. An additional aim was to study the relationship between contextual factors and the outcomes of the intervention. METHODS: The study involved 12 inpatient units at a paediatric university hospital. The reminders included choice of PVC, hygiene, maintenance, and daily inspection of PVC site. Primary outcome was documented signs and symptoms of PVC-related complications at removal, retrieved from the EPR. Secondary outcome was RNs' adherence to a PVC guideline, collected through a questionnaire that also included RNs' perceived work context, as measured by the Alberta Context Tool. Units were allocated into two strata, based on occurrence of PVCs. A blinded simple draw of lots from each stratum randomised six units to the control and intervention groups, respectively. Units were not blinded. The intervention group included 626 PVCs at baseline and 618 post-intervention and the control group 724 PVCs at baseline and 674 post-intervention. RNs included at baseline were 212 (65.4 %) and 208 (71.5 %) post-intervention. RESULTS: No significant effect was found for the computer reminders on PVC-related complications nor on RNs' adherence to the guideline recommendations. The complication rate at baseline and post-intervention was 40.6 % (95 % confidence interval (CI) 36.7-44.5) and 41.9 % (95 % CI 38.0-45.8), for the intervention group and 40.3 % (95 % CI 36.8-44.0) and 46.9 % (95 % CI 43.1-50.7) for the control. In general, RNs' self-rated work context varied from moderately low to moderately high, indicating that conditions for a successful implementation to occur were less optimal. CONCLUSIONS: The reminders might have benefitted from being accompanied by a tailored intervention that targeted specific barriers, such as the low frequency of recorded reasons for removal, the low adherence to daily inspection of PVC sites, and the lack of regular feedback to the RNs. TRIAL REGISTRATION: Current Controlled Trials ISRCTN44819426.
Resumo:
Maintenance of transport infrastructure assets is widely advocated as the key in minimizing current and future costs of the transportation network. While effective maintenance decisions are often a result of engineering skills and practical knowledge, efficient decisions must also account for the net result over an asset's life-cycle. One essential aspect in the long term perspective of transport infrastructure maintenance is to proactively estimate maintenance needs. In dealing with immediate maintenance actions, support tools that can prioritize potential maintenance candidates are important to obtain an efficient maintenance strategy. This dissertation consists of five individual research papers presenting a microdata analysis approach to transport infrastructure maintenance. Microdata analysis is a multidisciplinary field in which large quantities of data is collected, analyzed, and interpreted to improve decision-making. Increased access to transport infrastructure data enables a deeper understanding of causal effects and a possibility to make predictions of future outcomes. The microdata analysis approach covers the complete process from data collection to actual decisions and is therefore well suited for the task of improving efficiency in transport infrastructure maintenance. Statistical modeling was the selected analysis method in this dissertation and provided solutions to the different problems presented in each of the five papers. In Paper I, a time-to-event model was used to estimate remaining road pavement lifetimes in Sweden. In Paper II, an extension of the model in Paper I assessed the impact of latent variables on road lifetimes; displaying the sections in a road network that are weaker due to e.g. subsoil conditions or undetected heavy traffic. The study in Paper III incorporated a probabilistic parametric distribution as a representation of road lifetimes into an equation for the marginal cost of road wear. Differentiated road wear marginal costs for heavy and light vehicles are an important information basis for decisions regarding vehicle miles traveled (VMT) taxation policies. In Paper IV, a distribution based clustering method was used to distinguish between road segments that are deteriorating and road segments that have a stationary road condition. Within railway networks, temporary speed restrictions are often imposed because of maintenance and must be addressed in order to keep punctuality. The study in Paper V evaluated the empirical effect on running time of speed restrictions on a Norwegian railway line using a generalized linear mixed model.