3 resultados para Lead mines and mining

em Dalarna University College Electronic Archive


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Modular product architectures have generated numerous benefits for companies in terms of cost, lead-time and quality. The defined interfaces and the module’s properties decrease the effort to develop new product variants, and provide an opportunity to perform parallel tasks in design, manufacturing and assembly. The background of this thesis is that companies perform verifications (tests, inspections and controls) of products late, when most of the parts have been assembled. This extends the lead-time to delivery and ruins benefits from a modular product architecture; specifically when the verifications are extensive and the frequency of detected defects is high. Due to the number of product variants obtained from the modular product architecture, verifications must handle a wide range of equipment, instructions and goal values to ensure that high quality products can be delivered. As a result, the total benefits from a modular product architecture are difficult to achieve. This thesis describes a method for planning and performing verifications within a modular product architecture. The method supports companies by utilizing the defined modules for verifications already at module level, so called MPV (Module Property Verification). With MPV, defects are detected at an earlier point, compared to verification of a complete product, and the number of verifications is decreased. The MPV method is built up of three phases. In Phase A, candidate modules are evaluated on the basis of costs and lead-time of the verifications and the repair of defects. An MPV-index is obtained which quantifies the module and indicates if the module should be verified at product level or by MPV. In Phase B, the interface interaction between the modules is evaluated, as well as the distribution of properties among the modules. The purpose is to evaluate the extent to which supplementary verifications at product level is needed. Phase C supports a selection of the final verification strategy. The cost and lead-time for the supplementary verifications are considered together with the results from Phase A and B. The MPV method is based on a set of qualitative and quantitative measures and tools which provide an overview and support the achievement of cost and time efficient company specific verifications. A practical application in industry shows how the MPV method can be used, and the subsequent benefits

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Industrial heritage tourism has been in focus for many academic studies and tourism is an alternative developmental tool for mines and contributes to their economic success. This thesis is about the Falu Mine in Dalarna, Sweden, which has World Heritage status since 2001 and is one of the biggest attractions in the region. Its history and cultural importance are reasons for the importance of preserving the heritage. The Falu Mine is under the management of the Great Copper Mountain Trust and one of their ambitions is to ensure the continuous popularity among domestic and international visitors. In order to gain a better understanding of the visitors and to find strategies to improve performance, a visitor survey has been conducted in the summer of 2011. It is the authors believe that the guides of the Falu Mine have the best available insight and that their perceptions help to add to the understanding about the visitors. Therefore, this thesis aims to explore the perceptions of the guides about their visitors, to investigate how the perceptions correspond to the statistical results and to study if there are any differences between domestic and international visitors. The mixed methods approach will increase the depth and accuracy of the results, by linking qualitative with quantitative data. The results show that differences between domestic and international visitors exist, both proven by interviews with the guides and the visitor survey. These differences occur in the factors, such as level of education of the visitors, group size and number of children in the group, knowledge of the visitors prior to and after the visit, sources of information and the fulfillment of the visitor expectations. The perceptions emphasize how these differences impact the guided tours. The guides of the Falu Mine have to be aware of those differences in order to adjust the tour accordingly, as well as the management of the Falu Mine can use this knowledge in order to identify strategies for improving performance.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Setup time reduction facilitate the flexibility needed for just-in-time production. An integrated steel mill with meltshop, continuous caster and hot rolling mill is often operated as decoupled processes. Setup time reduction provides the flexibility needed to reduce buffering, shorten lead times and create an integrated process flow. The interdependency of setup times, process flexibility and integration were analysed through system dynamics simulation. The results showed significant reductions of energy consumption and tied capital. It was concluded that setup time reduction in the hot strip mill can aid process integration and hence improve production economy while reducing environmental impact.