10 resultados para Integrated modular avionics

em Dalarna University College Electronic Archive


Relevância:

40.00% 40.00%

Publicador:

Resumo:

It is known that despite companies’ efforts to improve the quality of their products, design and assembly defects results in large repair costs both in terms of repair and providing feedback to the origin of the defect. The purpose of this paper is to study these types of defects and the defect rates in design and assembly. The paper presents a web based questionnaire answered by 29 companies. The result shows that the defect rate (defects per product) spanned from 0.01 to 10. Also, design and assembly defects covered 46%, 23% respectively, of all occurred defects. A case study is also presented, performed at a company who recently implemented a modular architecture. In this company, defects from 5 700 integrated product architectures are compared with defects from 431 modular architectures. The average defect rate increased by 21.5% – from 0.65 to 0.79 – when a more modular architecture has been implemented. Furthermore, the study showed that the assembly defects have decreased while the design defects increased. The results presented in this paper will also support the development of the MPV (Module Property Verification) method which is briefly described.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Companies are focusing on efforts increasing the overall efficiency at the same time as the ability to meet customer needs becomes even more important. There is a need to improve the organisation and the product design at the same time through the visualisation of how a product family design should be performed in order to adapt to customers, company internal issues, and long-term strategy. Therefore, there is a need for qualified personnel in today’s companies with the knowledge of product development and modularity. The graduate course Development of Modular Products at Högskolan Dalarna has the objective to provide such knowledge. As a part of the course, each student will individually perform extensive research within a chosen area with respect to Product Development and Modularity. This proceeding is the result of the students own work and was presented during a two day seminar at Dalarna University. The contents of the papers cover many areas, from the identification of customer needs to cost effective manufacturing, and benefits of modularisation. The reader of this proceeding will not only benefit from many areas within Product Development and Modularity but also from the colour of many cultures. In this proceeding, students from nine countries are represented (Bangladesh, China, Costa Rica, Germany, Holland, India, Luxembourg Nigeria, and Sweden). Enjoy the reading.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Modular product architectures have generated numerous benefits for companies in terms of cost, lead-time and quality. The defined interfaces and the module’s properties decrease the effort to develop new product variants, and provide an opportunity to perform parallel tasks in design, manufacturing and assembly. The background of this thesis is that companies perform verifications (tests, inspections and controls) of products late, when most of the parts have been assembled. This extends the lead-time to delivery and ruins benefits from a modular product architecture; specifically when the verifications are extensive and the frequency of detected defects is high. Due to the number of product variants obtained from the modular product architecture, verifications must handle a wide range of equipment, instructions and goal values to ensure that high quality products can be delivered. As a result, the total benefits from a modular product architecture are difficult to achieve. This thesis describes a method for planning and performing verifications within a modular product architecture. The method supports companies by utilizing the defined modules for verifications already at module level, so called MPV (Module Property Verification). With MPV, defects are detected at an earlier point, compared to verification of a complete product, and the number of verifications is decreased. The MPV method is built up of three phases. In Phase A, candidate modules are evaluated on the basis of costs and lead-time of the verifications and the repair of defects. An MPV-index is obtained which quantifies the module and indicates if the module should be verified at product level or by MPV. In Phase B, the interface interaction between the modules is evaluated, as well as the distribution of properties among the modules. The purpose is to evaluate the extent to which supplementary verifications at product level is needed. Phase C supports a selection of the final verification strategy. The cost and lead-time for the supplementary verifications are considered together with the results from Phase A and B. The MPV method is based on a set of qualitative and quantitative measures and tools which provide an overview and support the achievement of cost and time efficient company specific verifications. A practical application in industry shows how the MPV method can be used, and the subsequent benefits

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The desire to conquer markets through advanced product design and trendy business strategies are still predominant approaches in industry today. In fact, product development has acquired an ever more central role in the strategic planning of companies, and it has extended its influence to R&D funding levels as well. It is not surprising that many national R&D project frameworks within the EU today are dominated by product development topics, leaving production engineering, robotics, and systems on the sidelines. The reasons may be many but, unfortunately, the link between product development and the production processes they cater for are seldom treated in depth. The issue dealt with in this article relates to how product development is applied in order to attain the required production quality levels a company may desire, as well as how one may counter assembly defects and deviations through quantifiable design approaches. It is recognized that product verifications (tests, inspections, etc.) are necessary, but the application of these tactics often result in lead-time extensions and increased costs. Modular architectures improve this by simplifying the verification of the assembled product at module level. Furthermore, since Design for Assembly (DFA) has shown the possibility to identify defective assemblies, it may be possible to detect potential assembly defects already in the product and module design phase. The intention of this paper is to discuss and describe the link between verifications of modular architectures, defects and design for assembly. The paper is based on literature and case studies; tables and diagrams are included with the intention of increasing understanding of the relation between poor designs, defects and product verifications.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper presents the result from a case study at Scania on product development processes. The objective with the case study was to gather information on Scania’s product development process (PDP) including the use of CAD and simulation tools, and project work. The objective was also to find any deviations or different interpretations among the employees on the PDP. To gather the information, semi-structured tape-recorded interviews have been used to ensure that individual interpretations from the interviewees could be gathered. Scania uses a defined and structured PDP which facilitates concurrent and cross-functional work. The PDP is implemented and followed to various degrees. The newly employed personnel may have difficulties with communication, both to find and to give information. Although, newly graduated personnel may find it easier to adapt to changes, and also to use a structured process which they have studied at universities. It was also known during the case study that the PDP is a major support for the newly employed personnel, which in turn decreases the time to get into the same working process as the more experienced personnel. Employees with decades of experience know the right sources from which to both give and gather information. Also, the terminology and definitions in the product development process may not be used as intended. This makes it difficult for other project members or teams who need to interpret the information received. At the same time, the routines among the more experienced personnel, which have been set-up throughout the years, make them more inflexible in adapting changes. The findings in the case study as well as challenges with implementing the PDP are known to Scania and are a part of the continuing work with improvement.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Högskolepedagogik, högskolepedagogisk utbildning, BHU

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Producing cost-competitive small and medium-sized solar cooling systems is currently a significant challenge. Due to system complexity, extensive engineering, design and equipment costs; the installation costs of solar thermal cooling systems are prohibitively high. In efforts to overcome these limitations, a novel sorption heat pump module has been developed and directly integrated into a solar thermal collector. The module comprises a fully encapsulated sorption tube containing hygroscopic salt sorbent and water as a refrigerant, sealed under vacuum with no moving parts. A 5.6m2 aperture area outdoor laboratory-scale system of sorption module integrated solar collectors was installed in Stockholm, Sweden and evaluated under constant re-cooling and chilled fluid return temperatures in order to assess collector performance. Measured average solar cooling COP was 0.19 with average cooling powers between 120 and 200 Wm-2 collector aperture area. It was observed that average collector cooling power is constant at daily insolation levels above 3.6 kWhm-2 with the cooling energy produced being proportional to solar insolation. For full evaluation of an integrated sorption collector solar heating and cooling system, under the umbrella of a European Union project for technological innovation, a 180 m2 large-scale demonstration system has been installed in Karlstad, Sweden. Results from the installation commissioned in summer 2014 with non-optimised control strategies showed average electrical COP of 10.6 and average cooling powers between 140 and 250 Wm-2 collector aperture area. Optimisation of control strategies, heat transfer fluid flows through the collectors and electrical COP will be carried out in autumn 2014.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Increasing energy use has caused many environmental problems including global warming. Energy use is growing rapidly in developing countries and surprisingly a remarkable portion of it is associated with consumed energy to keep the temperature comfortable inside the buildings. Therefore, identifying renewable technologies for cooling and heating is essential. This study introduced applications of steel sheets integrated into the buildings to save energy based on existing technologies. In addition, the proposed application was found to have a considerable chance of market success. Also, satisfying energy needs for space heating and cooling in a single room by using one of the selected applications in different Köppen climate classes was investigated to estimate which climates have a proper potential for benefiting from the application. This study included three independent parts and the results related to each part have been used in the next part. The first part recognizes six different technologies through literature review including Cool Roof, Solar Chimney, Steel Cladding of Building, Night Radiative Cooling, Elastomer Metal Absorber, and Solar Distillation. The second part evaluated the application of different technologies by gathering the experts’ ideas via performing a Delphi method. The results showed that the Solar Chimney has a proper chance for the market. The third part simulated both a solar chimney and a solar chimney with evaporation which were connected to a single well insulated room with a considerable thermal mass. The combination was simulated as a system to estimate the possibility of satisfying cooling needs and heating needs in different climate classes. A Trombe-wall was selected as a sample design for the Solar Chimney and was simulated in different climates. The results implied that the solar chimney had the capability of reducing the cooling needs more than 25% in all of the studied locations and 100% in some locations with dry or temperate climate such as Mashhad, Madrid, and Istanbul. It was also observed that the heating needs were satisfied more than 50% in all of the studied locations, even for the continental climate such as Stockholm and 100% in most locations with a dry climate. Therefore, the Solar Chimney reduces energy use, saves environment resources, and it is a cost effective application. Furthermore, it saves the equipment costs in many locations. All the results mentioned above make the solar chimney a very practical and attractive tool for a wide range of climates.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A new managerial task arises in today’s working life: to provide conditions for and influence interaction between actors and thus to enable the emergence of organizing structure in tune with a changing environment. We call this the enabling managerial task. The goal of this paper is to study whether training first line managers in the enabling managerial task could lead to changes in the work for the subordinates. This paper presents results from questionnaires answered by the subordinates of the managers before and after the training. The training was organized as a learning network and consisted of eight workshops carried out over a period of one year (September 2009–June 2010), where the managers met with each other and the researchers once a month. Each workshop consisted of three parts, during three and a half hours. The first hour was devoted to joint reflection on a task that had been undertaken since the last workshop; some results were presented from the employee pre-assessments, followed by relevant theory and illuminating practices, finally the managers created new tasks for themselves to undertake during the following month. The subordinates’ answers show positive change in all of the seventeen scales used to assess it. The improvements are significant in scales measuring the relationship between the manager and the employees, as well as in those measuring interaction between employees. It is concluded that the result was a success for all managers that had the possibility of using the training in their management work.