5 resultados para Exception Handling. Exceptional Behavior. Exception Policy. Software Testing. Design Rules

em Dalarna University College Electronic Archive


Relevância:

100.00% 100.00%

Publicador:

Resumo:

OBJECTIVE: to explore perspectives and experiences of antenatal care and partner involvement among women who nearly died during pregnancy ('near-miss'). DESIGN: a study guided by naturalistic inquiry was conducted, and included extended in-community participant observation, semi-structured interviews, and focus group discussions. Qualitative data were collected between March 2013 and April 2014 in Kigali, Rwanda. FINDINGS: all informants were aware of the recommendations of male involvement for HIV-testing at the first antenatal care visit. However, this recommendation was seen as a clear link in the chain of delays and led to severe consequences, especially for women without engaged partners. The overall quality of antenatal services was experienced as suboptimal, potentially missing the opportunity to provide preventive measures and essential health education intended for both parents. This seemed to contribute to women's disincentive to complete all four recommended visits and men's interest in attending to ensure their partners' reception of care. However, the participants experienced a restriction of men's access during subsequent antenatal visits, which made men feel denied to their increased involvement during pregnancy. CONCLUSIONS: 'near-miss' women and their partners face paradoxical barriers to actualise the recommended antenatal care visits. The well-intended initiative of male partner involvement counterproductively causes delays or excludes women whereas supportive men are turned away from further health consultations. Currently, the suboptimal quality of antenatal care misses the opportunity to provide health education for the expectant couple or to identify and address early signs of complications IMPLICATIONS FOR PRACTICE: these findings suggest a need for increased flexibility in the antenatal care recommendations to encourage women to attend care with or without their partner, and to create open health communication about women's and men's real needs within the context of their social situations. Supportive partners should not be denied involvement at any stage of pregnancy, but should be received only upon consent of the expectant mother.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Test av mjukvara görs i syfte att se ifall systemet uppfyller specificerade krav samt för att hitta fel. Det är en viktig del i systemutveckling och involverar bland annat regressionstestning. Regressionstester utförs för att säkerställa att en ändring i systemet inte medför att andra delar i systemet påverkas negativt. Dokumenthanteringssystem hanterar ofta känslig data hos organisationer vilket ställer höga krav på säkerheten. Behörigheter i system måste därför testas noggrant för att säkerställa att data inte hamnar i fel händer. Dokumenthanteringssystem gör det möjligt för flera organisationer att samla sina resurser och kunskaper för att nå gemensamma mål. Gemensamma arbetsprocesser stöds med hjälp av arbetsflöden som innehåller ett antal olika tillstånd. Vid dessa olika tillstånd gäller olika behörigheter. När en behörighet ändras krävs regressionstester för att försäkra att ändringen inte har gjort inverkan på andra behörigheter. Denna studie har utförts som en kvalitativ fallstudie vars syfte var att beskriva utmaningar med regressionstestning av roller och behörigheter i arbetsflöden för dokument i dokumenthanteringssystem. Genom intervjuer och en observation så framkom det att stora utmaningar med dessa tester är att arbetsflödens tillstånd följer en förutbestämd sekvens. För att fullfölja denna sekvens så involveras en enorm mängd behörigheter som måste testas. Det ger ett mycket omfattande testarbete avseende bland annat tid och kostnad. Studien har riktat sig mot dokumenthanteringssystemet ProjectWise som förvaltas av Trafikverket. Beslutsunderlag togs fram för en teknisk lösning för automatiserad regressionstestning av roller och behörigheter i arbetsflöden åt ProjectWise. Utifrån en kravinsamling tillhandahölls beslutsunderlag som involverade Team Foundation Server (TFS), Coded UI och en nyckelordsdriven testmetod som en teknisk lösning. Slutligen jämfördes vilka skillnader den tekniska lösningen kan utgöra mot manuell testning. Utifrån litteratur, dokumentstudie och förstahandserfarenheter visade sig testautomatisering kunna utgöra skillnader inom ett antal identifierade problemområden, bland annat tid och kostnad.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This Thesis project is a part of the all-round automation of production of concentrating solar PV/T systems Absolicon X10. ABSOLICON Solar Concentrator AB has been invented and started production of the prospective solar concentrated system Absolicon X10. The aims of this Thesis project are designing, assembling, calibrating and putting in operation the automatic measurement system intended to evaluate the shape of concentrating parabolic reflectors.On the basis of the requirements of the company administration and needs of real production process the operation conditions for the Laser testing rig were formulated. The basic concept to use laser radiation was defined.At the first step, the complex design of the whole system was made and division on the parts was defined. After the preliminary conducted simulations the function and operation conditions of the all parts were formulated.At the next steps, the detailed design of all the parts was conducted. Most components were ordered from respective companies. Some of the mechanical components were made in the workshop of the company. All parts of the Laser-testing rig were assembled and tested. Software part, which controls the Laser-testing rig work, was created on the LabVIEW basis. To tune and test software part the special simulator was designed and assembled.When all parts were assembled in the complete system, the Laser-testing rig was tested, calibrated and tuned.In the workshop of Absolicon AB, the trial measurements were conducted and Laser-testing rig was installed in the production line at the plant in Soleftea.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Bergkvist insjön AB is a sawmill yard which is capable of producing 350,000 cubic meter of timber every year this requires lot of internal resources. Sawmill operations can be classified as unloading, sorting, storage and production of timber. In the company we have trucks arriving at random they have to be unloaded and sent back at the earliest to avoid queuing up of trucks creating a problem for truck owners. The sawmill yard has to operate with two log stackers that does several tasks including transporting the logs from trucks to measurement station where the logs will be sorted into classes and dropped into pockets from pockets to the sorted timber yard where they are stored and finally from there to sawmill for final processing. The main issue that needs to be answered here is the lining up trucks that are waiting to be unload, creating a problem for both sawmill as well as the truck owners and given huge production volume, it is certain that handling of resources is top priority. A key challenge in handling of resources would be unloading of trucks and finding a way to optimize internal resources.To address this problem i have experimented on different ways of using internal resources, i have designed different cases, in case 1 we have both the log stackers working on sawmill and measurement station. The main objective of having this case is to make sawmill and measurement station to work all the time. Then in case 2, i have divided the work between both the log stackers, one log stacker will be working on sawmill and pocket_control and second log stacker will be working on measurement station and truck. Then in case 3 we have only one log stacker working on all the agents, this case was designed to reduce cost of production, as the experiment cannot be done in real-time due to operational cost, for this purpose simulation is used, preliminary investigation into simulation results suggested that case 2 is the best option has it reduced waiting time of trucks considerably when compared with other cases and it showed 50% increase in optimizing internal resources.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Dynamic system test methods for heating systems were developed and applied by the institutes SERC and SP from Sweden, INES from France and SPF from Switzerland already before the MacSheep project started. These test methods followed the same principle: a complete heating system – including heat generators, storage, control etc., is installed on the test rig; the test rig software and hardware simulates and emulates the heat load for space heating and domestic hot water of a single family house, while the unit under test has to act autonomously to cover the heat demand during a representative test cycle. Within the work package 2 of the MacSheep project these similar – but different – test methods were harmonized and improved. The work undertaken includes:  • Harmonization of the physical boundaries of the unit under test. • Harmonization of the boundary conditions of climate and load. • Definition of an approach to reach identical space heat load in combination with an autonomous control of the space heat distribution by the unit under test. • Derivation and validation of new six day and a twelve day test profiles for direct extrapolation of test results.   The new harmonized test method combines the advantages of the different methods that existed before the MacSheep project. The new method is a benchmark test, which means that the load for space heating and domestic hot water preparation will be identical for all tested systems, and that the result is representative for the performance of the system over a whole year. Thus, no modelling and simulation of the tested system is needed in order to obtain the benchmark results for a yearly cycle. The method is thus also applicable to products for which simulation models are not available yet. Some of the advantages of the new whole system test method and performance rating compared to the testing and energy rating of single components are:  • Interaction between the different components of a heating system, e.g. storage, solar collector circuit, heat pump, control, etc. are included and evaluated in this test. • Dynamic effects are included and influence the result just as they influence the annual performance in the field. • Heat losses are influencing the results in a more realistic way, since they are evaluated under "real installed" and representative part-load conditions rather than under single component steady state conditions.   The described method is also suited for the development process of new systems, where it replaces time-consuming and costly field testing with the advantage of a higher accuracy of the measured data (compared to the typically used measurement equipment in field tests) and identical, thus comparable boundary conditions. Thus, the method can be used for system optimization in the test bench under realistic operative conditions, i.e. under relevant operating environment in the lab.   This report describes the physical boundaries of the tested systems, as well as the test procedures and the requirements for both the unit under test and the test facility. The new six day and twelve day test profiles are also described as are the validation results.