8 resultados para Energy-responsive Design

em Dalarna University College Electronic Archive


Relevância:

40.00% 40.00%

Publicador:

Resumo:

Energy efficiency and renewable energy use are two main priorities leading to industrial sustainability nowadays according to European Steel Technology Platform (ESTP). Modernization efforts can be done by industries to improve energy consumptions of the production lines. These days, steel making industrial applications are energy and emission intensive. It was estimated that over the past years, energy consumption and corresponding CO2 generation has increased steadily reaching approximately 338.15 parts per million in august 2010 [1]. These kinds of facts and statistics have introduced a lot of room for improvement in energy efficiency for industrial applications through modernization and use of renewable energy sources such as solar Photovoltaic Systems (PV).The purpose of this thesis work is to make a preliminary design and simulation of the solar photovoltaic system which would attempt to cover the energy demand of the initial part of the pickling line hydraulic system at the SSAB steel plant. For this purpose, the energy consumptions of this hydraulic system would be studied and evaluated and a general analysis of the hydraulic and control components performance would be done which would yield a proper set of guidelines contributing towards future energy savings. The results of the energy efficiency analysis showed that the initial part of the pickling line hydraulic system worked with a low efficiency of 3.3%. Results of general analysis showed that hydraulic accumulators of 650 liter size should be used by the initial part pickling line system in combination with a one pump delivery of 100 l/min. Based on this, one PV system can deliver energy to an AC motor-pump set covering 17.6% of total energy and another PV system can supply a DC hydraulic pump substituting 26.7% of the demand. The first system used 290 m2 area of the roof and was sized as 40 kWp, the second used 109 m2 and was sized as 15.2 kWp. It was concluded that the reason for the low efficiency was the oversized design of the system. Incremental modernization efforts could help to improve the hydraulic system energy efficiency and make the design of the solar photovoltaic system realistically possible. Two types of PV systems where analyzed in the thesis work. A method was found calculating the load simulation sequence based on the energy efficiency studies to help in the PV system simulations. Hydraulic accumulators integrated into the pickling line worked as energy storage when being charged by the PV system as well.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Knowing how to design a heating system that will work mechanically is quite different from knowling how to design a system that users perceive as responsive to their domestic practices and values. In this chapter, social anthropologist Henning argues that the challenge for designers involved in the development or marketing of green buildings with heating systems that are based on renewable sources of energy is to see things from the perspective of those who are supposed to live in these buildings. The chapter focuses on three culture-specific aspects of Swedish households and single-family houses: perceptions of house and home, of private and public space, and of male and female space. Through these three angles, some clues are given as to how design, performance and location of solar and bio-pellet heating systems could be made to resonate with predominant experiences, habits and ways of thinking among both men and women.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Advanced Building Energy Data Visualization is a way to detect performance problems in commercialbuildings. By placing sensors in a building that collects data from example, air temperature and electricalpower, then makes it possible to calculate the data in Data Visualization software. This softwaregenerates visual diagrams so the building manager or building operator can see if for example thepower consumption is to high.A first step (before sensors are installed in a building) to see how the energy consumption is in abuilding can be to use a Benchmarking Tool. There is a number of Benchmarking Tools that is availablefor free on the Internet. Each tool have a bit different approach, but they all show how much energyconsumption there is in a building compared to other similar buildings.In this study a new web design for the benchmarking tool CalARCH has been developed. CalARCHis developed at the Berkeley Lab in Berkeley, California, USA. CalARCH uses data collected only frombuildings in California, and is only for comparing buildings in California with other similar buildingsin the state.Five different versions of the web site were made. Then a web survey was done to determine whichversion would be the best for CalARCH. The results showed that Version 5 and Version 3 was the best.Then a new version was made, based on these two versions. This study was made at the LawrenceBerkeley Laboratory.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

In Sweden, 90% of the solar heating systems are solar domestic hot water and heating systems (SDHW&H), so called combisystems. These generally supply most of the domestic hot water needs during the summer and have enough capacity to supply some energy to the heating system during spring and autumn. This paper describes a standard Swedish combisystem and how the output from it varies with heating load, climate within Sweden, and how it can be increased with improved system design. A base case is defined using the standard combi- system, a modern Swedish single family house and the climate of Stockholm. Using the simulation program Trnsys, parametric studies have been performed on the base case and improved system designs. The solar fraction could be increased from 17.1% for the base case to 22.6% for the best system design, given the same system size, collector type and load. A short analysis of the costs of changed system design is given, showing that payback times for additional investment are from 5-8 years. Measurements on system components in the laboratory have been used to verify the simulation models used. More work is being carried out in order to find even better system designs, and further improvements in system performance are expected.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

In this study an optimization method for the design of combined solar and pellet heating systems is presented and evaluated. The paper describes the steps of the method by applying it for an example of system. The objective of the optimization was to find the design parameters that give the lowest auxiliary energy (pellet fuel + auxiliary electricity) and carbon monoxide (CO) emissions for a system with a typical load, a single family house in Sweden. Weighting factors have been used for the auxiliary energy use and CO emissions to give a combined target function. Different weighting factors were tested. The results show that extreme weighting factors lead to their own minima. However, it was possible to find factors that ensure low values for both auxiliary energy and CO emissions.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Irradiation distribution functions based on the yearly collectible energy have been derived for two locations; Sydney, Australia which represents a mid-latitude site and Stockholm, Sweden, which represents a high latitude site. The strong skewing of collectible energy toward summer solstice at high latitudes dictates optimal collector tilt angles considerably below the polar mount. The lack of winter radiation at high latitudes indicates that the optimal acceptance angle for a stationary EW-aligned concentrator decreases as latitude increases. Furthermore concentrator design should be highly asymmetric at high latitudes.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The work presented in this thesis concerns the dimensioning of an Energy Storage System (ESS) which will be used as an energy buffer for a grid-connected PV plant. This ESS should help managing the PV plant to inject electricity into the grid according to the requirements of the grid System Operator. It is desired to obtain a final production not below 1300kWh/kWp with a maximum ESS budget of 0.9€/Wp. The PV plant will be sited in Martinique Island and connected to the main grid. This grid is a small one where the perturbations due clouds in the PV generation are not negligible anymore. A software simulation tool, incorporating a model for the PV-plant production, the ESS and the required injection pattern of electricity into the grid has been developed in MS Excel. This tool has been used to optimize the relevant parameters defining the ESS so that the feed-in of electricity into the grid can be controlled to fulfill the conditions given by the System Operator. The inputs used for this simulation tool are, besides the conditions given by the System Operator on the allowed injection pattern, the production data from a similar PV-plant in a close-by location, and variables for defining the ESS. The PV production data used is from a site with similar climate and weather conditions as for the site on the Martinique Island and hence gives information on the short term insolation variations as well as expected annual electricity production. The ESS capacity and the injected electric energy will be the main figures to compare while doing an economic study of the whole plant. Hence, the Net Present Value, Benefit to Cost method and Pay-back period studies are carried on as dependent of the ESS capacity. The conclusion of this work is that it is possible to obtain the requested injection pattern by using an ESS. The design of the ESS can be made within an acceptable budget. The capacity of ESS to link with the PV system depends on the priorities of the final output characteristics, and it also depends on which economic parameter that is chosen as a priority.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

In this thesis the solar part of a large grid-connected photovoltaic system design has been done. The main purpose was to size and optimize the system and to present figures helping to evaluate the prospective project rationality, which can potentially be constructed on a contaminated area in Falun. The methodology consisted in PV market study and component selection, site analysis and defining suitable area for solar installation; and system configuration optimization based on PVsyst simulations and Levelized Cost of Energy calculations. The procedure was mainly divided on two parts, preliminary and detailed sizing. In the first part the objective was complex, which included the investigation of the most profitable component combination and system optimization due to tilt and row distance. It was done by simulating systems with different components and orientations, which were sized for the same 100kW inverter in order to make a fair comparison. For each simulated result a simplified LCOE calculation procedure was applied. The main results of this part show that with the price of 0.43 €/Wp thin-film modules were the most cost effective solution for the case with a great advantage over crystalline type in terms of financial attractiveness. From the results of the preliminary study it was possible to select the optimal system configuration, which was used in the detailed sizing as a starting point. In this part the PVsyst simulations were run, which included full scale system design considering near shadings created by factory buildings. Additionally, more complex procedure of LCOE calculation has been used here considered insurances, maintenance, time value of money and possible cost reduction due to the system size. Two system options were proposed in final results; both cover the same area of 66000 m2. The first one represents an ordinary South faced design with 1.1 MW nominal power, which was optimized for the highest performance. According to PVsyst simulations, this system should produce 1108 MWh/year with the initial investment of 835,000 € and 0.056 €/kWh LCOE. The second option has an alternative East-West orientation, which allows to cover 80% of occupied ground and consequently have 6.6 MW PV nominal power. The system produces 5388 MWh/year costs about 4500,000 € and delivers electricity with the same price of 0.056 €/kWh. Even though the EW solution has 20% lower specific energy production, it benefits mainly from lower relative costs for inverters, mounting and annual maintenance expenses. After analyzing the performance results, among the two alternatives none of the systems showed a clear superiority so there was no optimal system proposed. Both, South and East-West solutions have own advantages and disadvantages in terms of energy production profile, configuration, installation and maintenance. Furthermore, the uncertainty due to cost figures assumptions restricted the results veracity.