Energy efficiency and renewable energy use are two main priorities leading to industrial sustainability nowadays according to European Steel Technology Platform (ESTP). Modernization efforts can be done by industries to improve energy consumptions of the production lines. These days, steel making industrial applications are energy and emission intensive. It was estimated that over the past years, energy consumption and corresponding CO2 generation has increased steadily reaching approximately 338.15 parts per million in august 2010 [1]. These kinds of facts and statistics have introduced a lot of room for improvement in energy efficiency for industrial applications through modernization and use of renewable energy sources such as solar Photovoltaic Systems (PV).The purpose of this thesis work is to make a preliminary design and simulation of the solar photovoltaic system which would attempt to cover the energy demand of the initial part of the pickling line hydraulic system at the SSAB steel plant. For this purpose, the energy consumptions of this hydraulic system would be studied and evaluated and a general analysis of the hydraulic and control components performance would be done which would yield a proper set of guidelines contributing towards future energy savings. The results of the energy efficiency analysis showed that the initial part of the pickling line hydraulic system worked with a low efficiency of 3.3%. Results of general analysis showed that hydraulic accumulators of 650 liter size should be used by the initial part pickling line system in combination with a one pump delivery of 100 l/min. Based on this, one PV system can deliver energy to an AC motor-pump set covering 17.6% of total energy and another PV system can supply a DC hydraulic pump substituting 26.7% of the demand. The first system used 290 m2 area of the roof and was sized as 40 kWp, the second used 109 m2 and was sized as 15.2 kWp. It was concluded that the reason for the low efficiency was the oversized design of the system. Incremental modernization efforts could help to improve the hydraulic system energy efficiency and make the design of the solar photovoltaic system realistically possible. Two types of PV systems where analyzed in the thesis work. A method was found calculating the load simulation sequence based on the energy efficiency studies to help in the PV system simulations. Hydraulic accumulators integrated into the pickling line worked as energy storage when being charged by the PV system as well.
Resumo:
This master thesis presents a new technological combination of two environmentally friendly sources of energy in order to provide DHW, and space heating. Solar energy is used for space heating, and DHW production using PV modules which supply direct current directly to electrical heating elements inside a water storage tank. On the other hand a GSHP system as another source of renewable energy provides heat in the water storage tank of the system in order to provide DHW and space heating. These two sources of renewable energy have been combined in this case-study in order to obtain a more efficient system, which will reduce the amount of electricity consumed by the GSHP system.The key aim of this study is to make simulations, and calculations of the amount ofelectrical energy that can be expected to be produced by a certain amount of PV modules that are already assembled on a house in Vantaa, southern Finland. This energy is then intended to be used as a complement to produce hot water in the heating system of the house beside the original GSHP system. Thus the amount of electrical energy purchased from the grid should be reduced and the compressor in the GSHP would need fewer starts which would reduce the heating cost of the GSHP system for space heating and providing hot water.The produced energy by the PV arrays in three different circuits will be charged directly to three electrical heating elements in the water storage tank of the existing system to satisfy the demand of the heating elements. The excess energy can be used to heat the water in the water storage tank to some extent which leads to a reduction of electricity consumption by the different components of the GSHP system.To increase the efficiency of the existing hybrid system, optimization of different PV configurations have been accomplished, and the results are compared. Optimization of the arrays in southern and western walls shows a DC power increase of 298 kWh/year compared with the existing PV configurations. Comparing the results from the optimization of the arrays on the western roof if the intention is to feed AC power to the components of the GSHP system shows a yearly AC power production of 1,646 kWh.This is with the consideration of no overproduction by the PV modules during the summer months. This means the optimized PV systems will be able to cover a larger part of summer demand compared with the existing system.
Resumo:
The aim of this study was to investigate electricity supply solutions for an educationalcenter that is being built in Chonyonyo Tanzania. Off-grid power generation solutions andfurther optimization possibilities were studied for the case.The study was done for Engineers Without Borders in Sweden. Who are working withMavuno Project on the educational center. The school is set to start operating in year 2015with 40 girl students in the beginning. The educational center will help to improve genderequality by offering high quality education in a safe environment for girls in rural area.It is important for the system to be economically and environmentally sustainable. Thearea has great potential for photovoltaic power generation. Thus PV was considered as theprimary power generation and a diesel generator as a reliable backup. The system sizeoptimization was done with HOMER. For the simulations HOMER required componentdata, weather data and load data. Common components were chose with standardproperties, the loads were based on load estimations from year 2011 and the weather datawas acquired from NASA database. The system size optimization result for this base casewas a system with 26 kW PW; 5.5 kW diesel generator, 15 kW converter and 112 T-105batteries. The initial cost of the system was 55 875 €, the total net present cost 92 121 €and the levelized cost of electricity 0.264 €/kWh.In addition three optimization possibilities were studied. First it was studied how thesystem should be designed and how it would affect the system size to have night loads(security lights) use DC and could the system then be extended in blocks. As a result it wasfound out that the system size could be decreased as the inverter losses would be avoided.Also the system extension in blocks was found to be possible. The second study was aboutinverter stacking where multiple inverters can work as one unit. This type of connectionallows only the required number of inverters to run while shutting down the excess ones.This would allow the converter-unit to run with higher efficiency and lower powerconsumption could be achieved. In future with higher loads the system could be easilyextendable by connecting more inverters either in parallel or series depending on what isneeded. Multiple inverters would also offer higher reliability than using one centralizedinverter. The third study examined how the choice of location for a centralized powergeneration affects the cable sizing for the system. As a result it was found that centralizedpower generation should be located close to high loads in order to avoid long runs of thickcables. Future loads should also be considered when choosing the location. For theeducational center the potential locations for centralized power generation were found outto be close to the school buildings and close to the dormitories.
Resumo:
Photovoltaic Thermal/Hybrid collectors are an emerging technology that combines PV and solar thermal collectors by producing heat and electricity simultaneously. In this paper, the electrical performance evaluation of a low concentrating PVT collector was done through two testing parts: power comparison and performance ratio testing. For the performance ratio testing, it is required to identify and measure the factors affecting the performance ratio on a low concentrating PVT collector. Factors such as PV cell configuration, collector acceptance angle, flow rate, tracking the sun, temperature dependence and diffuse to irradiance ratio. Solarus low concentrating PVT collector V12 was tested at Dalarna University in Sweden using the electrical equipment at the solar laboratory. The PV testing has showed differences between the two receivers. Back2 was producing 1.8 energy output more than Back1 throughout the day. Front1 and Front2 were almost the same output performance. Performance tests showed that the cell configuration for Receiver2 with cells grouping (6- 32-32-6) has proved to have a better performance ratio when to it comes to minimizing the shading effect leading to more output power throughout the day because of lowering the mismatch losses. Different factors were measured and presented in this thesis in chapter 5. With the current design, it has been obtained a peak power at STC of 107W per receiver. The solar cells have an electrical efficiency of approximately 19% while the maximum measured electrical efficiency for the collector was approximately 18 % per active cell area, in addition to a temperature coefficient of -0.53%/ ˚C. Finally a recommendation was done to help Solarus AB to know how much the electrical performance is affected during variable ambient condition and be able to use the results for analyzing and introducing new modification if needed.
Resumo:
Background: Acupuncture is commonly used to reduce pain during labour despite contradictory results. The aim of this study is to evaluate the effectiveness of acupuncture with manual stimulation and acupuncture with combined manual and electrical stimulation (electro-acupuncture) compared with standard care in reducing labour pain. Our hypothesis was that both acupuncture stimulation techniques were more effective than standard care, and that electro-acupuncture was most effective. Methods: A longitudinal randomised controlled trial. The recruitment of participants took place at the admission to the labour ward between November 2008 and October 2011 at two Swedish hospitals. 303 nulliparous women with normal pregnancies were randomised to: 40 minutes of manual acupuncture (MA), electro-acupuncture (EA), or standard care without acupuncture (SC). Primary outcome: labour pain, assessed by Visual Analogue Scale (VAS). Secondary outcomes: relaxation, use of obstetric pain relief during labour and post-partum assessments of labour pain. The sample size calculation was based on the primary outcome and a difference of 15 mm on VAS was regarded as clinically relevant, this gave 101 in each group, including a total of 303 women. Results: Mean estimated pain scores on VAS (SC: 69.0, MA: 66.4 and EA: 68.5), adjusted for: treatment, age, education, and time from baseline, with no interactions did not differ between the groups (SC vs MA: mean difference 2.6, 95% confidence interval [CI] -1.7-6.9 and SC vs EA: mean difference 0.6 [95% CI] -3.6-4.8). Fewer number of women in the EA group used epidural analgesia (46%) than women in the MA group (61%) and SC group (70%) (EA vs SC: odds ratio [OR] 0.35; [95% CI] 0.19-0.67). Conclusions: Acupuncture does not reduce women's experience of labour pain, neither with manual stimulation nor with combined manual and electrical stimulation. However, fewer women in the EA group used epidural analgesia thus indicating that the effect of acupuncture with electrical stimulation may be underestimated. These findings were obtained in a context with free access to other forms of pain relief.
Resumo:
BACKGROUND: In a previous randomised controlled trial we showed that acupuncture with a combination of manual- and electrical stimulation (EA) did not affect the level of pain, as compared with acupuncture with manual stimulation (MA) and standard care (SC), but reduced the need for other forms of pain relief, including epidural analgesia. To dismiss an under-treatment of pain in the trial, we did a long-term follow up on the recollection of labour pain and the birth experience comparing acupuncture with manual stimulation, acupuncture with combined electrical and manual stimulation with standard care. Our hypothesis was that despite the lower frequency of use of other pain relief, women who had received EA would make similar retrospective assessments of labour pain and the birth experience 2 months after birth as women who received standard care (SC) or acupuncture with manual stimulation (MA). METHODS: Secondary analyses of data collected for a randomised controlled trial conducted at two delivery wards in Sweden. A total of 303 nulliparous women with normal pregnancies were randomised to: 40 min of MA or EA, or SC without acupuncture. Questionnaires were administered the day after partus and 2 months later. RESULTS: Two months postpartum, the mean recalled pain on the visual analogue scale (SC: 70.1, MA: 69.3 and EA: 68.7) did not differ between the groups (SC vs MA: adjusted mean difference 0.8, 95 % confidence interval [CI] -6.3 to 7.9 and SC vs EA: mean difference 1.3 CI 95 % -5.5 to 8.1). Positive birth experience (SC: 54.3 %, MA: 64.6 % and EA: 61.0 %) did not differ between the groups (SC vs MA: adjusted Odds Ratio [OR] 1.8, CI 95 % 0.9 to 3.7 and SC vs EA: OR 1.4 CI 95 % 0.7 to 2.6). CONCLUSIONS: Despite the lower use of other pain relief, women who received acupuncture with the combination of manual and electrical stimulation during labour made the same retrospective assessments of labour pain and birth experience 2 months postpartum as those who received acupuncture with manual stimulation or standard care. TRIAL REGISTRATION: ClinicalTrials.gov: NCT01197950.
Resumo:
The demand for cooling and air-conditioning of building is increasingly ever growing. This increase is mostly due to population and economic growth in developing countries, and also desire for a higher quality of thermal comfort. Increase in the use of conventional cooling systems results in larger carbon footprint and more greenhouse gases considering their higher electricity consumption, and it occasionally creates peaks in electricity demand from power supply grid. Solar energy as a renewable energy source is an alternative to drive the cooling machines since the cooling load is generally high when solar radiation is high. This thesis examines the performance of PV/T solar collector manufactured by Solarus company in a solar cooling system for an office building in Dubai, New Delhi, Los Angeles and Cape Town. The study is carried out by analyzing climate data and the requirements for thermal comfort in office buildings. Cooling systems strongly depend on weather conditions and local climate. Cooling load of buildings depend on many parameters such as ambient temperature, indoor comfort temperature, solar gain to the building and internal gains including; number of occupant and electrical devices. The simulations were carried out by selecting a suitable thermally driven chiller and modeling it with PV/T solar collector in Polysun software. Fractional primary energy saving and solar fraction were introduced as key figures of the project to evaluate the performance of cooling system. Several parametric studies and simulations were determined according to PV/T aperture area and hot water storage tank volume. The fractional primary energy saving analysis revealed that thermally driven chillers, particularly adsorption chillers are not suitable to be utilizing in small size of solar cooling systems in hot and tropic climates such as Dubai and New Delhi. Adsorption chillers require more thermal energy to meet the cooling load in hot and dry climates. The adsorption chillers operate in their full capacity and in higher coefficient of performance when they run in a moderate climate since they can properly reject the exhaust heat. The simulation results also indicated that PV/T solar collector have higher efficiency in warmer climates, however it requires a larger size of PV/T collectors to supply the thermally driven chillers for providing cooling in hot climates. Therefore using an electrical chiller as backup gives much better results in terms of primary energy savings, since PV/T electrical production also can be used for backup electrical chiller in a net metering mechanism.