8 resultados para Built in 1973 Maison

em Dalarna University College Electronic Archive


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Going from having bought the most essential at the small shops close to home, better communications and an increasingly consumption oriented lifestyle has created a change in shopping behavior and has led to phenomenon such as shopping centres and more. These are constantly being built in Sweden: in the cities, outside the cities and more recently even in small cities -small cities as for one reason or another have access to a larger customer base which can have businesses to flourish economically. During the first decade of the 21st century, shopping centres have been established along the Swedish/Norwegian border. Since the Norwegian Krone is much stronger than the Swedish Krona Norwegians save a great deal of money on going to Sweden to shop. During the shopping trips to Sweden, it is mostly alcohol, meat, tobacco and candy that are being bought. However, other products such as clothing, technology, household appliances and more are also being purchased, all to save money on the trip. Together these cross border shoppers spent 11, 6 billion in Sweden during the year of 2010. This gives an average spending of approximately 10 900 SEK per cross border shopper on annual basis. Nordby, Töcksfors and Charlottenberg (small cities located in southwestern Sweden) are places characterized by Norwegian cross border shopping. Together, they generate billions every year and this only seems to increase. These places are relatively small in size but have prominent attributes such as proximity to the Norwegian border. Apart from these resorts and shopping centres, there are few or none similar places near the Norwegian border in the rest of Sweden. However, a place which is geographically well located and has a relatively large Norwegian and Swedish customer base is the ski resort of Sälen in west central of Sweden. Sälen is a village located near the Norwegian border, although fairly sparsely populated. The destination has annually about one million official guest nights, based on the 414 000 visitors who stay an average of about 4, 5 days.  Per visit, these tourists individually spend an average of 862 SEK on shopping at the destination. The expenditure of the mountain tourists together with the Norwegian border shoppers makes it very interesting to explore the opportunities for shopping development in terms of a shopping centre in the region of Sälen.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The aim of this study was to investigate electricity supply solutions for an educationalcenter that is being built in Chonyonyo Tanzania. Off-grid power generation solutions andfurther optimization possibilities were studied for the case.The study was done for Engineers Without Borders in Sweden. Who are working withMavuno Project on the educational center. The school is set to start operating in year 2015with 40 girl students in the beginning. The educational center will help to improve genderequality by offering high quality education in a safe environment for girls in rural area.It is important for the system to be economically and environmentally sustainable. Thearea has great potential for photovoltaic power generation. Thus PV was considered as theprimary power generation and a diesel generator as a reliable backup. The system sizeoptimization was done with HOMER. For the simulations HOMER required componentdata, weather data and load data. Common components were chose with standardproperties, the loads were based on load estimations from year 2011 and the weather datawas acquired from NASA database. The system size optimization result for this base casewas a system with 26 kW PW; 5.5 kW diesel generator, 15 kW converter and 112 T-105batteries. The initial cost of the system was 55 875 €, the total net present cost 92 121 €and the levelized cost of electricity 0.264 €/kWh.In addition three optimization possibilities were studied. First it was studied how thesystem should be designed and how it would affect the system size to have night loads(security lights) use DC and could the system then be extended in blocks. As a result it wasfound out that the system size could be decreased as the inverter losses would be avoided.Also the system extension in blocks was found to be possible. The second study was aboutinverter stacking where multiple inverters can work as one unit. This type of connectionallows only the required number of inverters to run while shutting down the excess ones.This would allow the converter-unit to run with higher efficiency and lower powerconsumption could be achieved. In future with higher loads the system could be easilyextendable by connecting more inverters either in parallel or series depending on what isneeded. Multiple inverters would also offer higher reliability than using one centralizedinverter. The third study examined how the choice of location for a centralized powergeneration affects the cable sizing for the system. As a result it was found that centralizedpower generation should be located close to high loads in order to avoid long runs of thickcables. Future loads should also be considered when choosing the location. For theeducational center the potential locations for centralized power generation were found outto be close to the school buildings and close to the dormitories.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Background and aims Evaluating status in patients with motor fluctuations is complex and occasional observations/measurements do not give an adequate picture as to the time spent in different states. We developed a test battery to assess advanced Parkinson patients' status consisting of diary assessments and motor tests. This battery was constructed and implemented on a handheld computer with built-in mobile communication. In fluctuating patients, it should typically be used several times daily in the home environment, over periods of about one week. The aim of this battery is to provide status information in order to evaluate treatment effects in clinical practice and research, follow up treatments and disease progression and predict outcome to optimize treatment strategy. Methods Selection of diary questions was based on a previous study with Duodopa® (DIREQT). Tapping tests (with and without visual cueing) and a spiral drawing test were added. Rapid prototyping was used in development of the user interface. An evaluation with two pilot patients was performed before and after receiving new treatments for advanced disease (one received Duodopa® and one received DBS). Speed and proportion missed taps were calculated for the tapping tests and entropy of the radial drawing velocity was calculated for the spiral tests. Test variables were evaluated using non-parametric statistics. Results Post-treatment improvement was detected in both patients in many of the test variables. Conclusions Although validation work remains, preliminary results are promising and the test battery is currently being evaluated in a long-term health economics study with Duodopa® (DAPHNE).

Relevância:

100.00% 100.00%

Publicador:

Resumo:

A sealed space between absorber and cover glass makes it possible reducing the influence of humidity condensate and dust at the same time as the enclosed space can be filled with a suitable gas for lowering the losses. This paper is about the size of the losses in these collectors. A calculating model of a gas-filled flat plate solar collector was built in Matlab with standard heat transfer formulas. It showed that the total loss can be reduced up to 20% when changing to an inert gas. It is also possible using a much shorter distance and still achieve low losses at the same time as the mechanical stresses in the material is reduce.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The fact that most of the large scale solar PV plants are built in arid and semi-arid areas where land availability and solar radiation is high, it is expected the performance of the PV plants in such locations will be affected significantly due to high cell temperature as well as due to soiling. Therefore, it is essential to study how the different PV module technologies will perform in such geographical locations to ensure a consistent and reliable power delivery over the lifetime of the PV power plants. As soiling is strongly dependent on the climatic conditions of a particular location a test station, consisted of about 24 PV modules and a well-equipped weather station, was built within the fences of Scatec’s 75 MW Kalkbult solar PV plant in South Africa. This study was performed to a better understand the effect of soiling by comparing the relative power generation by the cleaned modules to the un-cleaned modules. Such knowledge can enable more quantitative evaluations of the cleaning strategies that are going to be implemented in bigger solar PV power plants. The data collected and recorded from the test station has been analyzed at IFE, Norway using a MatLab script written for this thesis project. This thesis work has been done at IFE, Norway in collaboration with Stellenbosch University in South Africa and Scatec Solar a Norwegian independent power producer company. Generally for the polycrystalline modules it is found that the average temperature corrected efficiency during the period of the experiment has been 15.00±0.08 % and for the thin film-CdTe with ARC is 11.52% and for the thin film without ARC is about 11.13% with standard uncertainty of ±0.01 %. Besides, by comparing the initial relative average efficiency of the polycrystalline-Si modules when all the modules have been cleaned for the first time and the final relative efficiency; after the last cleaning schedule which is when all the reference modules E, F, G, and H have been cleaned for the last time it is found that poly3 performs 2 % and 3 % better than poly1 and poly16 respectively, poly13 performs 1 % better than poly15 as well as poly5 and poly12 performs 1 % and 2 % better than poly10 respectively. Besides, poly5 and poly12 performs a 9 % and 11 % better than poly7. Furthermore, there is no change in performance between poly6 and poly9 as well as poly4 and poly15. However, the increase in performance of poly3 to poly1, poly13 to poly15 as well as poly5 and poly12 to poly10 is insignificant. In addition, it is found that TF22 perform 7% better than the reference un-cleaned module TF24 and similarly; TF21 performs 7% higher than TF23. Furthermore, modules with ARC glass (TF17, TF18, TF19, and TF20) shows that cleaning the modules with only distilled water (TF19) or dry-cleaned after cleaned with distilled water(TF20) decreases the performance of the modules by 5 % and 4 % comparing to its respective reference uncleanedmodules TF17 and TF18 respectively.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

IPTV is now offered by several operators in Europe, US and Asia using broadcast video over private IP networks that are isolated from Internet. IPTV services rely ontransmission of live (real-time) video and/or stored video. Video on Demand (VoD)and Time-shifted TV are implemented by IP unicast and Broadcast TV (BTV) and Near video on demand are implemented by IP multicast. IPTV services require QoS guarantees and can tolerate no more than 10-6 packet loss probability, 200 ms delay, and 50 ms jitter. Low delay is essential for satisfactory trick mode performance(pause, resume,fast forward) for VoD, and fast channel change time for BTV. Internet Traffic Engineering (TE) is defined in RFC 3272 and involves both capacity management and traffic management. Capacity management includes capacityplanning, routing control, and resource management. Traffic management includes (1)nodal traffic control functions such as traffic conditioning, queue management, scheduling, and (2) other functions that regulate traffic flow through the network orthat arbitrate access to network resources. An IPTV network architecture includes multiple networks (core network, metronetwork, access network and home network) that connects devices (super head-end, video hub office, video serving office, home gateway, set-top box). Each IP router in the core and metro networks implements some queueing and packet scheduling mechanism at the output link controller. Popular schedulers in IP networks include Priority Queueing (PQ), Class-Based Weighted Fair Queueing (CBWFQ), and Low Latency Queueing (LLQ) which combines PQ and CBWFQ.The thesis analyzes several Packet Scheduling algorithms that can optimize the tradeoff between system capacity and end user performance for the traffic classes. Before in the simulator FIFO,PQ,GPS queueing methods were implemented inside. This thesis aims to implement the LLQ scheduler inside the simulator and to evaluate the performance of these packet schedulers. The simulator is provided by ErnstNordström and Simulator was built in Visual C++ 2008 environmentand tested and analyzed in MatLab 7.0 under windows VISTA.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Allt hårdare lagkrav gör att det är svårt att energieffektivisera befintliga byggnader utan att förändra deras utseende. Syftet med examensarbetet är att utreda hur stor energieffektivisering, för tre befintliga småhus uppförda under 1900-talet, som är möjlig att uppnå genom förbättring av byggnadernas klimatskal, det vill säga tak, väggar, golv, fönster och dörrar, utan att förvanska byggnadernas utseende och samtidigt bevara deras kulturhistoriska värden. Arbetet bestod av en förstudie där tre byggnader identifierades, ett undersökningsskede där information om byggnaderna togs fram och ett slutsatsskede där energibesparande åtgärdsförslag togs fram och utvärderades. Byggnader som var goda representanter för sin tid och stil söktes. Byggnader från 1910-talet, 1930-talet och 1970-talet, lokaliserades. Sedan gjordes det fallstudier med intervjuer och inventeringar. För att utreda byggnadens klimatskal utfördes u-värdesberäkningar och energiberäkningar av befintliga byggander och byggnader baserade på föreslagna åtgärdsförslag. Ingen av byggnaderna nådde efter föreslagna åtgärder ner till passivhuskravet 59 kWh/år/m2 Atemp eller BBR-kravet 110 kWh/år/m2 Atemp för en byggnads specifika energianvändning. Den största möjliga energieffektivisering för de tre byggnaderna uppförda under 1900-talet, som är möjlig att uppnå utan att förvanska byggnadernas utseende och samtidigt bevara deras kulturhistoriska värden är 13,0 kWh/år/m2 Atemp, 49,7 kWh/år/m2 Atemp respektive 64,8 kWh/år/m2 Atemp. Slutsatser från arbetet är att byggnader från 1910-tal kan åtgärdas genom att isolera fönstren, sätta dit en extra dörr på insidan av ytterdörren samt tilläggsisolera snedtaket. Byggnader från 1930-tal kan åtgärdas genom att isolera fönstren med en isolerruta på insidan av fönstret och dörrarna med en extra dörr på insidan av ytterdörren. Byggnader från 1970-tal kan åtgärda fönstren genom att byta ut dem till energifönster, ingen åtgärd för golvet men fasaden isoleras utvändigt med vakuumisolering. Byggnaden från 1970-talet klarade sig bäst i jämförelsen eftersom den var i autentiskt skick från början vilket gjorde att förbättringen blev större än för till exempel byggnaden från 1910-talet som redan var ombyggd innan åtgärder föreslogs.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Ukraine has repeatedly shifted between the two sub-types of semi-presidentialism, i.e. between premier-presidentialism and president-parliamentarism. The aim of this article is to discuss to what extent theoretical arguments against premier-presidential and president-parliamentary systems are relevant for understanding the shifting directions of the Ukrainian regime. As a point of departure, I formulate three main claims from the literature: 1) “President-parliamentarism is less conducive to democratization than premier-presidentialism.”; 2) “Semi-presidentialism in both its variants have built-in incitements for intra-executive conflict between the president and the prime minister.”; 3) “Semi-presidentialism in general, and president-parliamentarism in particular, encourages presidentialization of political parties.” I conclude from the study’s empirical overview that the president-parliamentary system– the constitutional arrangement with the most dismal record of democratization – has been instrumental in strengthening presidential dominance and authoritarian tendencies. The premier-presidential period 2006–2010 was by no means smooth and stable, but the presidential dominance weakened and the survival of the government was firmly anchored in the parliament. During this period, there were also indications of a gradual strengthening of institutional capacity among the main political parties and the parliament began to emerge as a significant political arena.