48 resultados para Solar water heating systems


Relevância:

100.00% 100.00%

Publicador:

Resumo:

In Sweden, 90% of the solar heating systems are solar domestic hot water and heating systems (SDHW&H), so called combisystems. These generally supply most of the domestic hot water needs during the summer and have enough capacity to supply some energy to the heating system during spring and autumn. This paper describes a standard Swedish combisystem and how the output from it varies with heating load, climate within Sweden, and how it can be increased with improved system design. A base case is defined using the standard combi- system, a modern Swedish single family house and the climate of Stockholm. Using the simulation program Trnsys, parametric studies have been performed on the base case and improved system designs. The solar fraction could be increased from 17.1% for the base case to 22.6% for the best system design, given the same system size, collector type and load. A short analysis of the costs of changed system design is given, showing that payback times for additional investment are from 5-8 years. Measurements on system components in the laboratory have been used to verify the simulation models used. More work is being carried out in order to find even better system designs, and further improvements in system performance are expected.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Within the frame of the project REBUS, "Competitive solar heating systems for residential buildings", which is financed by Nordic Energy Research, a new type of compact solar combisystem with high degree of prefabrication was developed. A hydraulic and control concept was designed with the goal to get highest system efficiency for use with either a condensing natural gas boiler or a pellet boiler. Especially when using the potential of high peak power of modern condensing natural gas boilers, a new operation strategy of a natural gas boiler/solar combisystem can increase the energy savings of a small solar combisystem by about 80% compared to conventional operation strategies.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Within the framework of the REBUS project the German building industry has been investigated regarding their energy concepts. The intention was to evaluatethe establishment of renewable energy sources on the German market for new built houses and prefab houses in particular. For this purpose the products of 85manufacturers of prefab houses have been analyzed. Of special interest was the applicationof heating and hot water systems driven by solar energy and biomass. The results show that both techniques are well accepted and established. Almost 90% of themanufacturers offer solar systems on request and almost 70% heating systems based on Pellets. 24% offered solar and 7% as standard options in their range. From theachieved figures the potential of the Swedish market can be worked out. Strategies to introduce renewable energy to a greater extent to Swedish house manufacturers and builders might also be found.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The main aim of this project is to develop an ESES lab on a full scale system. The solar combisystem used is available most of the time and is only used twice a year to carry out some technical courses. At the moment, there are no other laboratories about combisystems. The experiments were designed in a way to use the system to the most in order to help the students apply the theoretical knowledge in the solar thermal course as well as make them more familiar with solar systems components. The method adopted to reach this aim is to carry out several test sequences on the system, in order to help formulating at the end some educating experiments. A few tests were carried out at the beginning of the project just for the sake of understanding the system and figuring out if any additional measuring equipment is required. The level of these tests sequences was varying from a simple energy draw off or collector loop controller respond tests to more complicated tests, such as the use of the ‘collector’ heater to simulate the solar collector effect on the system. The tests results were compared and verified with the theoretical data wherever relevant. The results of the experiment about the use of the ‘collector’ heater instead of the collector were positively acceptable. Finally, the Lab guide was developed based on the results of these experiments and also the experience gotten while conducting them. The lab work covers the theories related to solar systems in general and combisystems in particular. 

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The aim of this study was to investigate how electricallyheated houses can be converted to using wood pellet and solarheating. There are a large number of wood pellet stoves on themarket. Many stoves have a water jacket, which gives anopportunity to distribute the heat to domestic hot water and aradiator heating system. Three typical Swedish houses with electric resistanceheating have been studied. Fourteen different system conceptsusing wood pellet stoves and solar heating systems have beenevaluated. The systems and the houses have been simulated indetail using TRNSYS. The houses have been divided in up to 10different zones and heat transfer by air circulation throughdoorways and open doors have been simulated. The pellet stoveswere simulated using a recently developed TRNSYS component,which models the start- and stop phases, emissions and thedynamic behaviour of the stoves. The model also calculates theCO-emissions. Simulations were made with one stove without awater jacket and two stoves with different fractions of thegenerated heat distributed in the water circuit. Simulations show that the electricity savings using a pelletstove are greatly affected by the house plan, the systemchoice, if the internal doors are open or closed and thedesired level of comfort. Installing a stove with awater-jacket connected to a radiator system and a hot waterstorage has the advantage that heat can be transferred todomestic hot water and be distributed to other rooms. Suchsystems lead to greater electricity savings, especially inhouses having a traditional layout. It was found that not allrooms needed radiators and that it was more effective in mostcases t use a stove with a higher fraction of the heatdistributed by the water circuit. The economic investigation shows that installing a woodpellet stove without a water jacket gives the lowest totalenergy- and capital costs in the house with an open plan (fortoday's energy prices and the simulated comfort criteria). Inthe houses with a traditional layout a pellet stove givesslightly higher costs than the reference house having onlyelectrical resistance heating due to the fact that less heatingcan be replaced. The concepts including stoves with a waterjacket all give higher costs than the reference system, but theconcept closest to be economical is a system with a bufferstore, a stove with a high fraction of the heat distributed bythe water circuit, a new water radiator heating system and asolar collector. Losses from stoves can be divided into: flue gas lossesincluding leakage air flow when the stove is not in operation;losses during start and stop phases; and losses due to a highair factor. An increased efficiency of the stoves is importantboth from a private economical point of view, but also from theperspective that there can be a lack of bio fuel in the nearfuture also in Sweden. From this point of view it is alsoimportant to utilize as much solar heat as possible. Theutilization of solar heat is low in the simulated systems,depending on the lack of space for a large buffer store. The simulations have shown that the annual efficiency ismuch lower that the nominal efficiency at full power. Thesimulations have also shown that changing the control principlefor the stove can improve efficiency and reduce theCO-emissions. Today's most common control principle for stovesis the on/off control, which results in many starts and stopsand thereby high CO-emissions. A more advanced control varyingthe heating rate from maximum to minimum to keep a constantroom temperature reduces the number of starts and stops andthereby the emissions. Also the efficiency can be higher withsuch a control, and the room temperature will be kept at a moreconstant temperature providing a higher comfort.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This research was carried out by studying possible renovation of a two-storey detached multifamily building by using passive solar design options in a cold climate in Borlänge, Sweden where the heating Degree Days are 4451 (base 20°C). Borlänge`s housing company, Tunabyggen, plans to renovate the project house located inthe multicultural district, Jakobsgårdarna. The goal of the thesis was to suggest a redesign of the current building, decrease the heating energy use, by applying passive solar design and control strategies, in a most reasonable way. In addition ensure a better thermal comfort for the tenants in the dwellings. Literatures have been studied, from which can be inferred that passive design should be abasic design consideration for all housing constructions, because it has advantages to ensure thermal comfort, and reduce the energy use. In addition further savings can be achieved applying different types of control strategies, from which the house will be more personalized, and better adapted to the user’s needs.The proposed method is based on simulations by using TRNSYS software. First a proper building model was set up, which represents the current state of the project building. Then the thermal insulation and the windows were upgraded, based on today's building regulations. The developments of the passive solar options were accomplished in two steps. First of all the relevant basic passive design elements were considered, then those advantages were compared to the advantages of applying new conventional thermostat, and shading control strategies.The results show that there is significant potential with the different types of passive solar design; their usage depends primarily on the location of the site as well as the orientation of the project building. Applying the control strategies, such as thermostat, and shading control, along the thermal insulation upgrade, may lead to significant energy savings (around 40 %), by comparison to the reference building without any upgrade.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The Solar HeatIntegration NEtwork (SHINE) is a European research school in which 13 PhDstudents in solar thermal technologies are funded by the EU Marie-Curie program.It has five PhD course modules as well as workshops and seminars dedicated to PhDstudents both within the project as well as outside of it. The SHINE researchactivities focus on large solar heating systems and new applications: ondistrict heating, industrial processes and new storage systems. The scope ofthis paper is on systems for district heating for which there are five PhDstudents, three at universities and two at companies. The PhD students allstarted during the early part of 2014 and their initial work has concentratedon literature studies and on setting up models and data collection to be usedfor validation purposes. The PhD students will complete their studies in2017-18.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This Thesis project is a part of the all-round automation of production of concentrating solar PV/T systems Absolicon X10. ABSOLICON Solar Concentrator AB has been invented and started production of the prospective solar concentrated system Absolicon X10. The aims of this Thesis project are designing, assembling, calibrating and putting in operation the automatic measurement system intended to evaluate the shape of concentrating parabolic reflectors.On the basis of the requirements of the company administration and needs of real production process the operation conditions for the Laser testing rig were formulated. The basic concept to use laser radiation was defined.At the first step, the complex design of the whole system was made and division on the parts was defined. After the preliminary conducted simulations the function and operation conditions of the all parts were formulated.At the next steps, the detailed design of all the parts was conducted. Most components were ordered from respective companies. Some of the mechanical components were made in the workshop of the company. All parts of the Laser-testing rig were assembled and tested. Software part, which controls the Laser-testing rig work, was created on the LabVIEW basis. To tune and test software part the special simulator was designed and assembled.When all parts were assembled in the complete system, the Laser-testing rig was tested, calibrated and tuned.In the workshop of Absolicon AB, the trial measurements were conducted and Laser-testing rig was installed in the production line at the plant in Soleftea.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Test method for integrated solar- biomass systems - Long term prediction trough short term measurementsSP Technical Research Institute of Sweden and SERC, Dalarna University have in cooperation developed a test method for integrated solar and biomass systems. The test method is performed under six days including two summer days, two winter days and two spring/autumn days true to real weather conditions and loads for a single family house. The aim of the test method is to get information about a Combisystem’s annual performance and operation throughout a short term test. Seven different solar Combisystems have been tested within the project together with a pellet boiler without solar collectors. In addition to that a comparative testing has been performed at the two laboratories at SP and at SERC on the same Combisystem. The test method developed within the project has been proved to withstand the aim of the project, which is to be able to compare the performance between the systems. The test method is also suitable for identification of possible operation problems so they can be taken care of and consequently improves the system.The project and the system testing reveal that it is in general favorable to combine biomass pellets with solar heating. Pellet boilers has normally a low performance during the summer period but combined with a solar collector the boiler can be switch off during this period. There are however big differences in performance between the tested. The efficiency of the pellet boiler is highly dependent of the operating conditions and elements like heat losses from the system, system configuration and control strategy have great influence of the performance of the system and the emissions. On the other hand, the performance and the size of the solar collectors have a minor effect on the overall system performance. There is obviously a big potential for improvement of the system´s performance and the developed test method is an essential way to implement this perfection.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

A ventilation radiator is a combined ventilation and heat emission unit currently of interest due to its potential for increasing energy efficiency in exhaust ventilated buildings with warm water heating. This paper presents results of performance tests of several ventilation radiator models conducted under controlled laboratory conditions.   The purpose of the study was to validate results achieved by Computational Fluid Dynamics (CFD) in an earlier study and indentify possible improvements in the performance of such systems. The main focus was on heat transfer from internal convection fins, but comfort and health aspects related to ventilation rates and air temperatures were also considered.   The general results from the CFD simulations were confirmed; the heat output of ventilation radiators may be improved by at least 20 % without sacrificing ventilation efficiency or thermal comfort.   Improved thermal efficiency of ventilation radiators allows a lower supply water temperature and energy savings both for heating up and distribution of warm water in heat pumps or district heating systems. A secondary benefit is that a high ventilation rate can be maintained all year around without risk for cold draught.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

With the building sector accounting for around 40% of the total energy consumption in the EU, energy efficiency in buildings is and continues to be an important issue. Great progress has been made in reducing the energy consumption in new buildings, but the large stock of existing buildings with poor energy performance is probably an even more crucial area of focus. This thesis deals with energy efficiency measures that can be suitable for renovation of existing houses, particularly low-temperature heating systems and ventilation systems with heat recovery. The energy performance, environmental impact and costs are evaluated for a range of system combinations, for small and large houses with various heating demands and for different climates in Europe. The results were derived through simulation with energy calculation tools. Low-temperature heating and air heat recovery were both found to be promising with regard to increasing energy efficiency in European houses. These solutions proved particularly effective in Northern Europe as low-temperature heating and air heat recovery have a greater impact in cold climates and on houses with high heating demands. The performance of heat pumps, both with outdoor air and exhaust air, was seen to improve with low-temperature heating. The choice between an exhaust air heat pump and a ventilation system with heat recovery is likely to depend on case specific conditions, but both choices are more cost-effective and have a lower environmental impact than systems without heat recovery. The advantage of the heat pump is that it can be used all year round, given that it produces DHW. Economic and environmental aspects of energy efficiency measures do not always harmonize. On the one hand, lower costs can sometimes mean larger environmental impact; on the other hand there can be divergence between different environmental aspects. This makes it difficult to define financial subsidies to promote energy efficiency measures.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Accounting for around 40% of the total final energy consumption, the building stock is an important area of focus on the way to reaching the energy goals set for the European Union. The relatively small share of new buildings makes renovation of existing buildings possibly the most feasible way of improving the overall energy performance of the building stock. This of course involves improvements on the climate shell, for example by additional insulation or change of window glazing, but also installation of new heating systems, to increase the energy efficiency and to fit the new heat load after renovation. In the choice of systems for heating, ventilation and air conditioning (HVAC), it is important to consider their performance for space heating as well as for domestic hot water (DHW), especially for a renovated house where the DHW share of the total heating consumption is larger. The present study treats the retrofitting of a generic single family house, which was defined as a reference building in a European energy renovation project. Three HVAC retrofitting options were compared from a techno-economic point of view: A) Air-to-water heat pump (AWHP) and mechanical ventilation with heat recovery (MVHR), B) Exhaust air heat pump (EAHP) with low-temperature ventilation radiators, and C) Gas boiler and ventilation with MVHR. The systems were simulated for houses with two levels of heating demand and four different locations: Stockholm, Gdansk, Stuttgart and London. They were then evaluated by means of life cycle cost (LCC) and primary energy consumption. Dynamic simulations were done in TRNSYS 17. In most cases, system C with gas boiler and MVHR was found to be the cheapest retrofitting option from a life cycle perspective. The advantage over the heat pump systems was particularly clear for a house in Germany, due to the large discrepancy between national prices of natural gas and electricity. In Sweden, where the price difference is much smaller, the heat pump systems had almost as low or even lower life cycle costs than the gas boiler system. Considering the limited availability of natural gas in Sweden, systems A and B would be the better options. From a primary energy point of view system A was the best option throughout, while system B often had the highest primary energy consumption. The limited capacity of the EAHP forced it to use more auxiliary heating than the other systems did, which lowered its COP. The AWHP managed the DHW load better due to a higher capacity, but had a lower COP than the EAHP in space heating mode. Systems A and C were notably favoured by the air heat recovery, which significantly reduced the heating demand. It was also seen that the DHW share of the total heating consumption was, as expected, larger for the house with the lower space heating demand. This confirms the supposition that it is important to include DHW in the study of HVAC systems for retrofitting.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper uses examples from a Swedish study to suggest some ways in which cultural variation could be included in studies of thermal comfort. It is shown how only a slight shift of focus and methodological approach could help us discover aspects of human life that add to previous knowledge within comfort research of how human beings perceive and handle warmth and cold. It is concluded that it is not enough for buildings, heating systems and thermal control devices to be energy-efficient in a mere technical sense. If these are to help to decrease, rather than to increase, energy consumption, they have to support those parts of already existing habits and modes of thought that have the potential for low energy use. This is one reason why culture-specific features and emotional cores need to be investigated and deployed into the study and development of thermal comfort.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This article discusses some of the complexities of human decision-making. It aims, in particular, at relating the nature of decision-making to the illusory dichotomies of change and stability, individual actions and cultural sharing. Serving as an illustration to the discussion of the article is ongoing fieldwork in contexts of buying, selling and constructing pre-fabricated detached houses in the central Sweden, and the very specific question of how decisions to install one kind of heating-system rather than another come about. A common reductionism is to narrow down the understanding of decisions about heating systems and energy consumption to conscious choices made by individual householders. I have asked myself whether, on the contrary, anyone actually makes such decisions at all. Perhaps some of these decisions are merely outcomes of interaction between different individuals with their respective responsibilities and focuses of interest.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Low concentrator PV-T hybrid systems produce both electricity and thermal energy; this fact increases the overall efficiency of the system and reduces the cost of solar electricity. These systems use concentrators which are optical devices that concentrate sunlight on to solar cells and reduce expensive solar cell area. This thesis work deals with the thermal evaluation of a PV-T collector from Solarus.Firstly the thermal efficiency of the low concentrator collector was characterized for the thermal-collector without PV cells on the absorber. Only two types of paint were on the absorber, one for each trough of the collector. Both paints are black one is glossy and the other is dull,. The thermal efficiency at no temperature difference between collector and ambient for these two types of paint was 0.65 and 0.64 respectively; the U-value was 8.4 W/m2°C for the trough with the glossy type of paint and 8.6 W/m2°C for the trough with dull type of paint. The annual thermal output of these two paints was calculated for two different geographic locations, Casablanca, Morocco and Älvkarleby, Sweden.Secondly the thermal efficiency was defined for the PV-T collector with PV cells on the absorber. The PV cells cover 85% of the absorber, without any paint on the rest of the absorber area. We also tested how the electrical power output influences the thermal power output of the PV-T collector. The thermal and total performances for the PV-T collector were only characterized with reflector sides, because of the lack of time we could not characterize them with transparent sides also.