2 resultados para marine and estuarine mangroves

em CUNY Academic Works


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Natural riversare consisting of various networks as junction andstreams. And sediment and erosion are occurred by specific stream condition. When flood season,large discharge flew in the river and river bed changed by high flow velocity. Especially junction area’s flow characteristics are very complex. The purpose of this study is to analyze the flow characteristics in channel junction, which are most influenced by large discharge like flooding and input water from tributary. We investigate the flow characteristics by using hydrodynamics and transport module in MIKE 3 FM. MIKE 3 FM model was helpful tool to analysis 3D hydrodynamics, erosion and sediment effect from channel bed. We analyze flow characteristics at channel junction. Also we consider hydraulic structures like a bridge pier which is influencing flow characteristics like a flow velocity, water level, erosion and scour depth in channel bed. In the model, we controlled discharge condition according to Froude Number and reflect various grain diameter size and flow ratio change in main stream and tributary. In the result, flow velocity, water level, erosion and sediment depth are analyzed. Additionally, we suggest a these result relationship with equations. This study will help the understand flow characteristics and influence of hydraulic structure in channel junction. Acknowledgments This research was supported by a grant (12-TI-C01) from Advanced Water Management Research Program funded by Ministry of Land, Infrastructure and Transport of Korean government.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

A study of Muthalapozhy fishing harbour, located in south India, was conducted for simulating shoreline changes using LITPACK modelling tool. The analysis shows that the estimated advancement in shoreline is of the order of 45 m/year initially, which gradually reduces to 25 m/year. It was also found that the coastline advances more during the south-west monsoon (i.e. June to September) season. Simulation of breakwaters shows that the length of the breakwater should be increased by 200 m for south breakwater and 70 m for north breakwater to keep the channel operational without dredging till 2016. The results of the simulated shoreline will help the port managers for maintaining the channel round the year.