21 resultados para working practices

em CentAUR: Central Archive University of Reading - UK


Relevância:

70.00% 70.00%

Publicador:

Resumo:

Information technologies are used across all stages of the construction process, and are crucial in the delivery of large projects. Drawing on detailed research on a construction megaproject, we take a practice-based approach to examining the practical and theoretical tensions between existing ways of working and the introduction of new coordination tools in this paper. We analyze the new hybrid practices that emerge, using insights from actor-network theory to articulate the delegation of actions to material and digital objects within ecologies of practice. The three vignettes that we discuss highlight this delegation of actions, the “plugging” and “patching” of ecologies occurring across media and the continual iterations of working practices between different types of media. By shifting the focus from tools to these wider ecologies of practice, the approach has important managerial mplications for the stabilization of new technologies and practices and for managing technological change on large construction projects. We conclude with a discussion of new directions for research, oriented to further elaborating on the importance of the material in understanding change.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

The cost of tendering in the construction industry is widely suspected to be excessive, but there is little robust empirical evidence to demonstrate this. It also seems that innovative working practices may reduce the costs of undertaking construction projects and the consequent improvement in relationships should increase overall value for money. The aim of this proposed research project is to develop mechanisms for measuring the true costs of tendering based upon extensive in-house data collection undertaken in a range of different construction firms. The output from this research will enable all participants in the construction process to make better decisions about how to select members of the team and identify the price and scope of their obligations.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Recent developments in contracting practice in the UK have built upon recommendations contained in highprofile reports, such as those by Latham and Egan. However, the New Engineering Contract (NEC), endorsed by Latham, is based upon principles of contract drafting that seem open to question. Any contract operates in the context of its legislative environment and current working practices. This report identifies eight contentious hypotheses in the literature on construction contracts and tests their validity in a sample survey that attracted 190 responses. The survey shows, among other things, that while partnership is a positive and useful idea, authoritative contract management is considered more effective and that “win-win” contracts, while desirable, are basically impractical. Further, precision and fairness in contracts are not easy to achieve simultaneously. While participants should know what is in their contracts, they should not routinely resort to legal action; and standard-form contracts should not seek to be universally applicable. Fundamental changes to drafting policy should be undertaken within the context of current legal contract doctrine and with a sensitivity to the way that contracts are used in contemporary practice. Attitudes to construction contracting may seem to be changing on the surface, but detailed analysis of what lies behind apparent agreement on new ways of working reveals that attitudes are changing much more slowly than they appear to be.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

The commercial process in construction projects is an expensive and highly variable overhead. Collaborative working practices carry many benefits, which are widely disseminated, but little information is available about their costs. Transaction Cost Economics is a theoretical framework that seeks explanations for why there are firms and how the boundaries of firms are defined through the “make-or-buy” decision. However, it is not a framework that offers explanations for the relative costs of procuring construction projects in different ways. The idea that different methods of procurement will have characteristically different costs is tested by way of a survey. The relevance of transaction cost economics to the study of commercial costs in procurement is doubtful. The survey shows that collaborative working methods cost neither more nor less than traditional methods. But the benefits of collaboration mean that there is a great deal of enthusiasm for collaboration rather than competition.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

The role of users is an often-overlooked aspect of studies of innovation and diffusion. Using an actor-network theory (ANT) approach, four case studies examine the processes of implementing a piece of CAD (computer aided design) software, BSLink, in different organisations and describe the tailoring done by users to embed the software into working practices. This not only results in different practices of use at different locations, but also transforms BSLink itself into a proliferation of BSLinks-in-use. A focus group for BSLink users further reveals the gaps between different users' expectations and ways of using the software, and between different BSLinks-in-use. It also demonstrates the contradictory demands this places on its further development. The ANT-informed approach used treats both innovation and diffusion as processes of translation within networks. It also emphasises the political nature of innovation and implementation, and the efforts of various actors to delegate manoeuvres for increased influence onto technological artefacts.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Major construction clients are increasingly looking to procure built facilities on the basis of added value, rather than capital cost. Recent advances in the procurement of construction projects have emphasised a whole-life value approach to meeting the client’s objectives, with strategies put in place to encourage long-term commitment and through-life service provision. Construction firms are therefore increasingly required to take on responsibility for the operation and maintenance of the construction project on the client’s behalf - with the emphasis on value and service. This inevitably throws up a host of challenges, not the least of which is the need for construction firms to manage and accommodate the new emphasis on service. Indeed, these ‘service-led’ projects represent a new realm of construction projects where the rationale for the project is driven by client’s objectives with some aspect of service provision. This vision of downstream service delivery increases the number of stakeholders, adds to project complexity and challenges deeply-ingrained working practices. Ultimately it presents a major challenge for the construction sector. This paper sets out to unravel some of the many implications that this change brings with it. It draws upon ongoing research investigating how construction firms can adapt to a more service-orientated built environment and add value in project-based environments. The conclusions lay bare the challenges that firms face when trying to compete on the basis of added-value and service delivery. In particular, how it affects deeply-ingrained working practices and established relationships in the sector.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

The Private Finance Initiative (PFI) is frequently portrayed as a vehicle for change for the UK construction sector. Significant change in the working practices of construction companies is predicted as new business models based on whole-life value creation emerge. This paper shifts the focus of discussion from projected ideals and possible developments to the current situation. More specifically, it focuses on the challenges that large firms participating in both PFI and traditional markets face. The analysis focuses on the relations between business units and on day-to-day challenges to greater long-term commitment, through life-service provision and increased integration between construction and service provision. The paper offers insights into the effects of PFI on construction practice and their implications for theorizing on organizational and strategic change. It suggests abandoning a simplistic model of the centralized, homogenous firm and instead capturing the dynamics of decentralized, large firms working in multiple markets on a variety of projects. This would assist in the provision of more realistic and fruitful models of how to realize the PFI vision.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

It has been asserted that business reorganisation and new working practices are transforming the nature of demand for business space. Downsizing, delayering, business process reengineering and associated initiatives alter the amount, type and location of space required by firms. The literature has neglected the impact of real estate market structures on the ability of organisations to successfully implement these new organisational forms or contemporary working practices. Drawing from UK research, the paper demonstrates that, while new working practices are widespread, their impact on the corporate real estate portfolio is less dramatic than often supposed. In part, this is attributed to inflexibility in market structures which constrains the supply of appropriate space.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Local, tacit and normally unspoken OHS (occupational health and safety) knowledge and practices can too easily be excluded from or remain below the industry horizon of notice, meaning that they remain unaccounted for in formal OHS policy and practice. In this article we stress the need to more systematically and routinely tap into these otherwise ‘hidden’ communication channels, which are central to how everyday safe working practices are achieved. To demonstrate this approach this paper will draw on our ethnographic research with a gang of migrant curtain wall installers on a large office development project in the north of England. In doing so we reflect on the practice-based nature of learning and sharing OHS knowledge through examples of how workers’ own patterns of successful communication help avoid health and safety problems. These understandings, we argue, can be advanced as a basis for the development of improved OHS measures, and of organizational knowing and learning.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

The NeuroHub project aims to develop a research information system for neuroscientists at three different partner institutions: Oxford, Reading and Southampton. Each research group has different working practices, research methodologies and user requirements, which have lead to the development of a system that supports a wide variety of tasks in the neuroscience research life cycle. In this paper, we present how these user requirements have been translated in a research information environment that supports a community of over 70 researchers using the system for day-to-day research tasks.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Changes to client requirements are inevitable during construction. Industry discourse is concerned with minimizing and controlling changes. However, accounts of practices involved in making changes are rare. In response to calls for more research into working practices, an ethnographic study of a live hospital project was undertaken to explore how changes are made. A vignette of a meeting exploring the investigation of changes illustrates the issues. This represents an example from the ethnographic fieldwork, which produced many observations. There was a strong emphasis on using change management procedures contained within the contract to investigate changes, even when it was known that the change was not required. For the practitioners, this was a way of demonstrating best practice, transparent and accountable decision-making regarding changes. Hence, concerns for following procedures sometimes overshadowed considerations about whether or not a change was required to improve the functionality of the building. However, the procedures acted as boundary objects between the communities of practice involved on the project by coordinating the work of managing changes. Insights suggest how contract procedures facilitate and impede the making of changes, which can inform policy guidance and contract drafting.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

The financial crisis of 2008 led to new international regulatory controls for the governance, risk and compliance of financial services firms. Information systems play a critical role here as political, functional and social pressures may lead to the deinstitutionalization of existing structures, processes and practices. This research examines how an investment management system is introduced by a leading IT vendor across eight client sites in the post-crisis era. Using institutional theory, it examines changes in working practices occurring at the environmental and organizational levels and the ways in which technological interventions are used to apply disciplinary effects in order to prevent inappropriate behaviors. The results extend the constructs of deinstitutionalization and identify empirical predictors for the deinstitutionalization of compliance and trading practices within financial organizations.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

The UK government is mandating the use of building information modelling (BIM) in large public projects by 2016. As a result, engineering firms are faced with challenges related to embedding new technologies and associated working practices for the digital delivery of major infrastructure projects. Diffusion of innovations theory is used to investigate how digital innovations diffuse across complex firms. A contextualist approach is employed through an in-depth case study of a large, international engineering project-based firm. The analysis of the empirical data, which was collected over a four-year period of close interaction with the firm, reveals parallel paths of diffusion occurring across the firm, where both the innovation and the firm context were continually changing. The diffusion process is traced over three phases: centralization of technology management, standardization of digital working practices, and globalization of digital resources. The findings describe the diffusion of a digital innovation as multiple and partial within a complex social system during times of change and organizational uncertainty, thereby contributing to diffusion of innovations studies in construction by showing a range of activities and dynamics of a non-linear diffusion process.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Innovative, low carbon technologies are already available for use in the construction of buildings, but the impact of their specification on construction projects is unclear. This exploratory research identifies issues which arise following the specification of BIPV in non-residential construction projects. Rather than treating the inclusion of a new technology as a technical problem, the research explores the issue from a socio-technical perspective to understand the accommodations which the project team makes and their effect on the building and the technology. The paper is part of a larger research project which uses a Social Construction of Technology Approach (SCOT) to explore the accommodations made to working practices and design when Building Integrated PhotoVoltaic (BIPV) technology is introduced. The approach explores how the requirements of the technology from different groups of actors (Relevant Social Groups or RSG's) give rise to problems and create solutions. As such it rejects the notion of a rational linear view of innovation diffusion; instead it suggests that the variety and composition of the Relevant Social Groups set the agenda for problem solving and solutions as the project progresses. The research explores the experiences of three people who have extensive histories of involvement with BIPV in construction, looks at how SCOT can inform our understanding of the issues involved and identifies themes and issues in the specification of BIPV on construction projects. A key finding concerns the alignment of inflection points at which interviewees have found themselves changing from one RSG to another as new problems and solutions are identified. The points at which they change RSG often occurred at points which mirror conventional construction categories (in terms of project specification, tender, design and construction).

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This research examines dynamics associated with new representational technologies in complex organizations through a study of the use of a Single Model Environment, prototyping and simulation tools in the mega-project to construct Terminal 5 at Heathrow Airport, London. The ambition of the client, BAA. was to change industrial practices reducing project costs and time to delivery through new contractual arrangements and new digitally-enabled collaborative ways of working. The research highlights changes over time and addresses two areas of 'turbulence' in the use of: 1) technologies, where there is a dynamic tension between desires to constantly improve, change and update digital technologies and the need to standardise practices, maintaining and defending the overall integrity of the system; and 2) representations, where dynamics result from the responsibilities and liabilities associated with sharing of digital representations and a lack of trust in the validity of data from other firms. These dynamics are tracked across three stages of this well-managed and innovative project and indicate the generic need to treat digital infrastructure as an ongoing strategic issue.