23 resultados para tender

em CentAUR: Central Archive University of Reading - UK


Relevância:

20.00% 20.00%

Publicador:

Resumo:

In the tender process, contractors often rely on subcontract and supply enquiries to calculate their bid prices. However, this integral part of the bidding process is not empirically articulated in the literature. Over 30 published materials on the tendering process of contractors that talk about enquiries were reviewed and found to be based mainly on experiential knowledge rather than systematic evidence. The empirical research here helps to describe the process of enquiries precisely, improve it in practice, and have some basis to support it in theory. Using a live participant observation case study approach, the whole tender process was shadowed in the offices of two of the top 20 UK civil engineering construction firms. This helped to investigate 15 research questions on how contractors enquire and obtain prices from subcontractors and suppliers. Forty-three subcontract enquiries and 18 supply enquiries were made across two different projects with average value of 7m. An average of 15 subcontract packages and seven supply packages was involved. Thus, two or three subcontractors or suppliers were invited to bid in each package. All enquiries were formulated by the estimator, with occasional involvement of three other personnel. Most subcontract prices were received in an average of 14 working days; and supply prices took five days. The findings show 10 main activities involved in processing enquiries and their durations, as well as wasteful practices associated with enquiries. Contractors should limit their enquiry invitations to a maximum of three per package, and optimize the waiting time for quotations in order to improve cost efficiency.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Purpose – The purpose of this paper is to show the extent to which clients amend standard form contracts in practice, the locus of the amendments, and how contractors respond to the amendments when putting together a bid. Design/methodology/approach – Four live observational case studies were carried out in two of the top 20 UK construction firms. The whole process used to review the proposed terms and conditions of the contract was shadowed using participant observation, interview and documentary analysis. Findings – All four cases showed strong evidence of amendments relating mostly to payment and contractual aspects: 83 amendments in Case Study 1 (CS1), 80 in CS2, 15 in CS3 and 29 in CS4. This comprised clauses that were modified (37 per cent), substituted (23 per cent), deleted (7 per cent) and new additions (33 per cent). Risks inherent in the amendments were mostly addressed through contractual rather than price mechanisms, to reflect commercial imperatives. “Qualifications” and “clarifications” were included in the tender submissions for post-tender negotiations. Thus, the amendments did not necessarily influence price. There was no evidence of a “standard-form contract“ being used as such, although clients may draw on published “standard-form contracts” to derive the forms of contract actually used in practice. Practical implications – Contractors should pay attention to clauses relating to contractual and financial aspects when reviewing tender documents. Clients should draft equitable payment and contractual terms and conditions to reduce risk of dispute. Indeed, it is prudent for clients not to pass on inestimable risks. Originality/value – A better understanding of the extent and locus of amendments in standard form contracts, and how contractors respond, is provided.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Tendering is one of the stages in construction procurement that requires extensive information and documents exchange. However, tender documents are not always clear in practice. The aim of this study was to ascertain the clarity and adequacy of tender documents used in practice. Access was negotiated into two UK construction firms and the whole tender process for two projects was shadowed for 6-7 weeks in each firm using an ethnographic approach. A significant amount of tender queries, amendments and addenda were recorded. This showed that quality of tender documentation is still a problem in construction despite the existence of standards like Co-ordinated Project Information (1987) and British Standard 1192 (1984 and 1990) that are meant to help in producing clear and consistent project information. Poor quality tender documents are a source of inaccurate estimates, claims and disputes on contracts. Six recommendations are presented to help in improving the quality of tender documentation. Further research is needed into the recommendations to help improve the quality of tender documents, perhaps in conjunction with an industry-wide investigation into the level of incorporation of CPI principles in practice.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The process of how contractors take account of risk when calculating their bids for construction work is investigated based on preliminary investigations and case studies in Ghana and UK. Ghana and UK were chosen, more or less arbitrarily, for the purpose of case studies, and to test the idea that there are systematic differences between the approaches in different places. Clear differences were found in the risk pricing approaches of contractors in the two countries. The difference appeared to emanate from the professional knowledge and competence of the bid team members, company policy, corporate accountability and the business environments in which the contractors operate. Both groups of contractors take account of risk in estimates. However, risk accountability was found to be higher on the agenda in the tender process of UK contractors, documented more systematically, and assessed and managed more rigorously with input from the whole bid team. Risk accountability takes place at three levels of the tender process and is dictated strongly by market forces and company circumstances.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Formal and analytical risk models prescribe how risk should be incorporated in construction bids. However, the actual process of how contractors and their clients negotiate and agree on price is complex, and not clearly articulated in the literature. Using participant observation, the entire tender process was shadowed in two leading UK construction firms. This was compared to propositions in analytical models and significant differences were found. 670 hours of work observed in both firms revealed three stages of the bidding process. Bidding activities were categorized and their extent estimated as deskwork (32%), calculations (19%), meetings (14%), documents (13%), off-days (11%), conversations (7%), correspondence (3%) and travel (1%). Risk allowances of 1-2% were priced in some bids and three tiers of risk apportionment in bids were identified. However, priced risks may sometimes be excluded from the final bidding price to enhance competitiveness. Thus, although risk apportionment affects a contractor’s pricing strategy, other complex, microeconomic factors also affect price. Instead of pricing in contingencies, risk was priced mostly through contractual rather than price mechanisms, to reflect commercial imperatives. The findings explain why some assumptions underpinning analytical models may not be sustainable in practice and why what actually happens in practice is important for those who seek to model the pricing of construction bids.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

A range of funding schemes and policy instruments exist to effect enhancement of the landscapes and habitats of the UK. While a number of assessments of these mechanisms have been conducted, little research has been undertaken to compare both quantitatively and qualitatively their relative effectiveness across a range of criteria. It is argued that few tools are available for such a multi-faceted evaluation of effectiveness. A form of Multiple Criteria Decision Analysis (MCDA) is justified and utilized as a framework in which to evaluate the effectiveness of nine mechanisms in relation to the protection of existing areas of chalk grassland and the creation of new areas in the South Downs of England. These include established schemes, such as the Countryside Stewardship and Environmentally Sensitive Area Schemes, along with other less common mechanisms, for example, land purchase and tender schemes. The steps involved in applying an MCDA to evaluate such mechanisms are identified and the process is described. Quantitative results from the comparison of the effectiveness of different mechanisms are presented, although the broader aim of the paper is that of demonstrating the performance of MCDA as a tool for measuring the effectiveness of mechanisms aimed at landscape and habitat enhancement.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Identification of cost-determinant variables and evaluation of their degree of influence play an essential role in building reliable cost models and enhance the competitive edge of quantity surveyors as well as contracting organisations. Sixty-seven variables affecting pre-tender construction cost estimates are identified through literature and interviews. These factors are grouped into six categories and a comparison analysis of their impact is conducted. Priority ranking of cost-influencing factors is carried out using a questionnaire survey commissioned amongst quantity surveyors based in the UK. Findings of this survey indicate that there is a strong agreement between quantity surveyors in ranking cost-influencing factors of construction projects. Comparisons between the outcomes of this research and other related studies are presented.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Competitive Dialogue (CD) is a new contract award procedure of the European Community (EC). It is set out in Article 29 of the 'Public Sector Directive' 2004/18/EC. Over the last decades, projects were becoming more and more complex, and the existing EC procedures were no longer suitable to procure those projects. The call for a new procedure resulted in CD. This paper describes how the Directive has been implemented into the laws of two member states: the UK and the Netherlands. In order to implement the Directive, both lawmakers have set up a new and distinct piece of legislation. In each case, large parts of the Directive’s content have been repeated ‘word for word’; only minor parts have been reworded and/or restructured. In the next part of the paper, the CD procedure is examined in different respects. First, an overview is given on the different EC contract award procedures (open, restricted, negotiated, CD) and awarding methods (lowest price and Most Economically Advantageous Tender, MEAT). Second, the applicability of CD is described: Among other limitations, CD can only be applied to public contracts for works, supplies, and services, and this scope of application is further restricted by the exclusion of certain contract types. One such exclusion concerns services concessions. This means that PPP contracts which are set up as services concessions cannot be awarded by CD. The last two parts of the paper pertain to the main features of the CD procedure – from ‘contract notice’ to ‘contract award’ – and the advantages and disadvantages of the procedure. One advantage is that the dialogue allows the complexity of the project to be disentangled and clarified. Other advantages are the stimulation of innovation and creativity. These advantages are set against the procedure’s disadvantages, which include high transaction costs and a perceived hindrance of innovation (due to an ambiguity between transparency and fair competition). It is concluded that all advantages and disadvantages are related to one of three elements: communication, competition, and/or structure of the procedure. Further research is needed to find out how these elements are related.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Formal and analytical models that contractors can use to assess and price project risk at the tender stage have proliferated in recent years. However, they are rarely used in practice. Introducing more models would, therefore, not necessarily help. A better understanding is needed of how contractors arrive at a bid price in practice, and how, and in what circumstances, risk apportionment actually influences pricing levels. More than 60 proposed risk models for contractors that are published in journals were examined and classified. Then exploratory interviews with five UK contractors and documentary analyses on how contractors price work generally and risk specifically were carried out to help in comparing the propositions from the literature to what contractors actually do. No comprehensive literature on the real bidding processes used in practice was found, and there is no evidence that pricing is systematic. Hence, systematic risk and pricing models for contractors may have no justifiable basis. Contractors process their bids through certain tendering gateways. They acknowledge the risk that they should price. However, the final settlement depends on a set of complex, micro-economic factors. Hence, risk accountability may be smaller than its true cost to the contractor. Risk apportionment occurs at three stages of the whole bid-pricing process. However, analytical approaches tend not to incorporate this, although they could.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Lipid oxidation leads to meat spoilage and has been reported to cause adverse changes in the flavour and texture of poultry meat. Vitamin E has been found to be effective in delaying lipid oxidation. The aim of this study was to determine whether the vitamin E supplementation of chicken feed influences the consumers' perception of the quality of chicken meat under normal display and storage conditions. Untrained consumers (n 32) evaluated cooked breast meat from chickens (both corn fed and wheat fed) supplemented with 75 250 or 500 mg/kg vitamin E and after storage at 4° C for 4 and 7 d. Factorial analysis found an interaction between vitamin E treatment and storage day upon the perceived juiciness (P = 0.023) and tenderness (P = 0.041) of the chicken meat. Perceptions of quality relative to vitamin E level were more evident on day 4 than day 7. When the two cereal types were compared, the time-related subgroup effects were observed only in meat from corn-fed chickens supplemented with either 75 or 250 mg/kg, which was perceived to be juicier (P = 0.018) and more tender (P = 0.020) than that supplemented at the 500 mg/kg level. These results imply that the two lower concentrations of vitamin E have some advantages over 500 mg/kg, but for optimal consumer acceptance of corn-fed chicken meat, we suggest that 250 mg/kg vitamin E should be added to corn-fed poultry feed. There was no evidence to suggest any advantages in changing the current amount of vitamin E (75 mg/kg) used to rear wheat-fed birds.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

A case study on the tendering process and cost/time performance of a public building project in Ghana is conducted. Competitive bids submitted by five contractors for the project, in which contractors were required to prepare their own quantities, were analyzed to compare differences in their pricing levels and risk/requirement perceptions. Queries sent to the consultants at the tender stage were also analyzed to identify the significant areas of concern to contractors in relation to the tender documentation. The five bidding prices were significantly different. The queries submitted for clarifications were significantly different, although a few were similar. Using a before-and-after experiment, the expected cost/time estimate at the start of the project was compared to the actual cost/time values, i.e. what happened in the actual construction phase. The analysis showed that the project exceeded its expected cost by 18% and its planned time by 210%. Variations and inadequate design were the major reasons. Following an exploration of these issues, an alternative tendering mechanism is recommended to clients. A shift away from the conventional approach of awarding work based on price, and serious consideration of alternative procurement routes can help clients in Ghana obtain better value for money on their projects.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Sirens used by police, fire and paramedic vehicles have been designed so that they can be heard over large distances, but unfortunately the siren noise enters the vehicle and corrupts intelligibility of voice communications from the emergency vehicle to the control room. Often the siren needs to be turned off to enable the control room to hear what is being said. This paper discusses a siren noise filter system that is capable of removing the siren noise picked up by the two-way radio microphone inside the vehicle. The removal of the siren noise improves the response time for emergency vehicles and thus save lives. To date, the system has been trialed within a fire tender in a non-emergency situation, with good results.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Researchers often experience difficulties with the negotiation of access into firms for the purpose of data collection. The question we explore is: What are the main obstacles associated with access negotiation into firms; and what strategies do researchers employ to increase their chances of success? Our research work on the tendering process of contractors took place between 2006 and 2008. We successfully negotiated access into four firms (two each in Ghana and the UK) to observe live examples of tender preparation The techniques we employed in negotiating access were personal contacts, contacting firms through online details and professional institutions, etc. With all of this effort, our average success rate was less than 5 per cent. The main obstacles encountered were firms’ reluctance because of commercial sensitiveness and fear that the data could eventually be divulged to their competitors or end up in the public domain. However, some firms agreed mainly because of the written assurances of confidentiality and anonymity in reporting the study; reputation of the researchers’ academic institution; gatekeepers who spoke to their colleagues on our behalf; academic purpose of the study; and a feedback report which was promised in return for access to the case studies. Although the access through personal contacts is by far the easiest, it is not always possible. Researchers can approach firms as complete strangers, especially in a foreign country, and that could make the firms more likely to assist the research.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Innovative, low carbon technologies are already available for use in the construction of buildings, but the impact of their specification on construction projects is unclear. This exploratory research identifies issues which arise following the specification of BIPV in non-residential construction projects. Rather than treating the inclusion of a new technology as a technical problem, the research explores the issue from a socio-technical perspective to understand the accommodations which the project team makes and their effect on the building and the technology. The paper is part of a larger research project which uses a Social Construction of Technology Approach (SCOT) to explore the accommodations made to working practices and design when Building Integrated PhotoVoltaic (BIPV) technology is introduced. The approach explores how the requirements of the technology from different groups of actors (Relevant Social Groups or RSG's) give rise to problems and create solutions. As such it rejects the notion of a rational linear view of innovation diffusion; instead it suggests that the variety and composition of the Relevant Social Groups set the agenda for problem solving and solutions as the project progresses. The research explores the experiences of three people who have extensive histories of involvement with BIPV in construction, looks at how SCOT can inform our understanding of the issues involved and identifies themes and issues in the specification of BIPV on construction projects. A key finding concerns the alignment of inflection points at which interviewees have found themselves changing from one RSG to another as new problems and solutions are identified. The points at which they change RSG often occurred at points which mirror conventional construction categories (in terms of project specification, tender, design and construction).

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The present work describes a new tool that helps bidders improve their competitive bidding strategies. This new tool consists of an easy-to-use graphical tool that allows the use of more complex decision analysis tools in the field of Competitive Bidding. The graphic tool described here tries to move away from previous bidding models which attempt to describe the result of an auction or a tender process by means of studying each possible bidder with probability density functions. As an illustration, the tool is applied to three practical cases. Theoretical and practical conclusions on the great potential breadth of application of the tool are also presented.