37 resultados para supply chain competion
em CentAUR: Central Archive University of Reading - UK
Resumo:
There is a clear need for financial protection in the construction industry, both to guarantee satisfactory completion of construction projects and to guard against non-payment. However, the cost of financial protection is often felt to be disproportionately high, with unnecessary overlap between different measures. The Reading Construction Forum has commissioned and steered research which is published in this report in an effort to bring the problem out into the open and to clarify the various options open to the various parties and stakeholders in the construction process. "Financial Protection in the UK Building Industry" is the first definitive report on the subject, offering an accurate and simple guide that all levels within the construction industry can understand. This accessible new guide considers the problem of financial protection and clearly lays out the alternative solutions.It looks by turn at the client, the main contractor, and the sub-contractor, discussing which financial protection options are available to each of them, and considers the pros and cons of each option. The cost of each type of financial protection is weighed against the amount of protection provided and the risks involved. The book concludes with guidance for consultants, emphasising relevant points to consider when advising clients and contractors about which type of financial protection to choose. "Financial Protection in the UK Building Industry" was researched by a literature search, collection of statistical data, and financial data, as well as discussions with clients, contractors, sub-contractors and consultants. This investigation has shown that the direct costs of implementing financial protection measures are marginal, and that wider adoption of payment protection would create a more equitable situation between contracting parties.This guide will enable anyone in the construction industry to consider all the options, and determine what is the best solution for them. "Reading Construction Forum Financial Protection for the UK Building Industry" was complied by the University of Reading, funded by the Reading Construction Forum. The Forum has recently commissioned and steered a number of high-profile reports covering important aspects of the construction industry. Members of the Forum include major companies which are concerned with achieving high quality in the design, construction and use of commercial, retail and industrial buildings. All are committed to change and innovation in the British and European construction industries.
Resumo:
Construction materials and equipment are essential building blocks of every construction project and may account for 50-60 per cent of the total cost of construction. The rate of their utilization, on the other hand, is the element that most directly relates to a project progress. A growing concern in the industry that inadequate efficiency hinders its success could thus be accommodated by turning construction into a logistic process. Although mostly limited, recent attempts and studies show that Radio Frequency IDentification (RFID) applications have significant potentials in construction. However, the aim of this research is to show that the technology itself should not only be used for automation and tracking to overcome the supply chain complexity but also as a tool to generate, record and exchange process-related knowledge among the supply chain stakeholders. This would enable all involved parties to identify and understand consequences of any forthcoming difficulties and react accordingly before they cause major disruptions in the construction process. In order to achieve this aim the study focuses on a number of methods. First of all it develops a generic understanding of how RFID technology has been used in logistic processes in industrial supply chain management. Secondly, it investigates recent applications of RFID as an information and communication technology support facility in construction logistics for the management of construction supply chain. Based on these the study develops an improved concept of a construction logistics architecture that explicitly relies on integrating RFID with the Global Positioning System (GPS). The developed conceptual model architecture shows that categorisation provided through RFID and traceability as a result of RFID/GPS integration could be used as a tool to identify, record and share potential problems and thus vastly improve knowledge management processes within the entire supply chain. The findings thus clearly show a need for future research in this area.
Resumo:
Current recipes for learning across business sectors too often fail to recognize the embedded and contextual nature of management practice. The existing literature gives little emphasis to the symbiotic relationship between supply chain management and the broader dynamics of context. The aerospace and construction sectors are selected for comparison on the basis that they are so different. The UK aerospace sector has undergone extensive consolidation as a result of the imperatives of global competitive pressures. In contrast, the construction industry has experienced decades of fragmentation and remains highly localized. An increasing proportion of output in the aerospace sector occurs within a small number of large, globally orientated firms. In contrast, construction output is dominated by a plethora of small firms with high levels of subcontracting and a widespread reliance on self-employment. These differences have fundamental implications for the way that supply chain management is understood and implemented in the two sectors. Semi-structured interviews with practitioners from both sectors support the contention that supply chain management is more established in aerospace than construction. The introduction of prime contracting and the increasing use of framework agreements within the construction sector potentially provide a much more supportive climate for supply chain management than has traditionally prevailed. However, progress depends upon an improved continuity of workload under such arrangements.
Resumo:
The construction industry has incurred a considerable amount of waste as a result of poor logistics supply chain network management. Therefore, managing logistics in the construction industry is critical. An effective logistic system ensures delivery of the right products and services to the right players at the right time while minimising costs and rewarding all sectors based on value added to the supply chain. This paper reports on an on-going research study on the concept of context-aware services delivery in the construction project supply chain logistics. As part of the emerging wireless technologies, an Intelligent Wireless Web (IWW) using context-aware computing capability represents the next generation ICT application to construction-logistics management. This intelligent system has the potential of serving and improving the construction logistics through access to context-specific data, information and services. Existing mobile communication deployments in the construction industry rely on static modes of information delivery and do not take into account the worker’s changing context and dynamic project conditions. The major problems in these applications are lack of context-specificity in the distribution of information, services and other project resources, and lack of cohesion with the existing desktop based ICT infrastructure. The research works focus on identifying the context dimension such as user context, environmental context and project context, selection of technologies to capture context-parameters such wireless sensors and RFID, selection of supporting technologies such as wireless communication, Semantic Web, Web Services, agents, etc. The process of integration of Context-Aware Computing and Web-Services to facilitate the creation of intelligent collaboration environment for managing construction logistics will take into account all the necessary critical parameters such as storage, transportation, distribution, assembly, etc. within off and on-site project.
Resumo:
Glucosinolates (GLSs) are found in Brassica vegetables. Examples of these sources include cabbage, Brussels sprouts, broccoli, cauliflower and various root vegetables (e.g. radish and turnip). A number of epidemiological studies have identified an inverse association between consumption of these vegetables and the risk of colon and rectal cancer. Animal studies have shown changes in enzyme activities and DNA damage resulting from consumption of Brassica vegetables or isothiocyanates, the breakdown products (BDP) of GLSs in the body. Mechanistic studies have begun to identify the ways in which the compounds may exert their protective action but the relevance of these studies to protective effects in the human alimentary tract is as yet unproven. In vitro studies with a number of specific isothiocyanates have suggested mechanisms that might be the basis of their chemoprotective effects. The concentration and composition of the GLSs in different plants, but also within a plant (e.g. in the seeds, roots or leaves), can vary greatly and also changes during plant development. Furthermore, the effects of various factors in the supply chain of Brassica vegetables including breeding, cultivation, storage and processing on intake and bioavailability of GLSs are extensively discussed in this paper.
Resumo:
This paper discusses the problems inherent within traditional supply chain management's forecast and inventory management processes arising when tackling demand driven supply chain. A demand driven supply chain management architecture developed by Orchestr8 Ltd., U.K. is described to demonstrate its advantages over traditional supply chain management. Within this architecture, a metrics reporting system is designed by adopting business intelligence technology that supports users for decision making and planning supply activities over supply chain health.