27 resultados para successful building projects

em CentAUR: Central Archive University of Reading - UK


Relevância:

100.00% 100.00%

Publicador:

Resumo:

The principles of organization theory are applied to the organization of construction projects. This is done by proposing a framework for modelling the whole process of building procurement. This consists of a framework for describing the environments within which construction projects take place. This is followed by the development of a series of hypotheses about the organizational structure of construction projects. Four case studies are undertaken, and the extent to which their organizational structure matches the model is compared to the level of success achieved by each project. To this end there is a systematic method for evaluating the success of building project organizations, because any conclusions about the adequacy of a particular organization must be related to the degree of success achieved by that organization. In order to test these hypotheses, a mapping technique is developed. The technique offered is a development of a technique known as Linear Responsibility Analysis, and is called "3R analysis" as it deals with roles, responsibilities and relationships. The analysis of the case studies shows that they tended to suffer due to inappropriate organizational structure. One of the prevailing problems of public sector organization is that organizational structures are inadequately defined, and too cumbersome to respond to environmental demands on the project. The projects tended to be organized as rigid hierarchies, particularly at decision points, when what was required was a more flexible, dynamic and responsive organization. The study concludes with a series of recommendations; including suggestions for increasing the responsiveness of construction project organizations, and reducing the lead-in times for the inception periods.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Current approaches for the reduction of carbon emissions in buildings are often predicated on the integration of renewable technologies into building projects. Building integrated photovoltaics (BIPV) is one of these technologies and brings its own set of challenges and problems with a resulting mutual articulation of this technology and the building. A Social Construction of Technology (SCOT) approach explores how negotiations between informal groups of project actors with shared interests shape the ongoing specification of both BIPV and the building. Six main groups with different interests were found to be involved in the introduction of BIPV (Cost Watchers, Design Aesthetes, Green Guardians, Design Optimizers, Generation Maximizers and Users). Their involvement around three sets of issues (design changes from lack of familiarity with the technology, misunderstandings from unfamiliar interdependencies of trades and the effects of standard firm procedure) is followed. Findings underline how BIPV requires a level of integration that typically spans different work packages and how standard contractual structures inhibit the smooth incorporation of BIPV. Successful implementation is marked by ongoing (re-)design of both the building and the technology as informal fluid groups of project actors with shared interests address the succession of problems which arise in the process of implementation.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

One of the aims of a broad ethnographic study into how the apportionment of risk influences pricing levels of contactors was to ascertain the significant risks affecting contractors in Ghana, and their impact on prices. To do this, in the context of contractors, the difference between expected and realized return on a project is the key dependent variable examined using documentary analyses and semi-structured interviews. Most work in this has focused on identifying and prioritising risks using relative importance indices generated from the analysis of questionnaire survey responses. However, this approach may be argued to constitute perceptions rather than direct measures of the project risk. Here, instead, project risk is investigated by examining two measures of the same quantity; one ‘before’ and one ‘after’ construction of a project has taken place. Risks events are identified by ascertaining the independent variables causing deviations between expected and actual rates of return. Risk impact is then measured by ascertaining additions or reductions to expected costs due to the occurrence of risk events. So far, data from eight substantially complete building projects indicates that consultants’ inefficiency, payment delays, subcontractor-related problems and changes in macroeconomic factors are significant risks affecting contractors in Ghana.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Innovative, low carbon technologies are already available for use in the construction of buildings, but the impact of their specification on construction projects is unclear. This exploratory research identifies issues which arise following the specification of BIPV in non-residential construction projects. Rather than treating the inclusion of a new technology as a technical problem, the research explores the issue from a socio-technical perspective to understand the accommodations which the project team makes and their effect on the building and the technology. The paper is part of a larger research project which uses a Social Construction of Technology Approach (SCOT) to explore the accommodations made to working practices and design when Building Integrated PhotoVoltaic (BIPV) technology is introduced. The approach explores how the requirements of the technology from different groups of actors (Relevant Social Groups or RSG's) give rise to problems and create solutions. As such it rejects the notion of a rational linear view of innovation diffusion; instead it suggests that the variety and composition of the Relevant Social Groups set the agenda for problem solving and solutions as the project progresses. The research explores the experiences of three people who have extensive histories of involvement with BIPV in construction, looks at how SCOT can inform our understanding of the issues involved and identifies themes and issues in the specification of BIPV on construction projects. A key finding concerns the alignment of inflection points at which interviewees have found themselves changing from one RSG to another as new problems and solutions are identified. The points at which they change RSG often occurred at points which mirror conventional construction categories (in terms of project specification, tender, design and construction).

Relevância:

30.00% 30.00%

Publicador:

Resumo:

There is a clear need for financial protection in the construction industry, both to guarantee satisfactory completion of construction projects and to guard against non-payment. However, the cost of financial protection is often felt to be disproportionately high, with unnecessary overlap between different measures. The Reading Construction Forum has commissioned and steered research which is published in this report in an effort to bring the problem out into the open and to clarify the various options open to the various parties and stakeholders in the construction process. "Financial Protection in the UK Building Industry" is the first definitive report on the subject, offering an accurate and simple guide that all levels within the construction industry can understand. This accessible new guide considers the problem of financial protection and clearly lays out the alternative solutions.It looks by turn at the client, the main contractor, and the sub-contractor, discussing which financial protection options are available to each of them, and considers the pros and cons of each option. The cost of each type of financial protection is weighed against the amount of protection provided and the risks involved. The book concludes with guidance for consultants, emphasising relevant points to consider when advising clients and contractors about which type of financial protection to choose. "Financial Protection in the UK Building Industry" was researched by a literature search, collection of statistical data, and financial data, as well as discussions with clients, contractors, sub-contractors and consultants. This investigation has shown that the direct costs of implementing financial protection measures are marginal, and that wider adoption of payment protection would create a more equitable situation between contracting parties.This guide will enable anyone in the construction industry to consider all the options, and determine what is the best solution for them. "Reading Construction Forum Financial Protection for the UK Building Industry" was complied by the University of Reading, funded by the Reading Construction Forum. The Forum has recently commissioned and steered a number of high-profile reports covering important aspects of the construction industry. Members of the Forum include major companies which are concerned with achieving high quality in the design, construction and use of commercial, retail and industrial buildings. All are committed to change and innovation in the British and European construction industries.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

We have developed a model that allows players in the building and construction sector and the energy policy makers on energy strategies to be able to perceive the interest of investors in the kingdom of Bahrain in conducting Building Integrated Photovoltaic (BIPV) or Building integrated wind turbines (BIWT) projects, i.e. a partial sustainable or green buildings. The model allows the calculation of the Sustainable building index (SBI), which ranges from 0.1 (lowest) to 1.0 (highest); the higher figure the more chance for launching BIPV or BIWT. This model was tested in Bahrain and the calculated SBI was found 0.47. This means that an extensive effort must be made through policies on renewable energy, renewable energy education, and incentives to BIPV and BIWT projects, environmental awareness and promotion to clean and sustainable energy for building and construction projects. Our model can be used internationally to create a "Global SBI" database. The Sustainable building and construction initiative (SBCI), United Nation, can take the task for establishing such task using this model.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Modern buildings are designed to enhance the match between environment, spaces and the people carrying out work, so that the well-being and the performance of the occupants are all in harmony. Building services are systems that facilitate a healthy working environment within which workers productivity can be optimised in the buildings. However, the maintenance of these services is fraught with problems that may contribute to up to 50% of the total life cycle cost of the building. Maintenance support is one area which is not usually designed into the system as this is not common practice in the services industry. The other areas of shortfall for future designs are; client requirements, commissioning, facilities management data and post occupancy evaluation feedback which needs to be adequately planned to capture and document this information for use in future designs. At the University of Reading an integrated approach has been developed to assemble the multitude of aspects inherent in this field. The means records required and measured achievements for the benefit of both building owners and practitioners. This integrated approach can be represented in a Through Life Business Model (TLBM) format using the concept of Integrated Logistic Support (ILS). The prototype TLBM developed utilises the tailored tools and techniques of ILS for building services. This TLBM approach will facilitate the successful development of a databank that would be invaluable in capturing essential data (e.g. reliability of components) for enhancing future building services designs, life cycle costing and decision making by practitioners, in particular facilities managers.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Many nations are experiencing rapid rises in the life expectancy of their citizens. The implications of this major demographic shift are considerable offering opportunities as well as challenges to reconsider how people should spend their later years. A key task is enhancing the quality of life of older people through enabling them to continue to live independently even though illness, accident or frailty may have severely reduced their physical and sensory abilities and, possibly, mental health. Yet the needs of older people and disabled people have been largely ignored in the design of everyday consumer products, the home, transport systems and the built environment in general. Whilst the need for designers, engineers and technologists to provide products, environments and systems which are inclusive of all members of society is widely accepted, there is little understanding of how this can be achieved. In 1998 the UK Engineering and Physical Sciences Research Council established its EQUAL Initiative. This has encouraged design, engineering and technology researchers in universities to join with their colleagues from the social, medical and health sciences to investigate a wide range of issues experienced by older and disabled people and to propose solutions. Their research, which directly involves older and disabled people and, for example, social housing providers, social services departments, charities, engineering and architectural consultants, and transport firms, has been extremely successful. In a very short time it has influenced government policy on housing, long-term care, and building standards, and findings have been taken up by architects, designers, health-care professionals and bodies which represent older and disabled people.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Since 1997, EQUAL has supported over forty ageing and disability-related research projects, many of which demonstrating an inclusive design dimension. Some of these projects have had a significant influence on policy and practice. However, less progress has been made in promoting ageing-related research in scientific areas. Building on the experience gained in developing the inclusive design research community, SPARC was created with the aim to provide opportunities for introducing newcomers across a wide range of engineering and biological fields to ageing and disability-related research. Through an awards scheme, SPARC provides financial support, mentoring, editorial assistance and a platform for dissemination and access to international activities. In addition, SPARC organises national and international workshops that showcase the latest research and educates individuals, society and government about the value of ageing and disability-related research.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The UK industry has been criticised for being slow to adopt construction process innovations. Research shows that the idiosyncrasies of participants, their roles in the system and the contextual differences between sections of the industry make this a highly complex problem. There is considerable evidence that informal social networks play a key role in diffusion of innovations. The aim is to identify informal communication networks of project participants and the role these play in the diffusion of construction innovations. The characteristics of this network will be analysed in order to understand how they can be used to accelerate innovation diffusion within and between projects. Social Network Analysis is used to determine informal communication routes. Control and experiment case study projects are used within two different organizations. This allows informal communication routes concerning innovations to be mapped, whilst testing if the informal routes can facilitate diffusion. Analysis will focus upon understanding the combination of informal strong and weak ties, and how these impede or facilitate the diffusion of the innovation. Initial work suggests the presence of an informal communication network. Actors within this informal network, and the organization's management are unaware of its' existence and their informal roles within it. Thus, the network remains an untapped medium regarding innovation diffusion. It is proposed that successful innovation diffusion is dependent upon understanding informal strong and weak ties, at project, organization and industry level.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

A case study on the tendering process and cost/time performance of a public building project in Ghana is conducted. Competitive bids submitted by five contractors for the project, in which contractors were required to prepare their own quantities, were analyzed to compare differences in their pricing levels and risk/requirement perceptions. Queries sent to the consultants at the tender stage were also analyzed to identify the significant areas of concern to contractors in relation to the tender documentation. The five bidding prices were significantly different. The queries submitted for clarifications were significantly different, although a few were similar. Using a before-and-after experiment, the expected cost/time estimate at the start of the project was compared to the actual cost/time values, i.e. what happened in the actual construction phase. The analysis showed that the project exceeded its expected cost by 18% and its planned time by 210%. Variations and inadequate design were the major reasons. Following an exploration of these issues, an alternative tendering mechanism is recommended to clients. A shift away from the conventional approach of awarding work based on price, and serious consideration of alternative procurement routes can help clients in Ghana obtain better value for money on their projects.