In developing techniques for monitoring the costs associated with different procurement routes, the central task is disentangling the various project costs incurred by organizations taking part in construction projects. While all firms are familiar with the need to analyse their own costs, it is unusual to apply the same kind of analysis to projects. The purpose of this research is to examine the claims that new ways of working such as strategic alliancing and partnering bring positive business benefits. This requires that costs associated with marketing, estimating, pricing, negotiation of terms, monitoring of performance and enforcement of contract are collected for a cross-section of projects under differing arrangements, and from those in the supply chain from clients to consultants, contractors, sub-contractors and suppliers. Collaboration with industrial partners forms the basis for developing a research instrument, based on time sheets, which will be relevant for all those taking part in the work. The signs are that costs associated with tendering are highly variable, 1-15%, depending upon what precisely is taken into account. The research to date reveals that there are mechanisms for measuring the costs of transactions and these will generate useful data for subsequent analysis.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

In developing techniques for monitoring the costs associated with different procurement routes, the central task is disentangling the various project costs incurred by organizations taking part in construction projects. While all firms are familiar with the need to analyse their own costs, it is unusual to apply the same kind of analysis to projects. The purpose of this research is to examine the claims that new, ways of working such as strategic alliancing and partnering bring positive business benefits. This requires that costs associated with marketing, estimating, pricing, negotiation of terms, monitoring of performance and enforcement of contract are collected for a cross-section of projects under differing arrangements, and from those in the supply, chain from clients to consultants, contractors, subcontractors and suppliers. Collaboration with industrial partners forms the basis for developing a research instrument, bused on time sheets, which will be relevant for all those taking part in the work. The signs are that costs associated with,with tendering are highly variable, 1-15%, depending upon what precisely, is taken into account. The research to date reveals that there are mechanisms for measuring the costs of transactions and these will generate useful data for subsequent analysis.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

There is limited understanding of the role of services in the wave of globalisation and how the strengths of the UK service sector help to respond to the challenge of global competition. The way in which the construction export data are collected does not reflect the impact of globalisation and the changes in the construction business environment, such as increasing foreign ownership, foreign affiliates, and changing forms of procurement. The paper describes construction service exports, how they are collected and classified, highlighting the challenges of recording the export performance of construction services in a changing world. A case for change is made to ensure the collection of statistics better reflects the role of construction professional services

Relevância:

20.00% 20.00%

Publicador:

Resumo:

We describe a remote sensing method for measuring the internal interface height field in a rotating, two-layer annulus laboratory experiment. The method is non-invasive, avoiding the possibility of an interaction between the flow and the measurement device. The height fields retrieved are accurate and highly resolved in both space and time. The technique is based on a flow visualization method developed by previous workers, and relies upon the optical rotation properties of the working liquids. The previous methods returned only qualitative interface maps, however. In the present study, a technique is developed for deriving quantitative maps by calibrating height against the colour fields registered by a camera which views the flow from above. We use a layer-wise torque balance analysis to determine the equilibrium interface height field analytically, in order to derive the calibration curves. With the current system, viewing an annulus of outer radius 125 mm and depth 250 mm from a distance of 2 m, the inferred height fields have horizontal, vertical and temporal resolutions of up to 0.2 mm, 1 mm and 0.04 s, respectively.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

While the standard models of concentration addition and independent action predict overall toxicity of multicomponent mixtures reasonably, interactions may limit the predictive capability when a few compounds dominate a mixture. This study was conducted to test if statistically significant systematic deviations from concentration addition (i.e. synergism/antagonism, dose ratio- or dose level-dependency) occur when two taxonomically unrelated species, the earthworm Eisenia fetida and the nematode Caenorhabditis elegans were exposed to a full range of mixtures of the similar acting neonicotinoid pesticides imidacloprid and thiacloprid. The effect of the mixtures on C. elegans was described significantly better (p<0.01) by a dose level-dependent deviation from the concentration addition model than by the reference model alone, while the reference model description of the effects on E. fetida could not be significantly improved. These results highlight that deviations from concentration addition are possible even with similar acting compounds, but that the nature of such deviations are species dependent. For improving ecological risk assessment of simple mixtures, this implies that the concentration addition model may need to be used in a probabilistic context, rather than in its traditional deterministic manner. Crown Copyright (C) 2008 Published by Elsevier Inc. All rights reserved.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Root characteristics of seedlings of five different barley genotypes were analysed in 2D using gel chambers, and in 3D using soil sacs that were destructively harvested and pots of soil that were assessed non-invasively using X-ray microtomography. After 5 days, Chime produced the greatest number of root axes (similar to 6) and Mehola significantly less (similar to 4) in all growing methods. Total root length was longest in GSH01915 and shortest in Mehola for all methods, but both total length and average root diameter were significantly larger for plants grown in gel chambers than those grown in soil. The ranking of particular growth traits (root number, root angular spread) of plants grown in gel plates, soil sacs and X-ray pots was similar, but plants grown in the gel chambers had a different order of ranking for root length to the soil-grown plants. Analysis of angles in soil-grown plants showed that Tadmore had the most even spread of individual roots and Chime had a propensity for non-uniform distribution and root clumping. The roots of Mehola were less well spread than the barley cultivars supporting the suggestion that wild and landrace barleys tend to have a narrower angular spread than modern cultivars. The three dimensional analysis of root systems carried out in this study provides insights into the limitations of screening methods for root traits and useful data for modelling root architecture.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Pressing global environmental problems highlight the need to develop tools to measure progress towards "sustainability." However, some argue that any such attempt inevitably reflects the views of those creating such tools and only produce highly contested notions of "reality." To explore this tension, we critically assesses the Environmental Sustainability Index (ESI), a well-publicized product of the World Economic Forum that is designed to measure 'sustainability' by ranking nations on league tables based on extensive databases of environmental indicators. By recreating this index, and then using statistical tools (principal components analysis) to test relations between various components of the index, we challenge ways in which countries are ranked in the ESI. Based on this analysis, we suggest (1) that the approach taken to aggregate, interpret and present the ESI creates a misleading impression that Western countries are more sustainable than the developing world; (2) that unaccounted methodological biases allowed the authors of the ESI to over-generalize the relative 'sustainability' of different countries; and, (3) that this has resulted in simplistic conclusions on the relation between economic growth and environmental sustainability. This criticism should not be interpreted as a call for the abandonment of efforts to create standardized comparable data. Instead, this paper proposes that indicator selection and data collection should draw on a range of voices, including local stakeholders as well as international experts. We also propose that aggregating data into final league ranking tables is too prone to error and creates the illusion of absolute and categorical interpretations. (c) 2004 Elsevier Ltd. All rights reserved.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The systems used for the procurement of buildings are organizational systems. They involve people in a series of strategic decisions, and a pattern of roles, responsibilities and relationships that combine to form the organizational structure of the project. To ensure effectiveness of the building team, this organizational structure needs to be contingent upon the environment within which the construction project takes place. In addition, a changing environment means that the organizational structure within a project needs to be responsive, and dynamic. These needs are often not satisfied in the construction industry, due to the lack of analytical tools with which to analyse the environment and to design appropriate temporary organizations. This paper presents two techniques. First is the technique of "Environmental Complexity Analysis", which identifies the key variables in the environment of the construction project. These are classified as Financial, Legal, Technological, Aesthetic and Policy. It is proposed that their identification will set the parameters within which the project has to be managed. This provides a basis for the project managers to define the relevant set of decision points that will be required for the project. The Environmental Complexity Analysis also identifies the project's requirements for control systems concerning Budget, Contractual, Functional, Quality and Time control. The process of environmental scanning needs to be done at regular points during the procurement process to ensure that the organizational structure is adaptive to the changing environment. The second technique introduced is the technique of "3R analysis", being a graphical technique for describing and modelling Roles, Responsibilities and Relationships. A list of steps is introduced that explains the procedure recommended for setting up a flexible organizational structure that is responsive to the environment of the project. This is by contrast with the current trend towards predetermined procurement paths that may not always be in the best interests of the client.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The origins of the various procurement methods in construction are considered, followed by a discussion of the circumstances for which each procurement system is best suited. The likely future development sin management-based methods are discussed in the context of current research, showing that co-ordination of trade and specialist contractors , more flexible contracting, constructive conflict management and a potential polarization of views about project management in the industry are likely.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Although much literature on construction procurement is based on personal experiences, there is little data available to undertake realistic comparison between regions or from one year to another. A survey was undertaken in the UK to examine the feasibility of developing a replicable survey technique that will enable longitudinal studies and international comparisons. The survey showed that a majority felt traditional procurement methods were inappropriate. However, traditional general contracting is still the most common form of procurement. There was strong agreement that economic muscle compels weaker contracting parties to accept onerous contractual terms. There is no relationship between the size of a project and its procurement method, contrary to popular belief. The findings indicate that wider surveys would generate useful data about attitudes.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The costs of procurement are transaction costs which are separate from the direct costs of a project. In this paper discussion is concentrated on costs of tendering. Types of cost, including money costs and opportunity costs, short-term and long-term costs, private and social costs are defined and examined in relation to various types of product and methods of procurement. The costs of the contractor and of the client are considered and tentative conclusions drawn as to who bears these costs in the short-run and in the long run. They may fall on the parties to the process for the particular project, on other contractors and clients or on society as a whole.