36 resultados para process of change

em CentAUR: Central Archive University of Reading - UK


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Communities are increasingly empowered with the ability and responsibility of working with national governments to make decisions about marine resources in decentralized co-management arrangements. This transition toward decentralized management represents a changing governance landscape. This paper explores the transition to decentralisation in marine resource management systems in three East African countries. The paper draws upon expert opinion and literature from both political science and linked social-ecological systems fields to guide exploration of five key governance transition concepts in each country: (1) drivers of change; (2) institutional arrangments; (3 institutional fit; (4) actor interactions; and (5) adaptive management. Key findings are that decentralized management in the region was largely donor-driven and only partly tranferred power to local stakeholders. However, increased accountability created a degree of democracy in regards to natural resource governance that was not previously present. Additionally, increased local-level adaptive management has emerged in most systems and, to date, this experimental management has helped to change resource user's views from metaphysical to more scientific cause-and-effect attribution of changes to resource conditions.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Formal and analytical risk models prescribe how risk should be incorporated in construction bids. However, the actual process of how contractors and their clients negotiate and agree on price is complex, and not clearly articulated in the literature. Using participant observation, the entire tender process was shadowed in two leading UK construction firms. This was compared to propositions in analytical models and significant differences were found. 670 hours of work observed in both firms revealed three stages of the bidding process. Bidding activities were categorized and their extent estimated as deskwork (32%), calculations (19%), meetings (14%), documents (13%), off-days (11%), conversations (7%), correspondence (3%) and travel (1%). Risk allowances of 1-2% were priced in some bids and three tiers of risk apportionment in bids were identified. However, priced risks may sometimes be excluded from the final bidding price to enhance competitiveness. Thus, although risk apportionment affects a contractor’s pricing strategy, other complex, microeconomic factors also affect price. Instead of pricing in contingencies, risk was priced mostly through contractual rather than price mechanisms, to reflect commercial imperatives. The findings explain why some assumptions underpinning analytical models may not be sustainable in practice and why what actually happens in practice is important for those who seek to model the pricing of construction bids.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The objective of this study was to quantify the effect of photoperiod on the duration from vine (shoot) emergence to flowering in white or Guinea yam (Dioscorea rotundata). The duration from vine emergence to flowering in two clonal varieties of yam (TDr 131 and TDr 99-9) was recorded at 10 different sowing dates/locations in Nigeria. Durations to flowering varied from 40 to > 88 days. Mean daily temperature and photoperiod between vine emergence and flowering varied from 25 to 27 degrees C and 13.1 to 13.4 h day(-1), respectively. Both clones had similar responses to temperature, with base and optimum temperatures of 12 and 25-27 degrees C, respectively. Thermal durations to flowering were strongly related (r(2) > 0.75-0.83) to absolute photoperiod (h) at vine emergence as well as to rate of change of photoperiod (s day(-1)) at vine emergence. The response to absolute photoperiod suggests that white yams are quantitative LDPs, flowering sooner in long than short days. Yams also flowered earlier when the rate of change of photoperiod was positive but small, or was negative. It is suggested that yams may use a combination of photoperiod and rate of change in order to fine tune flowering time. (c) 2006 Elsevier B.V. All rights reserved.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Question: What is the value of using Rhinanthus minor in grassland restoration and can restrictions on its establishment be overcome? Location: England (United Kingdom). Methods: Two experiments were established to determine the efficacy of inoculating R. minor on a suite of four agriculturally improved grasslands and the efficacy of using R. minor in grassland restoration. In Experiment 1, the effect of herbicide gap creation on the establishment and persistence of R. minor in grasslands ranging in productivity was investigated with respect to sward management. In Exp. 2, R. minor was sown at 1000 seeds/m(2) in conjunction with a standard meadow mix over a randomized plot design into Lolium perenne grassland of moderate productivity. The treatment of scarification was investigated as a treatment to promote R. minor. Results: Gap size had a significant role in the establishment and performance of R. minor, especially the 30 cm diameter gaps (Exp. 1). However, R. minor failed to establish long-term persistent populations in all of the agriculturally improved grasslands. In Exp. 2, establishment of R. minor was increased by scarification and its presence was associated with a significant increase in Shannon diversity and the number of sown and unsown species. Values of grass above-ground biomass were significantly lower in plots sown with R. minor, but values of total above-ground biomass (including R. minor) and forb biomass (not including R. minor) were not affected. Conclusions: The value of introducing R. minor into species-poor grassland to increase diversity has been demonstrated, but successful establishment was dependent on grassland type. The scope for using R. minor in grassland restoration schemes is therefore conditional, although establishment can be enhanced through disturbance such as sward scarification.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The objective of this study was to quantify the effect of photoperiod on the duration from vine (shoot) emergence to flowering in white or Guinea yam (Dioscorea rotundata). The duration from vine emergence to flowering in two clonal varieties of yam (TDr 131 and TDr 99-9) was recorded at 10 different sowing dates/locations in Nigeria. Durations to flowering varied from 40 to > 88 days. Mean daily temperature and photoperiod between vine emergence and flowering varied from 25 to 27 degrees C and 13.1 to 13.4 h day(-1), respectively. Both clones had similar responses to temperature, with base and optimum temperatures of 12 and 25-27 degrees C, respectively. Thermal durations to flowering were strongly related (r(2) > 0.75-0.83) to absolute photoperiod (h) at vine emergence as well as to rate of change of photoperiod (s day(-1)) at vine emergence. The response to absolute photoperiod suggests that white yams are quantitative LDPs, flowering sooner in long than short days. Yams also flowered earlier when the rate of change of photoperiod was positive but small, or was negative. It is suggested that yams may use a combination of photoperiod and rate of change in order to fine tune flowering time. (c) 2006 Elsevier B.V. All rights reserved.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

In the tender process, contractors often rely on subcontract and supply enquiries to calculate their bid prices. However, this integral part of the bidding process is not empirically articulated in the literature. Over 30 published materials on the tendering process of contractors that talk about enquiries were reviewed and found to be based mainly on experiential knowledge rather than systematic evidence. The empirical research here helps to describe the process of enquiries precisely, improve it in practice, and have some basis to support it in theory. Using a live participant observation case study approach, the whole tender process was shadowed in the offices of two of the top 20 UK civil engineering construction firms. This helped to investigate 15 research questions on how contractors enquire and obtain prices from subcontractors and suppliers. Forty-three subcontract enquiries and 18 supply enquiries were made across two different projects with average value of 7m. An average of 15 subcontract packages and seven supply packages was involved. Thus, two or three subcontractors or suppliers were invited to bid in each package. All enquiries were formulated by the estimator, with occasional involvement of three other personnel. Most subcontract prices were received in an average of 14 working days; and supply prices took five days. The findings show 10 main activities involved in processing enquiries and their durations, as well as wasteful practices associated with enquiries. Contractors should limit their enquiry invitations to a maximum of three per package, and optimize the waiting time for quotations in order to improve cost efficiency.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Purpose – The purpose of this paper is to show the extent to which clients amend standard form contracts in practice, the locus of the amendments, and how contractors respond to the amendments when putting together a bid. Design/methodology/approach – Four live observational case studies were carried out in two of the top 20 UK construction firms. The whole process used to review the proposed terms and conditions of the contract was shadowed using participant observation, interview and documentary analysis. Findings – All four cases showed strong evidence of amendments relating mostly to payment and contractual aspects: 83 amendments in Case Study 1 (CS1), 80 in CS2, 15 in CS3 and 29 in CS4. This comprised clauses that were modified (37 per cent), substituted (23 per cent), deleted (7 per cent) and new additions (33 per cent). Risks inherent in the amendments were mostly addressed through contractual rather than price mechanisms, to reflect commercial imperatives. “Qualifications” and “clarifications” were included in the tender submissions for post-tender negotiations. Thus, the amendments did not necessarily influence price. There was no evidence of a “standard-form contract“ being used as such, although clients may draw on published “standard-form contracts” to derive the forms of contract actually used in practice. Practical implications – Contractors should pay attention to clauses relating to contractual and financial aspects when reviewing tender documents. Clients should draft equitable payment and contractual terms and conditions to reduce risk of dispute. Indeed, it is prudent for clients not to pass on inestimable risks. Originality/value – A better understanding of the extent and locus of amendments in standard form contracts, and how contractors respond, is provided.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper investigates and evaluates the process of knowledge transfer in construction projects. Due to the highly competitive nature of business environments, knowledge transfer between organisations has become increasingly popular in recent years. However, although organisations can realise remarkable benefits by transferring knowledge from one unit to another, successful knowledge transfer can be difficult to achieve. The discussions presented in the paper are mainly based on findings of two case studies. The two cases were selected from Private Finance Initiative (PFI) projects in the UK. According to the case study findings, different stages of a knowledge transfer process can be overlapped, omitted, repeated as well as intermitted and then restarted. One of the significant findings of the case studies was the role of the "knowledge mediator". In selected case studies, there were external consultants and expert staff in the form of knowledge mediators. The importance of their roles was frequently highlighted by the interview participants. They were not only facilitating the close liaison between the knowledge source and the receiver, but also their role was strongly associated with practices of translation and interpretation. This combined role of mediator/translator, therefore, appears to be particularly significant for inter-organisational knowledge transfer in PFI projects.