The current research agenda for construction process improvement is heavily influenced by the rhetoric of business process re-engineering (BPR). In contrast to the wider literature on BPR, there is little evidence of critical thought within the construction management research community. A postmodernist interpretation is advocated whereby the reality of management practice is defined by the dominant management discourse. The persuasiveness of BPR rhetoric is analysed with particular reference to the way in which it plays on the insecurity of modern managers. Despite the lip service given to ‘empowerment’ and ‘teamwork’, the dominant theme of the re-engineering movement is that of technocratic totalitarianism. From a critical perspective, it is suggested that BPR is imposed on construction organizations to ensure continued control by the industry's dominant power groups. Whilst industry leaders are fond of calling for ‘attitudinal and cultural improvement’, the language of the accepted research agenda continually reinforces the industry's dominant culture of ‘control and command’. Therefore, current research directions in process improvement perpetuate existing attitudes rather than facilitating cultural change. The concept of lean construction is seen to be the latest manifestation of this phenomenon.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

The construction sector is under growing pressure to increase productivity and improve quality, most notably in reports by Latham (1994, Constructing the Team, HMSO, London) and Egan (1998, Rethinking Construction, HMSO, London). A major problem for construction companies is the lack of project predictability. One method of increasing predictability and delivering increased customer value is through the systematic management of construction processes. However, the industry has no methodological mechanism to assess process capability and prioritise process improvements. Standardized Process Improvement for Construction Enterprises (SPICE) is a research project that is attempting to develop a stepwise process improvement framework for the construction industry, utilizing experience from the software industry, and in particular the Capability Maturity Model (CMM), which has resulted in significant productivity improvements in the software industry. This paper introduces SPICE concepts and presents the results from two case studies conducted on design and build projects. These studies have provided further in-sight into the relevance and accuracy of the framework, as well as its value for the construction sector.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

This paper identifies characteristics of knowledge intensive processes and a method to improve their performance based on analysis of investment banking front office processes. The inability to improve these processes using standard process improvement techniques confirmed that much of the process was not codified and depended on tacit knowledge and skills. This led to the use of a semi-structured analysis of the characteristics of the processes via a questionnaire to identify knowledge intensive processes characteristics that adds to existing theory. Further work identified innovative process analysis and change techniques that could generate improvements based on an analysis of their properties and the issue drivers. An improvement methodology was developed to harness a number of techniques that were found to effective in resolving the issue drivers and improving these knowledge intensive processes.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

A parallel hardware random number generator for use with a VLSI genetic algorithm processing device is proposed. The design uses an systolic array of mixed congruential random number generators. The generators are constantly reseeded with the outputs of the proceeding generators to avoid significant biasing of the randomness of the array which would result in longer times for the algorithm to converge to a solution. 1 Introduction In recent years there has been a growing interest in developing hardware genetic algorithm devices [1, 2, 3]. A genetic algorithm (GA) is a stochastic search and optimization technique which attempts to capture the power of natural selection by evolving a population of candidate solutions by a process of selection and reproduction [4]. In keeping with the evolutionary analogy, the solutions are called chromosomes with each chromosome containing a number of genes. Chromosomes are commonly simple binary strings, the bits being the genes.

Relevância:

80.00% 80.00%

Publicador:

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Enterprise Architecture (EA) has been recognised as an important tool in modern business management for closing the gap between strategy and its execution. The current literature implies that for EA to be successful, it should have clearly defined goals. However, the goals of different stakeholders are found to be different, even contradictory. In our explorative research, we seek an answer to the questions: What kind of goals are set for the EA implementation? How do the goals evolve during the time? Are the goals different among stakeholders? How do they affect the success of EA? We analysed an EA pilot conducted among eleven Finnish Higher Education Institutions (HEIs) in 2011. The goals of the pilot were gathered from three different stages of the pilot: before the pilot, during the pilot, and after the pilot, by means of a project plan, interviews during the pilot and a questionnaire after the pilot. The data was analysed using qualitative and quantitative methods. Eight distinct goals were recognised by the coding: Adopt EA Method, Build Information Systems, Business Development, Improve Reporting, Process Improvement, Quality Assurance, Reduce Complexity, and Understand the Big Picture. The success of the pilot was analysed statistically using the scale 1-5. Results revealed that goals set before the pilot were very different from those mentioned during the pilot, or after the pilot. Goals before the pilot were mostly related to expected benefits from the pilot, whereas the most important result was to adopt the EA method. Results can be explained by possibly different roles of respondents, which in turn were most likely caused by poor communication. Interestingly, goals mentioned by different stakeholders were not limited to their traditional areas of responsibility. For example, in some cases Chief Information Officers' goals were Quality Assurance and Process Improvement, whereas managers’ goals were Build Information Systems and Adopt EA Method. This could be a result of a good understanding of the meaning of EA, or stakeholders do not regard EA as their concern at all. It is also interesting to notice that regardless of the different perceptions of goals among stakeholders, all HEIs felt the pilot to be successful. Thus the research does not provide support to confirm the link between clear goals and success.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Motivation: Modelling the 3D structures of proteins can often be enhanced if more than one fold template is used during the modelling process. However, in many cases, this may also result in poorer model quality for a given target or alignment method. There is a need for modelling protocols that can both consistently and significantly improve 3D models and provide an indication of when models might not benefit from the use of multiple target-template alignments. Here, we investigate the use of both global and local model quality prediction scores produced by ModFOLDclust2, to improve the selection of target-template alignments for the construction of multiple-template models. Additionally, we evaluate clustering the resulting population of multi- and single-template models for the improvement of our IntFOLD-TS tertiary structure prediction method. Results: We find that using accurate local model quality scores to guide alignment selection is the most consistent way to significantly improve models for each of the sequence to structure alignment methods tested. In addition, using accurate global model quality for re-ranking alignments, prior to selection, further improves the majority of multi-template modelling methods tested. Furthermore, subsequent clustering of the resulting population of multiple-template models significantly improves the quality of selected models compared with the previous version of our tertiary structure prediction method, IntFOLD-TS.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

The present study aims to evaluate the probiotic potential of lactic acid bacteria (LAB) isolated from naturally fermented olives and select candidates to be used as probiotic starters for the improvement of the traditional fermentation process and the production of newly added value functional foods. Seventy one (71) lactic acid bacterial strains (17 Leuconostoc mesenteroides, 1 Ln. pseudomesenteroides, 13 Lactobacillus plantarum, 37 Lb. pentosus, 1 Lb. paraplantarum, and 2 Lb. paracasei subsp. paracasei) isolated from table olives were screened for their probiotic potential. Lb. rhamnosus GG and Lb. casei Shirota were used as reference strains. The in vitro tests included survival in simulated gastrointestinal tract conditions, antimicrobial activity (against Listeria monocytogenes, Salmonella Enteritidis, Escherichia coli O157:H7), Caco-2 surface adhesion, resistance to 9 antibiotics and haemolytic activity. Three (3) Lb. pentosus, 4 Lb. plantarum and 2 Lb. paracasei subsp. paracasei strains demonstrated the highest final population (>8 log cfu/ml) after 3 h of exposure at low pH. The majority of the tested strains were resistant to bile salts even after 4 h of exposure, while 5 Lb. plantarum and 7 Lb. pentosus strains exhibited partial bile salt hydrolase activity. None of the strains inhibited the growth of the pathogens tested. Variable efficiency to adhere to Caco-2 cells was observed. This was the same regarding strains' susceptibility towards different antibiotics. None of the strains exhibited β-haemolytic activity. As a whole, 4 strains of Lb. pentosus, 3 strains of Lb. plantarum and 2 strains of Lb. paracasei subsp. paracasei were found to possess desirable in vitro probiotic properties similar to or even better than the reference probiotic strains Lb. casei Shirota and Lb. rhamnosus GG. These strains are good candidates for further investigation both with in vivo studies to elucidate their potential health benefits and in olive fermentation processes to assess their technological performance as novel probiotic starters.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

This article describes a case study involving information technology managers and their new programmer recruitment policy, but the primary interest is methodological. The processes of issue generation and selection and model conceptualization are described. Early use of “magnetic hexagons” allowed the generation of a range of issues, most of which would not have emerged if system dynamics elicitation techniques had been employed. With the selection of a specific issue, flow diagraming was used to conceptualize a model, computer implementation and scenario generation following naturally. Observations are made on the processes of system dynamics modeling, particularly on the need to employ general techniques of knowledge elicitation in the early stages of interventions. It is proposed that flexible approaches should be used to generate, select, and study the issues, since these reduce any biasing of the elicitation toward system dynamics problems and also allow the participants to take up the most appropriate problem- structuring approach.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

We present an application of birth-and-death processes on configuration spaces to a generalized mutation4 selection balance model. The model describes the aging of population as a process of accumulation of mu5 tations in a genotype. A rigorous treatment demands that mutations correspond to points in abstract spaces. 6 Our model describes an infinite-population, infinite-sites model in continuum. The dynamical equation which 7 describes the system, is of Kimura-Maruyama type. The problem can be posed in terms of evolution of states 8 (differential equation) or, equivalently, represented in terms of Feynman-Kac formula. The questions of interest 9 are the existence of a solution, its asymptotic behavior, and properties of the limiting state. In the non-epistatic 10 case the problem was posed and solved in [Steinsaltz D., Evans S.N., Wachter K.W., Adv. Appl. Math., 2005, 11 35(1)]. In our model we consider a topological space X as the space of positions of mutations and the influence of epistatic potentials

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Planning is a vital element of project management but it is still not recognized as a process variable. Its objective should be to outperform the initially defined processes, and foresee and overcome possible undesirable events. Detailed task-level master planning is unrealistic since one cannot accurately predict all the requirements and obstacles before work has even started. The process planning methodology (PPM) has thus been developed in order to overcome common problems of the overwhelming project complexity. The essential elements of the PPM are the process planning group (PPG), including a control team that dynamically links the production/site and management, and the planning algorithm embodied within two continuous-improvement loops. The methodology was tested on a factory project in Slovenia and in four successive projects of a similar nature. In addition to a number of improvement ideas and enhanced communication, the applied PPM resulted in 32% higher total productivity, 6% total savings and created a synergistic project environment.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper considers the process of Participatory Varietal Selection (PVS) and presents approaches and ideas based on PVS activities conducted on upland rice throughout Ghana between 1997 and 2003. In particular the role of informal seed systems in PVS is investigated and implications for PVS design are identified. PVS programmes were conducted in two main agroecological zones, Forest and Savannah, with 1,578 and 1,143 mm of annual rainfall, respectively, and between 40 and 100 varieties tested at each site. In the Savannah zone IR12979-24-1 was officially released and in the Forest zone IDSA 85 was widely accepted by farmers. Two surveys were conducted in an area of the Forest zone to study mechanisms of spread. Here small amounts (1-2 kg) of seed of selected varieties had been given to 94 farmers. In 2002, 37% of 2,289 farmers in communities surveyed had already grown a PVS variety and had obtained seed via informal mechanisms from other farmers, i.e. through gift, exchange or purchase. A modified approach for PVS is presented which enables important issues identified in the paper to be accommodated. These issues include: utilising existing seed spread mechanisms; facilitating formal release of acceptable varieties; assessing post-harvest traits, and; the need for PVS to be an ongoing and sustainable process.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Background Primary bacterial endosymbionts of insects (p-endosymbionts) are thought to be undergoing the process of Muller's ratchet where they accrue slightly deleterious mutations due to genetic drift in small populations with negligible recombination rates. If this process were to go unchecked over time, theory predicts mutational meltdown and eventual extinction. Although genome degradation is common among p-endosymbionts, we do not observe widespread p-endosymbiont extinction, suggesting that Muller's ratchet may be slowed or even stopped over time. For example, selection may act to slow the effects of Muller's ratchet by removing slightly deleterious mutations before they go to fixation thereby causing a decrease in nucleotide substitutions rates in older p-endosymbiont lineages. Methodology/Principal Findings To determine whether selection is slowing the effects of Muller's ratchet, we determined the age of the Candidatus Riesia/sucking louse assemblage and analyzed the nucleotide substitution rates of several p-endosymbiont lineages that differ in the length of time that they have been associated with their insect hosts. We find that Riesia is the youngest p-endosymbiont known to date, and has been associated with its louse hosts for only 13–25 My. Further, it is the fastest evolving p-endosymbiont with substitution rates of 19–34% per 50 My. When comparing Riesia to other insect p-endosymbionts, we find that nucleotide substitution rates decrease dramatically as the age of endosymbiosis increases. Conclusions/Significance A decrease in nucleotide substitution rates over time suggests that selection may be limiting the effects of Muller's ratchet by removing individuals with the highest mutational loads and decreasing the rate at which new mutations become fixed. This countering effect of selection could slow the overall rate of endosymbiont extinction.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Background Large-scale genetic profiling, mapping and genetic association studies require access to a series of well-characterised and polymorphic microsatellite markers with distinct and broad allele ranges. Selection of complementary microsatellite markers with non-overlapping allele ranges has historically proved to be a bottleneck in the development of multiplex microsatellite assays. The characterisation process for each microsatellite locus can be laborious and costly given the need for numerous, locus-specific fluorescent primers. Results Here, we describe a simple and inexpensive approach to select useful microsatellite markers. The system is based on the pooling of multiple unlabelled PCR amplicons and their subsequent ligation into a standard cloning vector. A second round of amplification utilising generic labelled primers targeting the vector and unlabelled locus-specific primers targeting the microsatellite flanking region yield allelic profiles that are representative of all individuals contained within the pool. Suitability of various DNA pool sizes was then tested for this purpose. DNA template pools containing between 8 and 96 individuals were assessed for the determination of allele ranges of individual microsatellite markers across a broad population. This helped resolve the balance between using pools that are large enough to allow the detection of many alleles against the risk of including too many individuals in a pool such that rare alleles are over-diluted and so do not appear in the pooled microsatellite profile. Pools of DNA from 12 individuals allowed the reliable detection of all alleles present in the pool. Conclusion The use of generic vector-specific fluorescent primers and unlabelled locus-specific primers provides a high resolution, rapid and inexpensive approach for the selection of highly polymorphic microsatellite loci that possess non-overlapping allele ranges for use in large-scale multiplex assays.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Supplier selection has a great impact on supply chain management. The quality of supplier selection also affects profitability of organisations which work in the supply chain. As suppliers can provide variety of services and customers demand higher quality of service provision, the organisation is facing challenges for making the right choice of supplier for the right needs. The existing methods for supplier selection, such as data envelopment analysis (DEA) and analytical hierarchy process (AHP) can automatically perform selection of competitive suppliers and further decide winning supplier(s). However, these methods are not capable of determining the right selection criteria which should be derived from the business strategy. An ontology model described in this paper integrates the strengths of DEA and AHP with new mechanisms which ensure the right supplier to be selected by the right criteria for the right customer's needs.