7 resultados para organizational structure

em CentAUR: Central Archive University of Reading - UK


Relevância:

70.00% 70.00%

Publicador:

Resumo:

The principles of organization theory are applied to the organization of construction projects. This is done by proposing a framework for modelling the whole process of building procurement. This consists of a framework for describing the environments within which construction projects take place. This is followed by the development of a series of hypotheses about the organizational structure of construction projects. Four case studies are undertaken, and the extent to which their organizational structure matches the model is compared to the level of success achieved by each project. To this end there is a systematic method for evaluating the success of building project organizations, because any conclusions about the adequacy of a particular organization must be related to the degree of success achieved by that organization. In order to test these hypotheses, a mapping technique is developed. The technique offered is a development of a technique known as Linear Responsibility Analysis, and is called "3R analysis" as it deals with roles, responsibilities and relationships. The analysis of the case studies shows that they tended to suffer due to inappropriate organizational structure. One of the prevailing problems of public sector organization is that organizational structures are inadequately defined, and too cumbersome to respond to environmental demands on the project. The projects tended to be organized as rigid hierarchies, particularly at decision points, when what was required was a more flexible, dynamic and responsive organization. The study concludes with a series of recommendations; including suggestions for increasing the responsiveness of construction project organizations, and reducing the lead-in times for the inception periods.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

The technique of linear responsibility analysis is used for a retrospective case study of a private industrial development consisting of an extension to existing buildings to provide a warehouse, services block and packing line. The organizational structure adopted on the project is analysed using concepts from systems theory which are included in Walker's theoretical model of the structure of building project organizations (Walker, 1981). This model proposes that the process of building provision can be viewed as systems and subsystems which are differentiated from each other at decision points. Further to this, the subsystems can be viewed as the interaction of managing system and operating system. Using Walker's model, a systematic analysis of the relationships between the contributors gives a quantitative assessment of the efficacy of the organizational structure used. The causes of the client's dissatisfaction with the outcome of the project were lack of integration and complexity of the managing system. However, there was a high level of satisfaction with the completed project and this is reflected by the way in which the organization structure corresponded to the model's propositions.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

The technique of linear responsibility analysis is used for a retrospective case study of a private development consisting of an extension to an existing building to provide a wholesale butchery facility. The project used a conventionally organized management process. The organization structure adopted on the project is analysed using concepts from the systems theory, which are included in Walkers theoretical model of the structure of building project organizations. This model proposes that the process of building provision can be viewed as systems and sub-systems that are differentiated from each other at decision points. Further to this, the sub-systems can be viewed as the interaction of managing system and operating system. Using Walkers model, a systematic analysis of the relationships between the contributors gives a quantitative assessment of the efficiency of the organizational structure used. The project's organization structure diverged from the models propositions resulting in delay to the project's completion and cost overrun but the client was satisfied with the project functionally.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

The technique of linear responsibility analysis is used for a retrospective case study of a private industrial development consisting of an engineering factory and offices. A multi-disciplinary professional practice was used to manage and design the project. The organizational structure adopted on the project is analysed using concepts from systems theory which are included in Walker's theoretical model of the structure of building project organizations (Walker, 1981). This model proposes that the process of buildings provision can be viewed as systems and sub-systems which are differentiated form each other at decision points. Further to this, the sub-systematic analysis of the relationship between the contributors gives a quantitative assessment of the efficiency of the organizational structure used. There was a high level of satisfaction with the completed project and this is reflected by the way in which the organization structure corresponded to the model's proposition. However, the project was subject to string environmental forces which the project organization was not capable of entirely overcoming.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

The systems used for the procurement of buildings are organizational systems. They involve people in a series of strategic decisions, and a pattern of roles, responsibilities and relationships that combine to form the organizational structure of the project. To ensure effectiveness of the building team, this organizational structure needs to be contingent upon the environment within which the construction project takes place. In addition, a changing environment means that the organizational structure within a project needs to be responsive, and dynamic. These needs are often not satisfied in the construction industry, due to the lack of analytical tools with which to analyse the environment and to design appropriate temporary organizations. This paper presents two techniques. First is the technique of "Environmental Complexity Analysis", which identifies the key variables in the environment of the construction project. These are classified as Financial, Legal, Technological, Aesthetic and Policy. It is proposed that their identification will set the parameters within which the project has to be managed. This provides a basis for the project managers to define the relevant set of decision points that will be required for the project. The Environmental Complexity Analysis also identifies the project's requirements for control systems concerning Budget, Contractual, Functional, Quality and Time control. The process of environmental scanning needs to be done at regular points during the procurement process to ensure that the organizational structure is adaptive to the changing environment. The second technique introduced is the technique of "3R analysis", being a graphical technique for describing and modelling Roles, Responsibilities and Relationships. A list of steps is introduced that explains the procedure recommended for setting up a flexible organizational structure that is responsive to the environment of the project. This is by contrast with the current trend towards predetermined procurement paths that may not always be in the best interests of the client.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

An overview of organization in the construction industry is identified from plans of work published in the UK. This provides a basis for identifying the essential steps through which any construction project must pass. It is shown that all construction projects pass through a set of stages of work, consisting of inception, feasibility, scheme design, detail design, contract formation, construction and commissioning. Although there may be changes to the sequence and importance of these stages, their identification helps in making judgements about organizational structure on construction projects.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

The RIBA Plan of Work describes the way a construction process should be organized. Although not officially approved by the RIBA council, a new plan of work was published in 2000 with the intention of replacing the RIBA Plan of Work, so it is useful to analyse both in terms of the organizational structure they impose upon construction projects. Using analytical principles from organizational theory, both plans are analysed by converting them into organizational matrices and assessing their relative complexities, the load on participants, decentralization of responsibility, number of interfaces and the extent to which they provide for co-ordination and control. This demonstrates first, that the analysis of organizational structure is an appropriate approach for undertaking comparisons of such documents; and second, that while both plans of work are of roughly equal complexity, the new one is more demanding on the participants; produces a higher number of interfaces between processes, and provides for more co-ordination than the old one. Neither plan deals with controlling the output of individuals, leaving it as an internal matter for each participating organization.