3 resultados para maturity model
em CentAUR: Central Archive University of Reading - UK
Resumo:
The construction sector is under growing pressure to increase productivity and improve quality, most notably in reports by Latham (1994, Constructing the Team, HMSO, London) and Egan (1998, Rethinking Construction, HMSO, London). A major problem for construction companies is the lack of project predictability. One method of increasing predictability and delivering increased customer value is through the systematic management of construction processes. However, the industry has no methodological mechanism to assess process capability and prioritise process improvements. Standardized Process Improvement for Construction Enterprises (SPICE) is a research project that is attempting to develop a stepwise process improvement framework for the construction industry, utilizing experience from the software industry, and in particular the Capability Maturity Model (CMM), which has resulted in significant productivity improvements in the software industry. This paper introduces SPICE concepts and presents the results from two case studies conducted on design and build projects. These studies have provided further in-sight into the relevance and accuracy of the framework, as well as its value for the construction sector.
Resumo:
A model was published by Lewis et al. (2002) to predict the mean age at first egg (AFE) for pullets of laying strains reared under non-limiting environmental conditions and exposed to a single change in photoperiod during the rearing stage. Subsequently, Lewis et al. (2003) reported the effects of two opposing changes in photoperiod, which showed that the first change appears to alter the pullet's physiological age so that it responds to the second change as though it had been given at an earlier age (if photoperiod was decreased), or later age (if photoperiod was increased) than the true chronological age. During the construction of a computer model based on these two publications, it became apparent that some of the components of the models needed adjustment. The amendments relate to (1) the standard deviation (S.D.) used for calculating the proportion of a young flock that has attained photosensitivity, (2) the equation for calculating the slope of the line relating AFE to age at transfer from one photoperiod to another, (3) the equation used for estimating the distribution of AFE as a function of the mean value, (4) the point of no return when pullets which have started spontaneous maturation in response to the current photoperiod can no longer respond to a late change in photoperiod and (5) the equations used for calculating the distribution of AFE when the trait is bimodal.
Resumo:
The 2008-2009 financial crisis and related organizational and economic failures have meant that financial organizations are faced with a ‘tsunami’ of new regulatory obligations. This environment provides new managerial challenges as organizations are forced to engage in complex and costly remediation projects with short deadlines. Drawing from a longitudinal study conducted with nine financial institutions over twelve years, this paper identifies nine IS capabilities which underpin activities for managing regulatory themed governance, risk and compliance efforts. The research shows that many firms are now focused on meeting the Regulators’ deadlines at the expense of developing a strategic, enterprise-wide connected approach to compliance. Consequently, executives are in danger of implementing siloed compliance solutions within business functions. By evaluating the maturity of their IS capabilities which underpin regulatory adherence, managers have an opportunity to develop robust operational architectures and so are better positioned to face the challenges derived from shifting regulatory landscapes.