15 resultados para log house building
em CentAUR: Central Archive University of Reading - UK
Resumo:
Virtual reality has the potential to improve visualisation of building design and construction, but its implementation in the industry has yet to reach maturity. Present day translation of building data to virtual reality is often unidirectional and unsatisfactory. Three different approaches to the creation of models are identified and described in this paper. Consideration is given to the potential of both advances in computer-aided design and the emerging standards for data exchange to facilitate an integrated use of virtual reality. Commonalities and differences between computer-aided design and virtual reality packages are reviewed, and trials of current system, are described. The trials have been conducted to explore the technical issues related to the integrated use of CAD and virtual environments within the house building sector of the construction industry and to investigate the practical use of the new technology.
Resumo:
The Lifetime Homes (LTH) concept initiated in 1989 by the Helen Hamlyn Trust, and subsequently promoted by the Joseph Rowntree Foundation, emerged at a point when there was growing awareness of the decline of both private and public sector housing quality, especially in relation to floorspace standards (Karn & Sheridan, 1994). LTH were intended to offset the concerns of first, the house buying public of the appearance and affordability of homes suitable for successive generations, second, the private house building industry of the cost and marketability of incorporating 'inclusive' design features, and third, Registered Social Landlords (RSLs), who had to balance cost constraints with addressing the needs of a growing number of households with older and/or disabled people. Approved Document Part M of the building regulations was extended in 1999, from public buildings to private dwellings, and currently requires that all new housing meet minimal 'visitability' criteria. Indeed, although the signs are that Part M will be incrementally extended to comprise LTH principles, the paper argues that in their existing form they are insufficient to act as a key component of the government's 'new agenda for British housing'. This paper therefore explores how they might usefully be expanded from an approach, largely based on compromise, to one that inspires innovative, flexible and inclusive house forms, which also challenge design conventions.
Resumo:
Organizational issues are inhibiting the implementation and strategic use of information technologies (IT) in the construction sector. This paper focuses on these issues and explores processes by which emerging technologies can be introduced into construction organizations. The paper is based on a case study, conducted in a major house building company that was implementing a virtual reality (VR) system for internal design review in the regional offices. Interviews were conducted with different members of the organization to explore the introduction process and the use of the system. The case study findings provide insight into the process of change, the constraints that inhibit IT implementation and the relationship between new technology and work patterns within construction organizations. They suggest that (1) user-developer communications are critical for the successful implementation of non-diffused innovations in the construction industry; and (2) successful uptake of IT requires both strategic decision-making by top management and decision-making by technical managers.
Resumo:
Environmental policy in the United Kingdom (UK) is witnessing a shift from command-and-control approaches towards more innovation-orientated environmental governance arrangements. These governance approaches are required which create institutions which support actors within a domain for learning not only about policy options, but also about their own interests and preferences. The need for construction actors to understand, engage and influence this process is critical to establishing policies which support innovation that satisfies each constituent’s needs. This capacity is particularly salient in an era where the expanding raft of environmental regulation is ushering in system-wide innovation in the construction sector. In this paper, the Code for Sustainable Homes (the Code) in the UK is used to demonstrate the emergence and operation of these new governance arrangements. The Code sets out a significant innovation challenge for the house-building sector with, for example, a requirement that all new houses must be zero-carbon by 2016. Drawing upon boundary organisation theory, the journey from the Code as a government aspiration, to the Code as a catalyst for the formation of the Zero Carbon Hub, a new institution, is traced and discussed. The case study reveals that the ZCH has demonstrated boundary organisation properties in its ability to be flexible to the needs and constraints of its constituent actors, yet robust enough to maintain and promote a common identity across regulation and industry boundaries.
Resumo:
Extreme weather events, including heatwaves, are predicted to increase in both frequency and severity over the coming decades. Low house building rates and a growing population mean there is a need to adapt existing dwellings. Research presented here uses dynamic thermal simulation to model the effect of passive heatwave mitigating interventions for UK dwellings. Interventions include a range of additions and modifications to solar shading, insulation and ventilation. Results are presented for typical end and mid terrace houses, with four orientations, two occupancy profiles and using weather data from the 2003 heatwave. Results show the effectiveness of interventions that reduce solar gains through the building fabric, such as external wall insulation and solar reflective coatings. Internal wall insulation is shown to be less effective and can increase the overheating problem in some cases. Control of solar gains through glazing, using shutters and fixed shading, are also effective, particularly for south, east and west-facing rooms. Results are also presented which demonstrate how it is possible to select combinations of interventions that both eliminate overheating and reduce space heating energy use. The cost of interventions is also considered in the final analysis.
Resumo:
The UK new-build housing sector is facing dual pressures to expand supply, whilst delivering against tougher planning and Building Regulation requirements; predominantly in the areas of sustainability. The sector is currently responding by significantly scaling up production and incorporating new technical solutions into new homes. This trajectory of up-scaling and technical innovation has been of research interest; but this research has primarily focus on the ‘upstream’ implications for house builders’ business models and standardised design templates. There has been little attention, though, to the potential ‘downstream’ implications of the ramping up of supply and the introduction of new technologies for build quality and defects. This paper contributes to our understanding of the ‘downstream’ implications through a synthesis of the current UK defect literature with respect to new-build housing. It is found that the prevailing emphasis in the literature is limited to the responsibility, pathology and statistical analysis of defects (and failures). The literature does not extend to how house builders individually and collectively, in practice, collect and learn from defects information. The paper concludes by describing an ongoing collaborative research programme with the National House Building Council (NHBC) to: (a) understand house builders’ localised defects analysis procedures, and their current knowledge feedback loops to inform risk management strategies; and, (b) building on this understanding, design and test action research interventions to develop new data capture, learning processes and systems to reduce targeted defects.
Resumo:
The UK house building sector is facing dual pressures to expand supply, along with delivering against tougher Building Regulations’ requirements, predominantly in the areas of sustainability. A review of current literature has highlighted that the pressures the UK house building industry is currently under may be having a negative impact on build quality, causing an increase in defects. A review and synthesis of the current defect literature with respect to new-build housing and the wider construction sector has found that the prevailing emphasis is limited to the classification, causes, pathology and statistical analysis of defects. There is thus a need to better understand the overall impact of individual defects on key stakeholders within the new-build housing defect detection and remediation process. As part of ongoing research to develop and verify a defect impact assessment rating system, this paper seeks to contribute to our understanding of the impact of individual defects from a key stakeholder perspective by undertaking the literature review and synthesis phase. The literature review identifies the three distinct, but interrelated, dominant impact factors: cost, disruption, and health and safety. By pulling the strands of defect literature together the theoretical lens and key stakeholder sampling strategy is formed as the basis for the subsequent impact weighting development phase.
Resumo:
House builders play a key role in controlling the quality of new homes in the UK. The UK house building sector is, however, currently facing pressures to expand supply as well as conform to tougher low carbon planning and Building Regulation requirements; primarily in the areas of sustainability. There is growing evidence that the pressure the UK house building industry is currently under may be eroding build quality and causing an increase in defects. It is found that the prevailing defect literature is limited to the causes, pathology and statistical analysis of defects (and failures). The literature does not extend to examine how house builders individually and collectively, in practice, collect and learn from defects experience in order to reduce the prevalence of defects in future homes. The theoretical lens for the research is organisational learning. This paper contributes to our understanding of organisational learning in construction through a synthesis of current literature. Further, a suitable organisational learning model is adopted. The paper concludes by reporting the research design of an ongoing collaborative action research project with the National House Building Council (NHBC), focused on developing a better understanding of house builders’ localised defects analysis procedures and learning processes.
Resumo:
With the increase in e-commerce and the digitisation of design data and information,the construction sector has become reliant upon IT infrastructure and systems. The design and production process is more complex, more interconnected, and reliant upon greater information mobility, with seamless exchange of data and information in real time. Construction small and medium-sized enterprises (CSMEs), in particular,the speciality contractors, can effectively utilise cost-effective collaboration-enabling technologies, such as cloud computing, to help in the effective transfer of information and data to improve productivity. The system dynamics (SD) approach offers a perspective and tools to enable a better understanding of the dynamics of complex systems. This research focuses upon system dynamics methodology as a modelling and analysis tool in order to understand and identify the key drivers in the absorption of cloud computing for CSMEs. The aim of this paper is to determine how the use of system dynamics (SD) can improve the management of information flow through collaborative technologies leading to improved productivity. The data supporting the use of system dynamics was obtained through a pilot study consisting of questionnaires and interviews from five CSMEs in the UK house-building sector.
Resumo:
Housing Associations (HAs) contribute circa 20% of the UK’s housing supply. HAs are however under increasing pressure as a result of funding cuts and rent reductions. Due to the increased pressure, a number of processes are currently being reviewed by HAs, especially how they manage and learn from defects. Learning from defects is considered a useful approach to achieving defect reduction within the UK housebuilding industry. This paper contributes to our understanding of how HAs learn from defects by undertaking an initial round table discussion with key HA stakeholders as part of an ongoing collaborative research project with the National House Building Council (NHBC) to better understand how house builders and HAs learn from defects to reduce their prevalence. The initial discussion shows that defect information runs through a number of groups, both internal and external of a HA during both the defects management process and organizational learning (OL) process. Furthermore, HAs are reliant on capturing and recording defect data as the foundation for the OL process. During the OL process defect data analysis is the primary enabler to recognizing a need for a change to organizational routines. When a need for change has been recognized, new options are typically pursued to design out defects via updates to a HAs Employer’s Requirements. Proposed solutions are selected by a review board and committed to organizational routine. After implementing a change, both structured and unstructured feedback is sought to establish the change’s success. The findings from the HA discussion demonstrates that OL can achieve defect reduction within the house building sector in the UK. The paper concludes by outlining a potential ‘learning from defects model’ for the housebuilding industry as well as describing future work.
Resumo:
The People's Republic of China and its 1.3 billion people have experienced a rapid economic growth in the past two decades. China's urbanisation ratio rose from around 20% in the early 1980s to 45% in 2007 [China Urban Research Committee. Green building. Beijing: Chinese Construction Industrial Publish House; 2008. ISBN 978-7-112-09925-2.]. The large volume and rapid speed of building construction rarely have been seen in global development and cause substantial pressure on resources and the environment. Government policy makers and building professionals, including architects, building engineers, project managers and property developers, should play an important role in enhancing the planning, design, construction, operation and maintenance of the building energy efficiency process in forming the sustainable urban development. This paper addresses the emerging issues relating to building energy consumption and building energy efficiency due to the fast urbanisation development in China.
Resumo:
In an essay from 1910 the architect and critic Adolf Loos distinguishes between buildings that are for everyday practical use and buildings made for contemplation. The latter type he asserts may be considered as both architecture and works of art. He refers to only two types of contemplative architecture namely the tomb and the monument. There are certain paintings made in the early part of the twentieth century that do not observe this separation such as certain works by Hopper and de Chirico. Here the commonplace is simultaneously experienced in the way a tomb might be. This mortifying gaze condemns building by inducing a sense that space has become inhospitable and alienating. It could be argued that these and other paintings made around this time such as Carlo Carra The Abandoned House 1916 are like premonitions of what will occur when building observes the prescription laid down by Loos and omit an aesthetic dimension. However it might also suggest that buildings need their tombs or at least some space that is not completely assimilable by the daily, practical and functional needs of an inhabitant.
Resumo:
Existing buildings contribute greatly to global energy use and greenhouse gas emissions. In the UK, about 18% of carbon emissions are generated by non-domestic buildings; sustainable building refurbishment can play an important role in reducing carbon emissions. This paper looks at the performance of a recently refurbished 5-storey office building in London, in terms of energy consumption as well as occupants’ satisfaction. Pre- and post-occupancy evaluation studies were conducted using online questionnaire surveys and energy consumption evaluation. Results from pre-occupancy and post-occupancy evaluation studies showed that employees, in general, were more satisfied with their work environment at the refurbished building than with that of their previous office. Employees’ self-reported productivity improved after the move to Elms House. These surveys showed a positive relationship between employees’ satisfaction with their work environment and their self-reported productivity, well-being and enjoyment at work. The factor that contributed to increasing employee satisfaction the most was: better use of interior space. Although the refurbishment was a success in terms of reducing energy consumption per m2, the performance gap was almost 3 times greater than that estimated. Unregulated loads, problems with building control, ineffective use of space and occupants’ behaviour are argued to be reasons for this gap.