107 resultados para interest costs

em CentAUR: Central Archive University of Reading - UK


Relevância:

20.00% 20.00%

Publicador:

Resumo:

The basic premise of transaction-cost theory is that the decision to outsource, rather than to undertake work in-house, is determined by the relative costs incurred in each of these forms of economic organization. In construction the "make or buy" decision invariably leads to a contract. Reducing the costs of entering into a contractual relationship (transaction costs) raises the value of production and is therefore desirable. Commonly applied methods of contractor selection may not minimise the costs of contracting. Research evidence suggests that although competitive tendering typically results in the lowest bidder winning the contract this may not represent the lowest project cost after completion. Multi-parameter and quantitative models for contractor selection have been developed to identify the best (or least risky) among bidders. A major area in which research is still needed is in investigating the impact of different methods of contractor selection on the costs of entering into a contract and the decision to outsource.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The costs of procurement are transaction costs which are separate from the direct costs of a project. In this paper discussion is concentrated on costs of tendering. Types of cost, including money costs and opportunity costs, short-term and long-term costs, private and social costs are defined and examined in relation to various types of product and methods of procurement. The costs of the contractor and of the client are considered and tentative conclusions drawn as to who bears these costs in the short-run and in the long run. They may fall on the parties to the process for the particular project, on other contractors and clients or on society as a whole.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The cost of tendering in the construction industry is widely suspected to be excessive, but there is little robust empirical evidence to demonstrate this. It also seems that innovative working practices may reduce the costs of undertaking construction projects and the consequent improvement in relationships should increase overall value for money. The aim of this proposed research project is to develop mechanisms for measuring the true costs of tendering based upon extensive in-house data collection undertaken in a range of different construction firms. The output from this research will enable all participants in the construction process to make better decisions about how to select members of the team and identify the price and scope of their obligations.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In developing techniques for monitoring the costs associated with different procurement routes, the central task is disentangling the various project costs incurred by organizations taking part in construction projects. While all firms are familiar with the need to analyse their own costs, it is unusual to apply the same kind of analysis to projects. The purpose of this research is to examine the claims that new ways of working such as strategic alliancing and partnering bring positive business benefits. This requires that costs associated with marketing, estimating, pricing, negotiation of terms, monitoring of performance and enforcement of contract are collected for a cross-section of projects under differing arrangements, and from those in the supply chain from clients to consultants, contractors, sub-contractors and suppliers. Collaboration with industrial partners forms the basis for developing a research instrument, based on time sheets, which will be relevant for all those taking part in the work. The signs are that costs associated with tendering are highly variable, 1-15%, depending upon what precisely is taken into account. The research to date reveals that there are mechanisms for measuring the costs of transactions and these will generate useful data for subsequent analysis.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

FOREWORD Welcome to this West Africa Built Environment Research (WABER) conference taking place here in Ghana. Thank you for coming and welcome to Accra. The main aims of the WABER conference are: to help young researchers and early-career scholars in West Africa to develop their research work and skills through constructive face-to-face interaction with experienced academics; to provide a platform for networking and collaborative work among senior built environment academics in West Africa; and to serve as a vehicle for developing the field of construction management and economics in Africa. Waber 2009 The WABER event in 2009 was held at the British Council in Accra, Ghana on 2-3 June. The event was a resounding success. It attracted participation from 32 researchers, from 12 different institutions, who presented their work to an audience of approximately 100 people. Each presenter received immediate and constructive feedback from an international panel. The event was opened by Professor K.K. Adarkwa, Vice Chancellor of KNUST, Kumasi, Ghana, with several senior academics and researchers from universities, polytechnics, and other institutions in Ghana and Nigeria in attendance. There was also a significant level of attendance by senior construction practitioners in Ghana. Thank you to the School of Construction Management and Engineering, University of Reading, UK for funding the inaugural event in 2009. We are also grateful to all of you who helped to make the event a success and to those of you who have joined us here today to build upon the success and legacy of WABER 2009. Waber 2010 This year, we have 60+ peer-reviewed papers and presentations on topics relating to Building services and maintenance, Construction costs, Construction design and technology, Construction education, Construction finance, Construction procurement, Contract administration, Contract management, Contractor development, Decision support systems, Dispute resolution, Economic development, Energy efficiency, Environment and sustainability, Health and safety, Human resources, Information technology, Marketing, Materials science, Organisation strategy and business performance, Productivity, Project management, Quantity surveying, Real estate and planning, Solar energy systems, Supply chain management and Urban development. We hope that these papers will generate interest among delagates and stimulate discussion here and beyond the conference into the wider community of academia and industry. The delegates at this conference come from 10 different countries. This provides a rich international and multicultural blend and a perfect platform for networking and developing collaborations. This year we are blessed to have three high profile keynote speakers in the persons of Professor George Ofori (National University of Singapore), Dr Roine Leiringer (University of Reading, UK) and Professor Will Hughes (University of Reading, UK). We are also thankful to Dr Chris Harty (University of Reading, UK) who is facilitating the Research Skills Workshop on ‘Writing a scientific article’. Thank you to Dr Sena Agyepong of our conference organising team for her capable management of local organising arrangements. And above all, thank you to all of you for coming to this conference. Enjoy and have a safe journey back home. Dr Samuel Laryea School of Construction Management and Engineering University of Reading, July 2010

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Threshold Error Correction Models are used to analyse the term structure of interest Rates. The paper develops and uses a generalisation of existing models that encompasses both the Band and Equilibrium threshold models of [Balke and Fomby ((1997) Threshold cointegration. Int Econ Rev 38(3):627–645)] and estimates this model using a Bayesian approach. Evidence is found for threshold effects in pairs of longer rates but not in pairs of short rates. The Band threshold model is supported in preference to the Equilibrium model.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The 'direct costs' attributable to 30 different endemic diseases of farm animals in Great Britain are estimated using a standardised method to construct a simple model for each disease that includes consideration of disease prevention and treatment costs. The models so far developed provide a basis for further analyses including cost-benefit analyses for the economic assessment of disease control options. The approach used reflects the inherent livestock disease information constraints, which limit the application of other economic analytical methods. It is a practical and transparent approach that is relatively easily communicated to veterinary scientists and policy makers. The next step is to develop the approach by incorporating wider economic considerations into the analyses in a way that will demonstrate to policy makers and others the importance of an economic perspective to livestock disease issues.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This Note outlines the further development of a system of models for the estimation of the costs of livestock diseases first presented by Bennett (2003). The models have been developed to provide updated and improved estimates of the costs associated with 34 endemic diseases of livestock in Great Britain, using border prices and including assessments of the impact of diseases on human health and animal welfare. Results show that, of the diseases studied, mastitis has the highest costs for cattle diseases, enzootic abortion for sheep diseases, swine influenza for pig diseases and salmonellosis for poultry diseases.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Sixty cattle farmers in England were questioned about the costs associated with premovement testing for bovine tuberculosis (TB). On average, the farmers had premovement tested 2-45 times in the previous 12 months, but the majority had tested only once. An average of 28.6 animals were tested on each occasion, but there were wide variations. The average farm labour costs were (sic)4.00 per animal tested, veterinary costs were (sic)4.33 and other costs were (sic)0.51, giving a total cost of (sic)8.84, but there were wide variations between farms, and many incurred costs of more than (sic)20 per animal. A majority of the farmers also cited disruption to the farm business or missed market opportunities as costs, but few could estimate their financial cost. Most of the farmers thought that premovement testing was a cost burden on their business, and over half thought It was not an effective policy to control bovine TB.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

An on-farm survey of 151 cattle farmers who had experienced a bovine tuberculosis (Mycobacterium bovis) breakdown on their farms was undertaken in 2003 to assess the costs associated with the breakdown. In 90 per cent of cases the cost was estimated to be less than 18,513 pound for dairy herds and less than El 1,462 for beef herds, but with a range from 229 pound to 103,817 pound. The main cost was the slaughter of reactor cattle. For the majority of the farmers, the compensation payments seemed to meet most of the costs of their breakdowns, although a majority was still left with net losses.