Resumo:
Libya with its strategic location and natural resources stands as a crucial link between the Arab world, Europe, and Africa. The people of Libya have an optimistic outlook with regard to the Libyan economy after the suspension of the United Nations sanctions in 1999 that had been imposed on Libya in 1992, as well as the recent emphasis on privatization from the government. Since then, local and foreign investors have been encouraged to take a more prominent role in order to help privatize some of the state run-industries; the attention to privatization is aimed to help Libya’s economic growth and reduce its heavy dependency on oil revenues. Considering the economic situation, Libya is a rich country. However, it needs to modernize, it needs more and better infrastructure, it needs non-oil based financing, furthermore, it needs to develop a financial model for development and investment from the private sector. Although the Libyan government is working on the improvement of the business environment to make it more attractive for foreign investors in a way to move towards privatization, they have ignored some of the challenges that privatization will be facing in Libya. Privatization can not be implemented overnight. They have taken this for granted without careful consideration of its challenges. This paper attempts to investigate and discuss the challenges that need to be taken into account before privatization of infrastructure projects can be introduced in Libya. This paper is based on interviews with senior technical officials in the government.
Resumo:
This paper reports part of a qualitative study into evolving practice in the implementation of the Dispute Adjudication Board (DAB) construction dispute resolution technique, a variant of the Dispute Review Board (DRB) concept used in the US and Canada. Data was collected through a focus group interview of 20 highly experienced dispute resolution practitioners from engineering and the law. The group was assembled from members of FIDIC-NET with direct experience of project DABs. The part reported here concerns practice and procedure for establishing DABs. The main findings are that: constitution of the DABs is often delayed because of either project owners' ignorance of the DAB process or deterrence by the cost of the DABs; such owners also tend to insist on appointing DAB members from local engineers and lawyers without sufficient understanding of the DAB process; rates of remuneration of DAB members vary widely; the training provision for DAB membership and advocacy skills is inadequate; the process of selecting candidates for DAB membership and negotiating the tripartite agreement between each member and the contractual parties needs to be navigated with great care to avoid raising ethical problems. The research contribution is threefold. First, it highlights the importance of realistic fees for DAB members within a standard framework in achieving timely establishment of a board that works well as a team. Second, it illustrates the use of qualitative focus group interview to study the impact of new contract terms from multiple stakeholder perspectives. Finally, it identifies areas where further research is needed.
Resumo:
There is a lack of knowledge base in relation to experiences gained and lessons learnt from previously executed National Health Service (NHS) infrastructure projects in the UK. This is in part a feature of one-off construction projects, which typify healthcare infrastructure, and in part due to the absence of a suitable method for conveying such information. The complexity of infrastructure delivery process in the NHS makes the construction of healthcare buildings a formidable task. This is particularly the case for the NHS trusts who have little or no experience of construction projects. To facilitate understanding a most important aspect of the delivery process, which is the preparation of a capital investment proposal; steps taken in developing the business case for an NHS healthcare facility are examined. The context for such examination is provided by the planning process of a healthcare project, studied retrospectively. The process is analysed using a social science based method called ‘building stories’, developed at the University of California-Berkeley. By applying this method, stories or narratives are constructed around the data captured on the case study. The findings indicate that the business case process may be used to justify, rather than identify, trusts’ requirements. The study is useful for UK public sector clients as well as consultants and professionals who aim to participate in the delivery of healthcare infrastructure projects in the UK.
Resumo:
There is a renewed interest in immersive visualization to navigate digital data-sets associated with large building and infrastructure projects. Following work with a fully immersive visualization facility at the University, this paper details the development of a complementary mobile visualization environment. It articulates progress on the requirements for this facility; the overall design of hardware and software; and the laboratory testing and planning for user pilots in construction applications. Like our fixed facility, this new light-weight mobile solution enables a group of users to navigate a 3D model at a 1:1 scale and to work collaboratively with structured asset information. However it offers greater flexibility as two users can assemble and start using it at a new location within an hour. The solution has been developed and tested in a laboratory and will be piloted in engineering design review and stakeholder engagement applications on a major construction project.
Resumo:
The UK government is mandating the use of building information modelling (BIM) in large public projects by 2016. As a result, engineering firms are faced with challenges related to embedding new technologies and associated working practices for the digital delivery of major infrastructure projects. Diffusion of innovations theory is used to investigate how digital innovations diffuse across complex firms. A contextualist approach is employed through an in-depth case study of a large, international engineering project-based firm. The analysis of the empirical data, which was collected over a four-year period of close interaction with the firm, reveals parallel paths of diffusion occurring across the firm, where both the innovation and the firm context were continually changing. The diffusion process is traced over three phases: centralization of technology management, standardization of digital working practices, and globalization of digital resources. The findings describe the diffusion of a digital innovation as multiple and partial within a complex social system during times of change and organizational uncertainty, thereby contributing to diffusion of innovations studies in construction by showing a range of activities and dynamics of a non-linear diffusion process.
Resumo:
New skills are needed to compete, as integrated software solutions provide a digital infrastructure for projects. This changes the practice of information management and engineering design on next generation projects.
Resumo:
Data from civil engineering projects can inform the operation of built infrastructure. This paper captures lessons for such data handover, from projects into operations, through interviews with leading clients and their supply chain. Clients are found to value receiving accurate and complete data. They recognise opportunities to use high quality information in decision-making about capital and operational expenditure; as well as in ensuring compliance with regulatory requirements. Providing this value to clients is a motivation for information management in projects. However, data handover is difficult as key people leave before project completion; and different data formats and structures are used in project delivery and operations. Lessons learnt from leading practice include defining data requirements at the outset, getting operations teams involved early, shaping the evolution of interoperable systems and standards, developing handover processes to check data rather than documentation, and fostering skills to use and update project data in operations
Resumo:
This paper explores the apparent contradiction between the 'linearity' of most Sustainable Development projects, with time-bound and defined outputs achieved at a fixed cost, and an implied 'circularity' of the theory whereby there is no 'end'. Projects usually have clear parameters within which they are implemented, and the inclusion of elements such as the need for accountability, measurable impact and,value for money' have grown in importance. It could be argued that we live in a 'projectified' and therefore linear world. The paper explores the potential contradiction between 'linearity' and 'circularity', and suggests that one way around this is to frame the project within a form of the Kolb Learning Cycle heuristic. This will facilitate a rationalisation from those implementing the sustainable development project as to why decisions are being made and for whom. If these questions are opened up to the project stakeholders, including beneficiaries, then the Kolb cycle could encourage learning and understanding by all involved. It could also provide Sustainability Therapy to those trapped in processes, which they find orthogonal to their own perceptions. It is suggested that such learning, therapy and reflective practice should be a valid output of the sustainable development project, although typically the focus is only upon the final outputs and how they feed into policy. Ironically funders would be well advised to take a broader perspective in order to achieve true 'value for money' within such projects, even if learning is not an easily measurable or tangible outcome. These points are explored within the context of the wider literature and experience with a sustainable development project undertaken in Malta. (c) 2005 Elsevier Ltd. All rights reserved.
Resumo:
This paper constitutes an attempt to find a means to represent multiple stories in the strong narrative of conventional sustainable development (SD) projects. The authors' experience of such projects in various parts of the world indicates that they have a tendency to arise from and reflect a dominant mindset, placing the SD project in what can be a working environment that is inimical to the very ideals that SD is supposed to represent. Short-termism and value for money drive project formats and objectives, whilst counter-narratives and alternative stories arising from stakeholders in such projects are often ignored. Yet these alternative threads often contain strong SD messages of their own and could, if effectively utilized, enhance the SD project process. This paper sets out the case for a new field - 'project ethnography' - allied with the growing use of meta-analysis to compare project 'stories'. The analytical model applied to compare projects is based on the Kolb learning cycle and involves a (3 X 4)-fold questioning of project conceptual ization and roll-out. Copyright @ 2oo6 John Wiley & Sons, Ltd and ERP Environment.
Resumo:
Problem structuring methods or PSMs are widely applied across a range of variable but generally small-scale organizational contexts. However, it has been argued that they are seen and experienced less often in areas of wide ranging and highly complex human activity-specifically those relating to sustainability, environment, democracy and conflict (or SEDC). In an attempt to plan, track and influence human activity in SEDC contexts, the authors in this paper make the theoretical case for a PSM, derived from various existing approaches. They show how it could make a contribution in a specific practical context-within sustainable coastal development projects around the Mediterranean which have utilized systemic and prospective sustainability analysis or, as it is now known, Imagine. The latter is itself a PSM but one which is 'bounded' within the limits of the project to help deliver the required 'deliverables' set out in the project blueprint. The authors argue that sustainable development projects would benefit from a deconstruction of process by those engaged in the project and suggest one approach that could be taken-a breakout from a project-bounded PSM to an analysis that embraces the project itself. The paper begins with an introduction to the sustainable development context and literature and then goes on to illustrate the issues by grounding the debate within a set of projects facilitated by Blue Plan for Mediterranean coastal zones. The paper goes on to show how the analytical framework could be applied and what insights might be generated.
Resumo:
A systematic technique for identifying the environments of construction projects is described. It provides a method for isolating the major variables surrounding construction projects, and is briefly applied to the industries of Britain and Jamaica to illustrate its application. From this, it is inferred that the environment of a Jamaican construction project in systems terms is broadly similar to the environment of a construction project in Britain.