11 resultados para housing system
em CentAUR: Central Archive University of Reading - UK
Resumo:
Maize silage-based diets with three dietary crude protein (CP) supplements were offered to 96 finishing cattle of contrasting breed (Holstein Friesian (HF) v. Simmental x HF (SHF)) and gender (bull v. steer) housed in two types of feeding system (group fed v. individually fed). The three protein supplements differed either in CP or protein degradability (degradable (LUDP) v. rumen undegradable (HUDP)) and provided CP concentrations of 142 (Con), 175 (LUDP) and 179 (HUDP) g/kg dry matter (DM) respectively, with ratios of degradable to undegradable of 3.0, 1.4 and 0.9:1 for diets Con, LOP and HUDP respectively. DM intakes were marginally higher (P = 0. 102) for LOP when compared with Con and HOP Rates of daily live-weight gain (DLWG) were higher (P = 0.005) in LUDP and HOP when compared with Con. HF had higher DM intakes than SHF although this did not result in any improvement in HF DLWG. Bulls had significantly better DM intakes, DLWG and feed conversion efficiency than steers. Conformation scores were better in SHF than HF (P < 0.001) and fat scores lower in bulls than steers (p < 0.001). There was a number of first order interactions established between dietary treatment, breed, gender and housing system with respect to rates of gain and carcass fat scores.
Resumo:
In countries that have experienced rapid economic development, the need to establish more efficient markets in which private property can be constructed has induced some innovative solutions. One such solution is the phenomenon of a pre-sales market of the kind that can be observed in Taiwan, Korea, and more recently in China. Developers sell their property before building is started in order to acquire financing for the development companies. This paper discusses the process and, by recognising the analogy between the pre-sales market and forwards markets, analyses the implications for developers
Resumo:
A whole life-cycle information management vision is proposed, the organizational requirements for the realization of the scenario is investigated. Preliminary interviews with construction professionals are reported. Discontinuities at information transfer throughout life-cycle of built environments are resulting from lack of coordination and multiple data collection/storage practices. A more coherent history of these activities can improve the work practices of various teams by augmenting decision making processes and creating organizational learning opportunities. Therefore, there is a need for unifying these fragmented bits of data to create a meaningful, semantically rich and standardized information repository for built environment. The proposed vision utilizes embedded technologies and distributed building information models. Two diverse construction project types (large one-off design, small repetitive design) are investigated for the applicability of the vision. A functional prototype software/hardware system for demonstrating the practical use of this vision is developed and discussed. Plans for case-studies for validating the proposed model at a large PFI hospital and housing association projects are discussed.
Resumo:
São Paulo is one of Latin America’s most modern and developed cities, yet around one-third of its 10 million inhabitants live in poor-quality housing in sub-standard settlements. This paper describes the response of the São Paulo municipal government that took office in 2001. Through its Secretariat of Housing and Urban Development, it designed a new policy framework with a strong emphasis on improving the quantity and quality of housing for low-income groups. Supported by new legislation, financial instruments and partnerships with the private sector, the mainstays of the new policy are integrated housing and urban development, modernization of the administrative system, and public participation in all decision-making and implementation processes. The programmes centre on upgrading and legalizing land tenure in informal settlements, and regeneration of the city centre. The new focus on valuing the investments that low-income groups have already made in their housing and settlements has proved to be more cost-effective than previous interventions, leading to improvements on an impressive scale.
Resumo:
The time taken to consider development proposals within the English planning system continues to provoke great policy concern despite a decade of inquiry and policy change. The results of an extensive site-based survey and hedonic modelling exercise across 45 local authorities are reported here. The analysis reveals a slow, uncertain system. It identifies planning delay as a serious problem for housing supply and its ability to respond to increases in demand. Only a relatively limited set of factors seem relevant in explaining differences in times and the results suggest that 80% of councils’ performances are statistically indistinguishable from each other. These findings question the policy emphasis put on rankings of local authorities, though some influence from local politics is apparent. Development control is consistently a lengthy and uncertain process due to its complexity. Therefore, success in lowering planning delay is only likely through radical simplification.
Resumo:
The British system of development control is time-consuming and uncertain in outcome. Moreover, it is becoming increasingly overloaded as it has gradually switched away from being centred on a traditional ‘is it an appropriate land-use?’ type approach to one based on multi-faceted inspections of projects and negotiations over the distribution of the potential financial gains arising from them. Recent policy developments have centred on improving the operation of development control. This paper argues that more fundamental issues may be a stake as well. Important market changes have increased workloads. Furthermore, the UK planning system's institutional framework encourages change to move in specific directions, which is not always helpful. If expectations of increased long-term housing supply are to be met more substantial changes to development control may be essential but hard to achieve.
Resumo:
This paper summarises an initial report carried out by the Housing Business Research Group, of the University of Reading into Design and Build procurement and a number of research projects undertaken by the national federation of Housing Associations (NFHA), into their members' development programmes. The paper collates existing statistics from these sources and examines the way in which Design and Build procurement can be adapted for the provision of social housing. The paper comments on these changes and questions how risk averting the adopted strategies are in relation to long term housing business management issues arising from the quality of the product produced by the new system.
Resumo:
Using cluster analysis this study reveals significant heterogeneity in the institutional characteristics of European mortgage markets. Distinct clusters are formed which can be related to differences in the mortgage credit system, the relative importance of the owner-occupation and the property specific fiscal system. The paper then tests for multiple structural breaks. We find evidence that structural breaks in European housing markets often coincide with a changes in housing market policy.
Resumo:
The UK house building sector is facing dual pressures to expand supply, along with delivering against tougher Building Regulations’ requirements, predominantly in the areas of sustainability. A review of current literature has highlighted that the pressures the UK house building industry is currently under may be having a negative impact on build quality, causing an increase in defects. A review and synthesis of the current defect literature with respect to new-build housing and the wider construction sector has found that the prevailing emphasis is limited to the classification, causes, pathology and statistical analysis of defects. There is thus a need to better understand the overall impact of individual defects on key stakeholders within the new-build housing defect detection and remediation process. As part of ongoing research to develop and verify a defect impact assessment rating system, this paper seeks to contribute to our understanding of the impact of individual defects from a key stakeholder perspective by undertaking the literature review and synthesis phase. The literature review identifies the three distinct, but interrelated, dominant impact factors: cost, disruption, and health and safety. By pulling the strands of defect literature together the theoretical lens and key stakeholder sampling strategy is formed as the basis for the subsequent impact weighting development phase.
Resumo:
Rapid growth in the production of new homes in the UK is putting build quality under pressure as evidenced by an increase in the number of defects. Housing associations (HAs) contribute approximately 20% of the UK’s new housing supply. HAs are currently experiencing central government funding cuts and rental revenue reductions. As part of HAs’ quest to ramp up supply despite tight budget conditions, they are reviewing how they learn from defects. Learning from defects is argued as a means of reducing the persistent defect problem within the UK housebuilding industry, yet how HAs learn from defects is under-researched. The aim of this research is to better understand how HAs, in practice, learn from past defects to reduce the prevalence of defects in future new homes. The theoretical lens for this research is organizational learning. The results drawn from 12 HA case studies indicate that effective organizational learning has the potential to reduce defects within the housing sector. The results further identify that HAs are restricting their learning to focus primarily on reducing defects through product and system adaptations. Focusing on product and system adaptations alone suppresses HAs’ abilities to reduce defects in the future.