69 resultados para creative procurement
em CentAUR: Central Archive University of Reading - UK
Resumo:
The systems used for the procurement of buildings are organizational systems. They involve people in a series of strategic decisions, and a pattern of roles, responsibilities and relationships that combine to form the organizational structure of the project. To ensure effectiveness of the building team, this organizational structure needs to be contingent upon the environment within which the construction project takes place. In addition, a changing environment means that the organizational structure within a project needs to be responsive, and dynamic. These needs are often not satisfied in the construction industry, due to the lack of analytical tools with which to analyse the environment and to design appropriate temporary organizations. This paper presents two techniques. First is the technique of "Environmental Complexity Analysis", which identifies the key variables in the environment of the construction project. These are classified as Financial, Legal, Technological, Aesthetic and Policy. It is proposed that their identification will set the parameters within which the project has to be managed. This provides a basis for the project managers to define the relevant set of decision points that will be required for the project. The Environmental Complexity Analysis also identifies the project's requirements for control systems concerning Budget, Contractual, Functional, Quality and Time control. The process of environmental scanning needs to be done at regular points during the procurement process to ensure that the organizational structure is adaptive to the changing environment. The second technique introduced is the technique of "3R analysis", being a graphical technique for describing and modelling Roles, Responsibilities and Relationships. A list of steps is introduced that explains the procedure recommended for setting up a flexible organizational structure that is responsive to the environment of the project. This is by contrast with the current trend towards predetermined procurement paths that may not always be in the best interests of the client.
Resumo:
The origins of the various procurement methods in construction are considered, followed by a discussion of the circumstances for which each procurement system is best suited. The likely future development sin management-based methods are discussed in the context of current research, showing that co-ordination of trade and specialist contractors , more flexible contracting, constructive conflict management and a potential polarization of views about project management in the industry are likely.
Resumo:
Although much literature on construction procurement is based on personal experiences, there is little data available to undertake realistic comparison between regions or from one year to another. A survey was undertaken in the UK to examine the feasibility of developing a replicable survey technique that will enable longitudinal studies and international comparisons. The survey showed that a majority felt traditional procurement methods were inappropriate. However, traditional general contracting is still the most common form of procurement. There was strong agreement that economic muscle compels weaker contracting parties to accept onerous contractual terms. There is no relationship between the size of a project and its procurement method, contrary to popular belief. The findings indicate that wider surveys would generate useful data about attitudes.
Resumo:
The costs of procurement are transaction costs which are separate from the direct costs of a project. In this paper discussion is concentrated on costs of tendering. Types of cost, including money costs and opportunity costs, short-term and long-term costs, private and social costs are defined and examined in relation to various types of product and methods of procurement. The costs of the contractor and of the client are considered and tentative conclusions drawn as to who bears these costs in the short-run and in the long run. They may fall on the parties to the process for the particular project, on other contractors and clients or on society as a whole.
Resumo:
In developing techniques for monitoring the costs associated with different procurement routes, the central task is disentangling the various project costs incurred by organizations taking part in construction projects. While all firms are familiar with the need to analyse their own costs, it is unusual to apply the same kind of analysis to projects. The purpose of this research is to examine the claims that new ways of working such as strategic alliancing and partnering bring positive business benefits. This requires that costs associated with marketing, estimating, pricing, negotiation of terms, monitoring of performance and enforcement of contract are collected for a cross-section of projects under differing arrangements, and from those in the supply chain from clients to consultants, contractors, sub-contractors and suppliers. Collaboration with industrial partners forms the basis for developing a research instrument, based on time sheets, which will be relevant for all those taking part in the work. The signs are that costs associated with tendering are highly variable, 1-15%, depending upon what precisely is taken into account. The research to date reveals that there are mechanisms for measuring the costs of transactions and these will generate useful data for subsequent analysis.
Resumo:
This paper describes a novel methodology for observing and analysing collaborative design by using the concepts of cognitive dimensions related to concept-based misfit analysis. The study aims at gaining an insight into support for creative practice of graphical communication in collaborative design processes of designers while sketching within a shared white board and audio conferencing environment. Empirical data on design processes have been obtained from observation of groups of student designers solving an interior space-planning problem of a lounge-diner in a shared virtual environment. The results of the study provide recommendations for the design and development of interactive systems to support such collaborative design activities.
Resumo:
In a knowledge-based economy and dynamic work environment retaining competitiveness is increasingly dependent on creativity, skills, individual abilities and appropriate motivation. For instance, the UK government explicitly stated in the recent "Review of Employee Engagement and Investment" report that new ways are required through which British companies could boost employee engagement at work, improving staff commitment and, thereby, increase workplace productivity. Although creativity and innovation have been studied extensively, little is known about employees' intrinsic willingness to contribute novel ideas and solutions (defined here as creative participation). For instance, the same individual can thrive in one organisation but be completely isolated in another and the question is to what extent this depends on individual characteristics and organisational settings. The main aim of this research is, therefore, to provide a conceptual framework for identification of individual characteristics that influence employees' willingness to contribute new ideas. In order to achieve this aim the investigation will be based on a developed psychological experiment, and will include personal-profiling inventory and a questionnaire. Understanding how these parameters influence willingness of an individual to put forward created ideas would offer an opportunity for companies to improve motivation practices and team efficiency, and can consequently lead to better overall performance.
Resumo:
Rural land managers need access to sound advice and information to respond to pressures from environmental regulations, declining farm incomes, changing patterns in international trade and new institutional arrangements within the domestic food chain. Governments have cut back their provision of advisory services but need more than ever to influence land managers' decisions to achieve a growing array of policy objectives: The paper develops a conceptual framework for analysing advisory services and concludes, through a review of sixteen case studies, that the needs of both governments and land managers can be met by a diverse mixture of private and public sector provision. (C) 2003 Elsevier Ltd. All rights reserved.
Resumo:
Collaborative working methods offer the hope of reduced waste, lower tendering costs and improved outputs. The costs of tendering may be influenced by the introduction of different working methods. Transaction cost economics appears to offer an analytical framework for studying the costs of tendering, but it is more to do with providing explanations at the institutional/industry level, not at the level of individual projects. Surveys and interviews were carried out with small samples in UK. The data show that that while tendering costs are not necessarily higher in collaborative working arrangements, there is no correlation between costs of tendering and the way the work is organized. Practitioners perceive that the benefits of working in collaborative procurement routes far outweigh the costs. Tendering practices can be improved to avoid waste, and the suggested improvements include restricting selective tendering lists to 23 bidders, letting bidders know who they are competing with, reimbursing tendering costs for aborted projects and ensuring that timely and comprehensive information is provided to bidders.