8 resultados para cost planning

em CentAUR: Central Archive University of Reading - UK


Relevância:

30.00% 30.00%

Publicador:

Resumo:

Planning a project with proper considerations of all necessary factors and managing a project to ensure its successful implementation will face a lot of challenges. Initial stage in planning a project for bidding a project is costly, time consuming and usually with poor accuracy on cost and effort predictions. On the other hand, detailed information for previous projects may be buried in piles of archived documents which can be increasingly difficult to learn from the previous experiences. Project portfolio has been brought into this field aiming to improve the information sharing and management among different projects. However, the amount of information that could be shared is still limited to generic information. This paper, we report a recently developed software system COBRA to automatically generate a project plan with effort estimation of time and cost based on data collected from previous completed projects. To maximise the data sharing and management among different projects, we proposed a method of using product based planning from PRINCE2 methodology. (Automated Project Information Sharing and Management System -�COBRA) Keywords: project management, product based planning, best practice, PRINCE2

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper tackles the problem of computing smooth, optimal trajectories on the Euclidean group of motions SE(3). The problem is formulated as an optimal control problem where the cost function to be minimized is equal to the integral of the classical curvature squared. This problem is analogous to the elastic problem from differential geometry and thus the resulting rigid body motions will trace elastic curves. An application of the Maximum Principle to this optimal control problem shifts the emphasis to the language of symplectic geometry and to the associated Hamiltonian formalism. This results in a system of first order differential equations that yield coordinate free necessary conditions for optimality for these curves. From these necessary conditions we identify an integrable case and these particular set of curves are solved analytically. These analytic solutions provide interpolating curves between an initial given position and orientation and a desired position and orientation that would be useful in motion planning for systems such as robotic manipulators and autonomous-oriented vehicles.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper studies the effects of increasing formality via tax reduction and simplification schemes on micro-firm performance. It uses the 1997 Brazilian SIMPLES program. We develop a simple theoretical model to show that SIMPLES has an impact only on a segment of the micro-firm population, for which the effect of formality on firm performance can be identified, and that can be analyzed along the single dimensional quantiles of the conditional firm revenues. To estimate the effect of formality, we use an econometric approach that compares eligible and non-eligible firms, born before and after SIMPLES in a local interval about the introduction of SIMPLES. We use an estimator that combines both quantile regression and the regression discontinuity identification strategy. The empirical results corroborate the positive effect of formality on microfirms' performance and produce a clear characterization of who benefits from these programs.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Due to the requirement to demonstrate financial feasibility of policy proposals and scheme-specific planning obligations, development viability and development appraisal have become core themes in the English planning system. The objective of this paper is to evaluate the application of development appraisal in practice. The paper reviews the literature and the models available to assess the viability of development and analyses a sample 19 development viability appraisals to identify practice. The paper concludes that the practice of development appraisal deviates significantly from the tenets of capital budgeting theory. In particular, in addition to a propensity to oversimplify the timing of income and expenditure, the way in which debt, developer’s return and value and cost change are handled in practice illustrates a major gap between mainstream capital budgeting theory and development appraisal in practice.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Area-wide development viability appraisals are undertaken to determine the economic feasibility of policy targets in relation to planning obligations. Essentially, development viability appraisals consist of a series of residual valuations of hypothetical development sites across a local authority area at a particular point in time. The valuations incorporate the estimated financial implications of the proposed level of planning obligations. To determine viability the output land values are benchmarked against threshold land value and therefore the basis on which this threshold is established and the level at which it is set is critical to development viability appraisal at the policy-setting (area-wide) level. Essentially it is an estimate of the value at which a landowner would be prepared to sell. If the estimated site values are higher than the threshold land value the policy target is considered viable. This paper investigates the effectiveness of existing methods of determining threshold land value. They will be tested against the relationship between development value and costs. Modelling reveals that threshold land value that is not related to shifts in development value renders marginal sites unviable and fails to collect proportionate planning obligations from high value/low cost sites. Testing the model against national average house prices and build costs reveals the high degree of volatility in residual land values over time and underlines the importance of making threshold land value relative to the main driver of this volatility, namely development value.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

One of the most challenging tasks in financial management for large governmental and industrial organizations is Planning and Budgeting (P&B). The processes involved with P&B are cost and time intensive, especially when dealing with uncertainties and budget adjustments during the planning horizon. This work builds on our previous research in which we proposed and evaluated a fuzzy approach that allows optimizing the budget interactively beyond the initial planning stage. In this research we propose an extension that handles financial stress (i.e. drastic budget cuts) occurred during the budget period. This is done by introducing fuzzy stress parameters which are used to re-distribute the budget in order to minimize the negative impact of the financial stress. The benefits and possible issues of this approach are analyzed critically using a real world case study from the Nuremberg Institute of Technology (NIT). Additionally, ongoing and future research directions are presented.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Unorganized traffic is a generalized form of travel wherein vehicles do not adhere to any predefined lanes and can travel in-between lanes. Such travel is visible in a number of countries e.g. India, wherein it enables a higher traffic bandwidth, more overtaking and more efficient travel. These advantages are visible when the vehicles vary considerably in size and speed, in the absence of which the predefined lanes are near-optimal. Motion planning for multiple autonomous vehicles in unorganized traffic deals with deciding on the manner in which every vehicle travels, ensuring no collision either with each other or with static obstacles. In this paper the notion of predefined lanes is generalized to model unorganized travel for the purpose of planning vehicles travel. A uniform cost search is used for finding the optimal motion strategy of a vehicle, amidst the known travel plans of the other vehicles. The aim is to maximize the separation between the vehicles and static obstacles. The search is responsible for defining an optimal lane distribution among vehicles in the planning scenario. Clothoid curves are used for maintaining a lane or changing lanes. Experiments are performed by simulation over a set of challenging scenarios with a complex grid of obstacles. Additionally behaviours of overtaking, waiting for a vehicle to cross and following another vehicle are exhibited.