7 resultados para continuous improvement
em CentAUR: Central Archive University of Reading - UK
Resumo:
Studies of construction labour productivity have revealed that limited predictability and multi-agent social complexity make long-range planning of construction projects extremely inaccurate. Fire-fighting, a cultural feature of construction project management, social and structural diversity of involved permanent organizations, and structural temporality all contribute towards relational failures and frequent changes. The main purpose of this paper is therefore to demonstrate that appropriate construction planning may have a profound synergistic effect on structural integration of a project organization. Using the general systems theory perspective it is further a specific objective to investigate and evaluate organizational effects of changes in planning and potentials for achieving continuous project-organizational synergy. The newly developed methodology recognises that planning should also represent a continuous, improvement-leading driving force throughout a project. The synergistic effect of the process planning membership duality fostered project-wide integration, eliminated internal boundaries, and created a pool of constantly upgrading knowledge. It maintained a creative environment that resulted in a number of process-related improvements from all parts of the organization. As a result labour productivity has seen increases of more than 30%, profits have risen from an average of 12% to more than 18%, and project durations have been reduced by several days.
Resumo:
Planning is a vital element of project management but it is still not recognized as a process variable. Its objective should be to outperform the initially defined processes, and foresee and overcome possible undesirable events. Detailed task-level master planning is unrealistic since one cannot accurately predict all the requirements and obstacles before work has even started. The process planning methodology (PPM) has thus been developed in order to overcome common problems of the overwhelming project complexity. The essential elements of the PPM are the process planning group (PPG), including a control team that dynamically links the production/site and management, and the planning algorithm embodied within two continuous-improvement loops. The methodology was tested on a factory project in Slovenia and in four successive projects of a similar nature. In addition to a number of improvement ideas and enhanced communication, the applied PPM resulted in 32% higher total productivity, 6% total savings and created a synergistic project environment.
Resumo:
Most existing crop scheduling models are cultivar specific and are developed using academic resources. As such they rarely meet the particular needs of a grower. A series of protocols have been created to generate effective schedules for a changing product range using data generated on site at a commercial nursery. A screening programme has been developed to help determine a cultivar's photoperiod sensitivity and vernalisation requirement. Experimental conditions were obtained using a cold store facility set to 5degreesC and photoperiod cloches. Eight and 16 hour photoperiod treatments were achieved at low cost by growing plants in cloches of opaque plastic with a motorised rolling screen. Natural light conditions were extended where necessary using a high pressure sodium lamp. Batches of plants were grown according to different schedules based on these treatments. The screening programme found Coreopsis grandiflora 'Flying Saucers' to be a long day plant. Data to form the basis of graphical tracks was taken using variations on commercial schedules. The work provides a nursery based approach to the continuous improvement of crop scheduling practises.
Resumo:
Innovation is notoriously difficult to define and is invariably intertwined with issues of knowledge creation, continuous improvement and organisational change. An extensive literature classifies numerous types of innovation and militates against any simplistic attempt at definition. It is widely accepted that innovation is at least partly dependent upon the surrounding environment. Industry recipes and institutionally embedded practices shape the environment within which innovation occurs. Recent research directions have addressed the diffusion of innovation and its dependence upon social and institutional structures. In this respect, it is highly pertinent to compare the way that innovation is interpreted and enacted in different industrial sectors. The comparison between UK aerospace and construction is especially revealing because the two sectors are so different and therefore constitute radically different climates for innovation. Empirical research is reported based on semi-structured interviews with practitioners from both sectors. Interpretations of innovation are found to differ dramatically between aerospace and construction. Within the context of an ongoing struggle to define innovation, both industries are striving to become more innovative. The aerospace sector is found to emphasise technical innovation whereas the construction sector emphasises process innovation. An overriding cultural bias in Western economies towards technological innovation results in the common perception that aerospace is much more innovative than construction. The experienced realities of practitioners in the two sectors are much more complex.
Resumo:
Successful knowledge transfer is an important process which requires continuous improvement in today’s knowledge-intensive economy. However, improving knowledge transfer processes represents a challenge for construction practitioners due to the complexity of knowledge acquisition, codification and sharing. Although knowledge transfer is context based, understanding the critical success factors can lead to improvements in the transfer process. This paper seeks to identify and evaluate the most significant critical factors for improving knowledge transfer processes in Public Private Partnerships/Private Finance Initiatives (PPP/PFI) projects. Drawing upon a questionnaire survey of 52 construction firms located in the UK, data is analysed using Severity Index (SI) and Coefficient of Variation (COV), to examine and identify these factors in PPP/PFI schemes. The findings suggest that a supportive leadership, participation/commitment from the relevant parties, and good communication between the relevant parties are crucial to improving knowledge transfer processes in PFI schemes. Practitioners, managers and researchers can use the findings to efficiently design performance measures for analysing and improving knowledge transfer processes.
Resumo:
Aircraft Maintenance, Repair and Overhaul (MRO) feedback commonly includes an engineer’s complex text-based inspection report. Capturing and normalizing the content of these textual descriptions is vital to cost and quality benchmarking, and provides information to facilitate continuous improvement of MRO process and analytics. As data analysis and mining tools requires highly normalized data, raw textual data is inadequate. This paper offers a textual-mining solution to efficiently analyse bulk textual feedback data. Despite replacement of the same parts and/or sub-parts, the actual service cost for the same repair is often distinctly different from similar previously jobs. Regular expression algorithms were incorporated with an aircraft MRO glossary dictionary in order to help provide additional information concerning the reason for cost variation. Professional terms and conventions were included within the dictionary to avoid ambiguity and improve the outcome of the result. Testing results show that most descriptive inspection reports can be appropriately interpreted, allowing extraction of highly normalized data. This additional normalized data strongly supports data analysis and data mining, whilst also increasing the accuracy of future quotation costing. This solution has been effectively used by a large aircraft MRO agency with positive results.