19 resultados para construction-specific indices

em CentAUR: Central Archive University of Reading - UK


Relevância:

90.00% 90.00%

Publicador:

Resumo:

Anticipating the future is increasingly being seen as a useful way to align, direct and improve current organizational strategy. Several such 'future studies' have been produced which envision various construction industry scenarios which result from technological and socio-economic trends and influences. Thirteen construction-related future studies are critically reviewed. Most studies fail to address the complexities and uncertainties of both the present and the future, and fail to explore the connections between global, local, construction-specific and more widespread factors. The methodological approaches used in these studies do not generate any significantly different advice or recommendations for the industry than those emerging from the much larger canon of non-future oriented construction research. As such, these reports are less about the future than the present. If future studies are to make a worthwhile contribution to construction, it is critical that they develop our appreciation of the practical ability of stakeholders to influence some aspects of the future and not others, and an awareness of the competing agendas and the relative benefits and disadvantages of specific futures within the construction sector. Only then can future studies provide insights and help in preparing for the opportunities and threats the future may bring.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

This paper examines the impact of changes in the composition of real estate stock indices, considering companies both joining and leaving the indices. Stocks that are newly included not only see a short-term increase in their share price, but trading volumes increase in a permanent fashion following the event. This highlights the importance of indices in not only a benchmarking context but also in enhancing investor awareness and aiding liquidity. By contrast, as anticipated, the share prices of firms removed from indices fall around the time of the index change. The fact that the changes in share prices, either upwards for index inclusions or downwards for deletions, are generally not reversed, would indicate that the movements are not purely due to price pressure, but rather are more consistent with the information content hypothesis. There is no evidence, however, that index changes significantly affect the volatility of price changes or their operating performances as measured by their earnings per share.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The context of construction management (CM) reveals that this method of procurement is as much a management philosophy as a contract structure. It is important to consider legal and contractual issues in this context. The interplay between management and law is complex and often misunderstood. Before considering specific issues, the use of contractual remedies in business agreements is discussed. In addition, the extent to which standardising a form of contract detracts or contributes to the success of projects is also considered. The dearth of judicial decisions, and the lack of a standard form, render it difficult to be specific about legal issues. Therefore, the main discussion of legal issues is centred around a recently completed research project which involved eliciting the views of a cross-section of experienced construction management clients, consultants and trade contractors. These interviews are used as the basis for highlighting some of the most important legal points to consider when setting up CM projects. The interviews revealed that the advantage of CM is the proximity of the client to the trade contractors and the disadvantage is that it depends on a high degree of professionalism and experience; qualities which are unfortunately difficult to find in the UK construction industry.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Standard form contracts are typically developed through a negotiated consensus, unless they are proffered by one specific interest group. Previously published plans of work and other descriptions of the processes in construction projects tend to focus on operational issues, or they tend to be prepared from the point of view of one or other of the dominant interest groups. Legal practice in the UK permits those who draft contracts to define their terms as they choose. There are no definitive rulings from the courts that give an indication as to the detailed responsibilities of project participants. The science of terminology offers useful guidance for discovering and describing terms and their meanings in their practical context, but has never been used for defining terms for responsibilities of participants in the construction project management process. Organizational analysis enables the management task to be deconstructed into its elemental parts in order that effective organizational structures can be developed. Organizational mapping offers a useful technique for reducing text-based descriptions of project management roles and responsibilities to a comparable basis. Research was carried out by means of a desk study, detailed analysis of nine plans of work and focus groups representing all aspects of the construction industry. No published plan of work offers definitive guidance. There is an enormous amount of variety in the way that terms are used for identifying responsibilities of project participants. A catalogue of concepts and terms (a “Terminology”) has been compiled and indexed to enable those who draft contracts to choose the most appropriate titles for project participants. The purpose of this terminology is to enable the selection and justification of appropriate terms in order to help define roles. The terminology brings an unprecedented clarity to the description of roles and responsibilities in construction projects and, as such, will be helpful for anyone seeking to assemble a team and specify roles for project participants.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Context: Learning can be regarded as knowledge construction in which prior knowledge and experience serve as basis for the learners to expand their knowledge base. Such a process of knowledge construction has to take place continuously in order to enhance the learners’ competence in a competitive working environment. As the information consumers, the individual users demand personalised information provision which meets their own specific purposes, goals, and expectations. Objectives: The current methods in requirements engineering are capable of modelling the common user’s behaviour in the domain of knowledge construction. The users’ requirements can be represented as a case in the defined structure which can be reasoned to enable the requirements analysis. Such analysis needs to be enhanced so that personalised information provision can be tackled and modelled. However, there is a lack of suitable modelling methods to achieve this end. This paper presents a new ontological method for capturing individual user’s requirements and transforming the requirements onto personalised information provision specifications. Hence the right information can be provided to the right user for the right purpose. Method: An experiment was conducted based on the qualitative method. A medium size of group of users participated to validate the method and its techniques, i.e. articulates, maps, configures, and learning content. The results were used as the feedback for the improvement. Result: The research work has produced an ontology model with a set of techniques which support the functions for profiling user’s requirements, reasoning requirements patterns, generating workflow from norms, and formulating information provision specifications. Conclusion: The current requirements engineering approaches provide the methodical capability for developing solutions. Our research outcome, i.e. the ontology model with the techniques, can further enhance the RE approaches for modelling the individual user’s needs and discovering the user’s requirements.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Heat waves are expected to increase in frequency and magnitude with climate change. The first part of a study to produce projections of the effect of future climate change on heat-related mortality is presented. Separate city-specific empirical statistical models that quantify significant relationships between summer daily maximum temperature (T max) and daily heat-related deaths are constructed from historical data for six cities: Boston, Budapest, Dallas, Lisbon, London, and Sydney. ‘Threshold temperatures’ above which heat-related deaths begin to occur are identified. The results demonstrate significantly lower thresholds in ‘cooler’ cities exhibiting lower mean summer temperatures than in ‘warmer’ cities exhibiting higher mean summer temperatures. Analysis of individual ‘heat waves’ illustrates that a greater proportion of mortality is due to mortality displacement in cities with less sensitive temperature–mortality relationships than in those with more sensitive relationships, and that mortality displacement is no longer a feature more than 12 days after the end of the heat wave. Validation techniques through residual and correlation analyses of modelled and observed values and comparisons with other studies indicate that the observed temperature–mortality relationships are represented well by each of the models. The models can therefore be used with confidence to examine future heat-related deaths under various climate change scenarios for the respective cities (presented in Part 2).

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This article assesses the extent to which sampling variation affects findings about Malmquist productivity change derived using data envelopment analysis (DEA), in the first stage by calculating productivity indices and in the second stage by investigating the farm-specific change in productivity. Confidence intervals for Malmquist indices are constructed using Simar and Wilson's (1999) bootstrapping procedure. The main contribution of this article is to account in the second stage for the information in the second stage provided by the first-stage bootstrap. The DEA SEs of the Malmquist indices given by bootstrapping are employed in an innovative heteroscedastic panel regression, using a maximum likelihood procedure. The application is to a sample of 250 Polish farms over the period 1996 to 2000. The confidence intervals' results suggest that the second half of 1990s for Polish farms was characterized not so much by productivity regress but rather by stagnation. As for the determinants of farm productivity change, we find that the integration of the DEA SEs in the second-stage regression is significant in explaining a proportion of the variance in the error term. Although our heteroscedastic regression results differ with those from the standard OLS, in terms of significance and sign, they are consistent with theory and previous research.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Firms form consortia in order to win contracts. Once a project has been awarded to a consortium each member then concentrates on his or her own contract with the client. Therefore, consortia are marketing devices, which present the impression of teamworking, but the production process is just as fragmented as under conventional procurement methods. In this way, the consortium forms a barrier between the client and the actual construction production process. Firms form consortia, not as a simple development of normal ways of working, but because the circumstances for specific projects make it a necessary vehicle. These circumstances include projects that are too large or too complex to undertake alone or projects that require on-going services which cannot be provided by the individual firms inhouse. It is not a preferred way of working, because participants carry extra risk in the form of liability for the actions of their partners in the consortium. The behaviour of members of consortia is determined by their relative power, based on several factors, including financial commitment and ease of replacement. The level of supply chain visibility to the public sector client and to the industry is reduced by the existence of a consortium because the consortium forms an additional obstacle between the client and the firms undertaking the actual construction work. Supply chain visibility matters to the client who otherwise loses control over the process of construction or service provision, while remaining accountable for cost overruns. To overcome this separation there is a convincing argument in favour of adopting the approach put forward in the Project Partnering Contract 2000 (PPC2000) Agreement. Members of consortia do not necessarily go on to work in the same consortia again because members need to respond flexibly to opportunities as and when they arise. Decision-making processes within consortia tend to be on an ad hoc basis. Construction risk is taken by the contractor and the construction supply chain but the reputational risk is carried by all the firms associated with a consortium. There is a wide variation in the manner that consortia are formed, determined by the individual circumstances of each project; its requirements, size and complexity, and the attitude of individual project leaders. However, there are a number of close working relationships based on generic models of consortia-like arrangements for the purpose of building production, such as the Housing Corporation Guidance Notes and the PPC2000.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Managing a construction project supply chain effectively and efficiently is extremely difficult due to involvement of numerous sectors that are supported by ineffective communication system. An efficient construction supply chain system ensures the delivery of materials and other services to construction site while minimising costs and rewarding all sectors based on value added to the supply chain. The advancement of information, communication and wireless technologies is driving construction companies to deploy supply chain management strategies to seek better outputs. As part of the emerging wireless technologies, contextaware computing capability represents the next generation of ICT to the construction services. Conceptually, context-awareness could be integrated with Web Services in order to ensure the delivery of pertinent information to construction site and enhance construction supply chain collaboration. An initial study has indicated that this integrated system has the potential of serving and improving the construction services delivery through access to context-specific data, information and services on as-needed basis.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The construction industry has incurred a considerable amount of waste as a result of poor logistics supply chain network management. Therefore, managing logistics in the construction industry is critical. An effective logistic system ensures delivery of the right products and services to the right players at the right time while minimising costs and rewarding all sectors based on value added to the supply chain. This paper reports on an on-going research study on the concept of context-aware services delivery in the construction project supply chain logistics. As part of the emerging wireless technologies, an Intelligent Wireless Web (IWW) using context-aware computing capability represents the next generation ICT application to construction-logistics management. This intelligent system has the potential of serving and improving the construction logistics through access to context-specific data, information and services. Existing mobile communication deployments in the construction industry rely on static modes of information delivery and do not take into account the worker’s changing context and dynamic project conditions. The major problems in these applications are lack of context-specificity in the distribution of information, services and other project resources, and lack of cohesion with the existing desktop based ICT infrastructure. The research works focus on identifying the context dimension such as user context, environmental context and project context, selection of technologies to capture context-parameters such wireless sensors and RFID, selection of supporting technologies such as wireless communication, Semantic Web, Web Services, agents, etc. The process of integration of Context-Aware Computing and Web-Services to facilitate the creation of intelligent collaboration environment for managing construction logistics will take into account all the necessary critical parameters such as storage, transportation, distribution, assembly, etc. within off and on-site project.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Services are very important to the UK balance of trade; a surplus has been recorded for trade in services every year since 1966. Construction professional services exports (CPS), which cover architecture, engineering and surveying (AES), have also increased, contributing over £3bn to the UK trade balance in 2007. The changing environment of construction professional services exports complicates the validity of the characteristics and definitions of services as described in the research literature and official export statistics. Through semi-structured interviews undertaken with large consulting engineers and a round-table discussion with industry and government representatives, the research found that the impact of globalisation and the changes in the construction business environment, such as increasing foreign ownership and changing forms of procurement, are not fully reflected in the official statistics. There have also been rapid changes in technology, procurement and methods of delivery which have impacted exporting AES firms and a more appropriate set of characteristics is needed to better reflect the project-specific and knowledge-intensive nature of AES firms.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

We explore the contribution of socio-technical networks approaches to construction management research. These approaches are distinctive for their analysis of actors and objects as mutually constituted within socio-technical networks. They raise questions about the ways in which the content, meaning and use of technology is negotiated in practice, how particular technical configurations are elaborated in response to specific problems and why certain paths or solutions are adopted rather than others. We illustrate this general approach with three case studies: a historical study of the development of reinforced concrete in France, the UK and the US, the recent introduction of 3D-CAD software into four firms and an analysis of the uptake of environmental assessment technologies in the UK since 1990. In each we draw out the ways in which various technologies shaped and were shaped by different socio-technical networks. We conclude with a reflection on the contributions of socio-technical network analysis for more general issues including the study of innovation and analyses of context and power.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Genetic algorithms (GAs) have been introduced into site layout planning as reported in a number of studies. In these studies, the objective functions were defined so as to employ the GAs in searching for the optimal site layout. However, few studies have been carried out to investigate the actual closeness of relationships between site facilities; it is these relationships that ultimately govern the site layout. This study has determined that the underlying factors of site layout planning for medium-size projects include work flow, personnel flow, safety and environment, and personal preferences. By finding the weightings on these factors and the corresponding closeness indices between each facility, a closeness relationship has been deduced. Two contemporary mathematical approaches - fuzzy logic theory and an entropy measure - were adopted in finding these results in order to minimize the uncertainty and vagueness of the collected data and improve the quality of the information. GAs were then applied to searching for the optimal site layout in a medium-size government project using the GeneHunter software. The objective function involved minimizing the total travel distance. An optimal layout was obtained within a short time. This reveals that the application of GA to site layout planning is highly promising and efficient.