Iso-score curves graph (iSCG) and mathematical relationships between Scoring Parameters (SP) and Forecasting Parameters (FP) can be used in Economic Scoring Formulas (ESF) used in tendering to distribute the score among bidders in the economic part of a proposal. Each contracting authority must set an ESF when publishing tender specifications and the strategy of each bidder will differ depending on the ESF selected and the weight of the overall proposal scoring. The various mathematical relationships and density distributions that describe the main SPs and FPs, and the representation of tendering data by means of iSCGs, enable the generation of two new types of graphs that can be very useful for bidders who want to be more competitive: the scoring and position probability graphs.
Resumo:
The present work describes a new tool that helps bidders improve their competitive bidding strategies. This new tool consists of an easy-to-use graphical tool that allows the use of more complex decision analysis tools in the field of Competitive Bidding. The graphic tool described here tries to move away from previous bidding models which attempt to describe the result of an auction or a tender process by means of studying each possible bidder with probability density functions. As an illustration, the tool is applied to three practical cases. Theoretical and practical conclusions on the great potential breadth of application of the tool are also presented.
Resumo:
In the global construction context, the best value or most economically advantageous tender is becoming a widespread approach for contractor selection, as an alternative to other traditional awarding criteria such as the lowest price. In these multi-attribute tenders, the owner or auctioneer solicits proposals containing both a price bid and additional technical features. Once the proposals are received, each bidder’s price bid is given an economic score according to a scoring rule, generally called an economic scoring formula (ESF) and a technical score according to pre-specified criteria. Eventually, the contract is awarded to the bidder with the highest weighted overall score (economic + technical). However, economic scoring formula selection by auctioneers is invariably and paradoxically a highly intuitive process in practice, involving few theoretical or empirical considerations, despite having been considered traditionally and mistakenly as objective, due to its mathematical nature. This paper provides a taxonomic classification of a wide variety of ESFs and abnormally low bids criteria (ALBC) gathered in several countries with different tendering approaches. Practical implications concern the optimal design of price scoring rules in construction contract tenders, as well as future analyses of the effects of the ESF and ALBC on competitive bidding behaviour.
Resumo:
A proper method to assess contractor competitiveness is important both for assisting clients in the selection of proper contractors and for assisting contractors in the development of more competitive bidding strategies. Previous studies have identified various indicators for assessing contractor competitiveness, and several assessment methods have been introduced. Nevertheless, these studies are limited because they are unable to tell which indicators are more important in different market environments. This paper identifies the key competitiveness indicators �KCIs� for assessing contractor competitiveness in the Chinese construction market. An index value is used to indicate the relative significance of various competitiveness indicators based on which KCIs are identified. The data applied in this study are from a survey of the construction industry in mainland China. The research findings provide valuable information for both existing businesses and the construction professionals who plan to compete for construction works in the Chinese market. The study provides useful references for further studies that compare the KCIs used in the Chinese construction industry and those used in other construction industries.
Resumo:
A case study on the tendering process and cost/time performance of a public building project in Ghana is conducted. Competitive bids submitted by five contractors for the project, in which contractors were required to prepare their own quantities, were analyzed to compare differences in their pricing levels and risk/requirement perceptions. Queries sent to the consultants at the tender stage were also analyzed to identify the significant areas of concern to contractors in relation to the tender documentation. The five bidding prices were significantly different. The queries submitted for clarifications were significantly different, although a few were similar. Using a before-and-after experiment, the expected cost/time estimate at the start of the project was compared to the actual cost/time values, i.e. what happened in the actual construction phase. The analysis showed that the project exceeded its expected cost by 18% and its planned time by 210%. Variations and inadequate design were the major reasons. Following an exploration of these issues, an alternative tendering mechanism is recommended to clients. A shift away from the conventional approach of awarding work based on price, and serious consideration of alternative procurement routes can help clients in Ghana obtain better value for money on their projects.
Resumo:
This paper considers how the delivery of public leisure services in Britain has been affected by the imposition of Compulsory Competitive Tendering (CCT) on the management of facilities. In particular, it focuses on the changing relationship between the central and local levels of government, theorising a tripartite local response to CCT, incorporating local statism, post-Fordist rejection of CCT and post- Fordist compliance with the aims of the central administration. The paper then discusses the actual implementation of CCT, relating the theorised responses to those witnessed in practice. This results in the delineation of a continuum of stances, ranging from pragmatic forms of local statism, such as the protection of the former direct labour force, to centrist attempts to combine the ethics of socialism with the mechanics of the market, to an outright rejection of state organisation and control. The paper concludes that although legitimate attempts have been made to protect local services, the outcome of the CCT process has undoubtedly been the regeneration of public leisure provision away from its service roots towards a market model of provision.
Resumo:
Although much has been written about the effect on services of public sector restructuring, little is yet available on public leisure provision. This omission is addressed by considering how the delivery of public leisure services in Britain has been affected by the imposition of Compulsory Competitive Tendering (CCT). In particular, it focuses on the changing relationship between the central and local levels of government recognising, on the part of local government, a continuum of structural responses to central initiatives which have, in some cases, conspired to reduce the impact of CCT on public leisure provision. The paper concludes that although attempts have been made to protect local services, the outcome of the CCT process has been the regeneration of public leisure provision away from its service roots, but within an enduring ideological paradigm of conservative professionalism.
Resumo:
Identification of cost-determinant variables and evaluation of their degree of influence play an essential role in building reliable cost models and enhance the competitive edge of quantity surveyors as well as contracting organisations. Sixty-seven variables affecting pre-tender construction cost estimates are identified through literature and interviews. These factors are grouped into six categories and a comparison analysis of their impact is conducted. Priority ranking of cost-influencing factors is carried out using a questionnaire survey commissioned amongst quantity surveyors based in the UK. Findings of this survey indicate that there is a strong agreement between quantity surveyors in ranking cost-influencing factors of construction projects. Comparisons between the outcomes of this research and other related studies are presented.
Resumo:
Currently, multi-attribute auctions are becoming widespread awarding mechanisms for contracts in construction, and in these auctions, criteria other than price are taken into account for ranking bidder proposals. Therefore, being the lowest-price bidder is no longer a guarantee of being awarded, thus increasing the importance of measuring any bidder’s performance when not only the first position (lowest price) matters. Modeling position performance allows a tender manager to calculate the probability curves related to the more likely positions to be occupied by any bidder who enters a competitive auction irrespective of the actual number of future participating bidders. This paper details a practical methodology based on simple statistical calculations for modeling the performance of a single bidder or a group of bidders, constituting a useful resource for analyzing one’s own success while benchmarking potential bidding competitors.
Resumo:
This paper examines the extent to which engineers can influence the competitive behavior of bidders in Best Value or multi-attribute construction auctions, where both the (dollar) bid and technical non-price criteria are scored according to a scoring rule. From a sample of Spanish construction auctions with a variety of bid scoring rules, it is found that bidders are influenced by the auction rules in significant and predictable ways. The bid score weighting, bid scoring formula and abnormally low bid criterion are variables likely to influence the competitiveness of bidders in terms of both their aggressive/conservative bidding and concentration/dispersion of bids. Revealing the influence of the bid scoring rules and their magnitude on bidders’ competitive behavior opens the door for the engineer to condition bidder competitive behavior in such a way as to provide the balance needed to achieve the owner’s desired strategic outcomes.
Resumo:
The basic premise of transaction-cost theory is that the decision to outsource, rather than to undertake work in-house, is determined by the relative costs incurred in each of these forms of economic organization. In construction the "make or buy" decision invariably leads to a contract. Reducing the costs of entering into a contractual relationship (transaction costs) raises the value of production and is therefore desirable. Commonly applied methods of contractor selection may not minimise the costs of contracting. Research evidence suggests that although competitive tendering typically results in the lowest bidder winning the contract this may not represent the lowest project cost after completion. Multi-parameter and quantitative models for contractor selection have been developed to identify the best (or least risky) among bidders. A major area in which research is still needed is in investigating the impact of different methods of contractor selection on the costs of entering into a contract and the decision to outsource.
Resumo:
The cost of tendering in the construction industry is widely suspected to be excessive, but there is little robust empirical evidence to demonstrate this. It also seems that innovative working practices may reduce the costs of undertaking construction projects and the consequent improvement in relationships should increase overall value for money. The aim of this proposed research project is to develop mechanisms for measuring the true costs of tendering based upon extensive in-house data collection undertaken in a range of different construction firms. The output from this research will enable all participants in the construction process to make better decisions about how to select members of the team and identify the price and scope of their obligations.
Resumo:
Formal and analytical risk models prescribe how risk should be incorporated in construction bids. However, the actual process of how contractors and their clients negotiate and agree on price is complex, and not clearly articulated in the literature. Using participant observation, the entire tender process was shadowed in two leading UK construction firms. This was compared to propositions in analytical models and significant differences were found. 670 hours of work observed in both firms revealed three stages of the bidding process. Bidding activities were categorized and their extent estimated as deskwork (32%), calculations (19%), meetings (14%), documents (13%), off-days (11%), conversations (7%), correspondence (3%) and travel (1%). Risk allowances of 1-2% were priced in some bids and three tiers of risk apportionment in bids were identified. However, priced risks may sometimes be excluded from the final bidding price to enhance competitiveness. Thus, although risk apportionment affects a contractor’s pricing strategy, other complex, microeconomic factors also affect price. Instead of pricing in contingencies, risk was priced mostly through contractual rather than price mechanisms, to reflect commercial imperatives. The findings explain why some assumptions underpinning analytical models may not be sustainable in practice and why what actually happens in practice is important for those who seek to model the pricing of construction bids.
Resumo:
Three experiments conducted over two years (2002-04) at the Crops Research Unit, University of Reading, investigated competition between autumn sown oilseed rape cultivars (Brassica napus L. ssp. oleifera var. biennis (DC.) Metzg.) and Lolium multiflorum Lam., L. x boucheanum Kunth and Alopecurus myosuroides Huds., sown as indicative grass weeds. Rape cultivar (cv.) had a substantial effect on grass weed seed return. Over the six cultivars tested, L. multiflorum spikelet production ranged from just under 400 spikelets/m(2) in the presence of cv. Winner to nearly 5800 in competition with cv. Lutin. Cultivar competitiveness was associated with high biomass, large dense floral layers and early stem extension. There was some evidence of differential competitive tolerance between rape cultivars. The results suggested that rape cultivars could be screened for competitiveness by measuring floral layer interception of photosynthetic active radiation. L. x boucheanum cultivars varied in ability to compete with rape. In the absence of inter-specific competition, spikelet density was similar for Aberecho and Polly (circa 31000 spikelets/m(2)) but when grown with rape Polly outyielded Aberecho (i.e. 12 090 and 7990 spikelets/m(2) respectively).
Resumo:
Agricultural policy liberalisation, concern about unhealthy diets and growing recognition of the importance of sustainable land use have fostered interest in the development of competitive food chains based around products that are beneficial to the rural environment. We review the potential for foods with enhanced health attributes based on alternative varieties/breeds and production systems to traditional agriculture which has been predominantly motivated by yields. We concentrate on soft fruit, which is an important source of polyphenols, and grazing livestock systems that have the potential for improving fatty acid profiles in meat products and find there to be clear scientific potential, but limited research to date. Consumer research suggests considerable acceptance of such products and willingness to pay sufficient to cover additional production costs. Purchase of such foods could have major implications for agricultural land use and the rural environment. There is little research to date on specific healthier food products, but spatially explicit models are being developed to assess land use and environmental implications of changing demand and husbandry methods.