36 resultados para best interests of the child

em CentAUR: Central Archive University of Reading - UK


Relevância:

100.00% 100.00%

Publicador:

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Background: There is general agreement across all interested parties that a process of working together is the best way to determine which school or educational setting is right for an individual child with autism spectrum disorder. In the UK, families and local authorities both desire a constructive working relationship and see this as the best means by which to reach an agreement to determine where a child should be educated. It has been shown in published works 1 1. Batten and colleagues (Make schools make sense. Autism and education: the reality for families today; London: The National Autistic Society, 2006). View all notes that a constructive working relationship is not always achieved. Purpose: This small-scale study aims to explore the views of both parents and local authorities, focussing on how both parties perceive and experience the process of determining educational provision for children with autism spectrum disorders (ASD) within an English context. Sample, design and method: Parental opinion was gathered through the use of a questionnaire with closed and open responses. The questionnaire was distributed to two national charities, two local charities and 16 specialist schools, which offered the questionnaire to parents of children with ASD, resulting in an opportunity sample of 738 returned surveys. The views of local authority personnel from five local authorities were gathered through the use of semi-structured interviews. Data analyses included quantitative analysis of the closed response questionnaire items, and theme-based qualitative analysis of the open responses and interviews with local authority personnel. Results: In the majority of cases, parents in the survey obtained their first choice placement for their child. Despite this positive outcome, survey data indicated that parents found the process bureaucratic, stressful and time consuming. Parents tended to perceive alternative placement suggestions as financially motivated rather than in the best interests of the child. Interviews with local authority personnel showed an awareness of these concerns and the complex considerations involved in determining what is best for an individual child. Conclusions: This small-scale study highlights the need for more effective communication between parents of children with ASDs and local authority personnel at all stages of the process

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The paper seeks to draw attention to some of the recent cases relating to child custody law in Bangladesh where, deviating from orthodox Shari’a rules, courts have looked to ‘the welfare’ of the child in determining which parent shall have custody. In studying the recent ‘welfare of child’ standard that has been advanced by the courts in Bangladesh, the paper aims to explore its implications for Muslim women from a feminist perspective.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This essay engages with the question of childhood in Anne Brontë’s The Tenant of Wildfell Hall. Despite narrating a conflict concerning child custody, childhood is a subject rarely broached by the critics of the text. Indeed, the only instance of the child being addressed in criticism grants it the power to enclose potentially subversive narrative. This is a function attributed to the framing structure of the novel by other critics. This essay returns the child to Brontë’s text as a disruptive rather than containing force. Through a detailed close analysis of the novel I track such disruptions, and the extent to which these point to wider theoretical or methodological difficulties in critical accounts of childhood and absence in literature. The essay makes interventions into psychoanalysis, childhood studies, and the discourse of ‘framing’ within C19th literature.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Background: Attention deficit hyperactivity disorder (ADHD) can be treated with stimulant medication such as methylphenidate. Although effective, methylphenidate can cause serious side-effects, including suppressed appetite, growth retardation and sleep problems. A drug holiday is a deliberate interruption of pharmacotherapy for a defined period of time and for a specific clinical purpose, for example for appeasing side-effects. Whilst some international guidelines recommend introducing drug holidays in ADHD treatment, this is not practised routinely. Our aim was to examine the views and experiences of planned drug holidays from methylphenidate with adults who have responsibility for treatment decisions in children and adolescents with ADHD. Method: In-depth interviews were carried out. Child and Adolescent Mental Health Services (CAMHS) practitioners (n=8), General Practitioners (n=8), teachers (n=5), and mothers of children with ADHD (n=4) were interviewed in a UK setting. Interview transcripts were analysed using grounded theory. Results: Methylphenidate eases the experience of the child amid problems at home and at school and once started is mostly continued long-term. Some families do practise short-term drug holidays at weekends and longer-term ones during school holidays. The decision to introduce drug holidays is influenced by the child’s academic progress, the parents’ ability to cope with the child, as well as medication beliefs. Trialling a drug holiday is thought to allow older children to self-assess their ability to manage without medication when they show signs of wanting to discontinue treatment prematurely. Conclusions: Planned drug holidays could address premature treatment cessation by enabling adolescents to assess repercussions under medical supervision.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Comparison between observed and calculated infrared band contours has been made to determine the vibrational transition moment ratio |M10/M9| for the Coriolis interacting ν9 and ν10 perpendicular fundamentals of allene-h4. The ratio obtained is appreciably lower than that of a previous estimate and the result obtained by integrated band intensity measurements of Overend and Crawford. From the best estimate of the ratio, the dipole moment derivatives of the two bands are determined; the value for the weaker band ν9 is subject to a large uncertainty.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper provides an extended analysis of the child labor problem in the artisanal and small-scale mining (ASM) sector, focusing specifically on the situation in sub-Saharan Africa. In recent years, the issue of child labor in ASM has garnered significant attention from the International Labor Organization (ILO), which has been particularly active in raising public awareness of the problem; and, has proceeded to implement policies and collaborative project work aimed at Curtailing children's participation in ASM activities in a number of African countries. The analysis concludes with a critical appraisal of an ILO project recently launched in the Talensi-Nabdam District in the Upper East Region of Ghana, which sheds light on how the child labor problem is being tackled in practice in ASM communities in sub-Saharan Africa. (c) 2008 Elsevier Ltd. All rights reserved.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Background Recent reports have suggested that the prevalence of autism and related spectrum disorders (ASDs) is substantially higher than previously recognised. We sought to quantify prevalence of ASDs in children in South Thames, UK. Methods Within a total population cohort of 56946 children aged 9-10 years, we screened all those with a current clinical diagnosis of ASD (n=255) or those judged to be at risk for being an undetected case (n=1515). A stratified subsample (n=255) received a comprehensive diagnostic assessment, including standardised clinical observation, and parent interview assessments of autistic symptoms, language, and intelligence quotient (IQ). Clinical consensus diagnoses of childhood autism and other ASDs were derived. We used a sample weighting procedure to estimate prevalence. Findings The prevalence of childhood autism was 38.9 per 10000 (95% CI 29.9-47.8) and that of other ASDs was 77.2 per 10000 (52.1-102.3), making the total prevalence of all AS Ds 116.1 per 10000 (90.4-141.8). A narrower definition of childhood autism, which combined clinical consensus with instrument criteria for past and current presentation, provided a prevalence of 24.8 per 10 000 (17.6-32.0). The rate of previous local identification was lowest for children of less educated parents. Interpretation Prevalence of autism and related ASDs is substantially greater than previously recognised. Whether the increase is due to better ascertainment, broadening diagnostic criteria, or increased incidence is unclear. Services in health, education, and social care will need to recognise the needs of children with some form of ASD, who constitute 1% of the child population.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

We use a stratosphere–troposphere composition–climate model with interactive sulfur chemistry and aerosol microphysics, to investigate the effect of the 1991 Mount Pinatubo eruption on stratospheric aerosol properties. Satellite measurements indicate that shortly after the eruption, between 14 and 23 Tg of SO2 (7 to 11.5 Tg of sulfur) was present in the tropical stratosphere. Best estimates of the peak global stratospheric aerosol burden are in the range 19 to 26 Tg, or 3.7 to 6.7 Tg of sulfur assuming a composition of between 59 and 77 % H2SO4. In light of this large uncertainty range, we performed two main simulations with 10 and 20 Tg of SO2 injected into the tropical lower stratosphere. Simulated stratospheric aerosol properties through the 1991 to 1995 period are compared against a range of available satellite and in situ measurements. Stratospheric aerosol optical depth (sAOD) and effective radius from both simulations show good qualitative agreement with the observations, with the timing of peak sAOD and decay timescale matching well with the observations in the tropics and mid-latitudes. However, injecting 20 Tg gives a factor of 2 too high stratospheric aerosol mass burden compared to the satellite data, with consequent strong high biases in simulated sAOD and surface area density, with the 10 Tg injection in much better agreement. Our model cannot explain the large fraction of the injected sulfur that the satellite-derived SO2 and aerosol burdens indicate was removed within the first few months after the eruption. We suggest that either there is an additional alternative loss pathway for the SO2 not included in our model (e.g. via accommodation into ash or ice in the volcanic cloud) or that a larger proportion of the injected sulfur was removed via cross-tropopause transport than in our simulations. We also critically evaluate the simulated evolution of the particle size distribution, comparing in detail to balloon-borne optical particle counter (OPC) measurements from Laramie, Wyoming, USA (41° N). Overall, the model captures remarkably well the complex variations in particle concentration profiles across the different OPC size channels. However, for the 19 to 27 km injection height-range used here, both runs have a modest high bias in the lowermost stratosphere for the finest particles (radii less than 250 nm), and the decay timescale is longer in the model for these particles, with a much later return to background conditions. Also, whereas the 10 Tg run compared best to the satellite measurements, a significant low bias is apparent in the coarser size channels in the volcanically perturbed lower stratosphere. Overall, our results suggest that, with appropriate calibration, aerosol microphysics models are capable of capturing the observed variation in particle size distribution in the stratosphere across both volcanically perturbed and quiescent conditions. Furthermore, additional sensitivity simulations suggest that predictions with the models are robust to uncertainties in sub-grid particle formation and nucleation rates in the stratosphere.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

We present an analysis of a cusp ion step, observed by the Defense Meteorological Satellite Program (DMSP) F10 spacecraft, between two poleward moving events of enhanced ionospheric electron temperature, observed by the European Incoherent Scatter (EISCAT) radar. From the ions detected by the satellite, the variation of the reconnection rate is computed for assumed distances along the open-closed field line separatrix from the satellite to the X line, do. Comparison with the onset times of the associated ionospheric events allows this distance to be estimated, but with an uncertainty due to the determination of the low-energy cutoff of the ion velocity distribution function, ƒ(ν). Nevertheless, the reconnection site is shown to be on the dayside magnetopause, consistent with the reconnection model of the cusp during southward interplanetary magnetic field (IMF). Analysis of the time series of distribution function at constant energies, ƒ(ts), shows that the best estimate of the distance do is 14.5±2 RE. This is consistent with various magnetopause observations of the signatures of reconnection for southward IMF. The ion precipitation is used to reconstruct the field-parallel part of the Cowley D ion distribution function injected into the open low-latitude boundary layer in the vicinity of the X line. From this reconstruction, the field-aligned component of the magnetosheath flow is found to be only −55±65 km s−1 near the X line, which means either that the reconnection X line is near the stagnation region at the nose of the magnetosphere, or that it is closely aligned with the magnetosheath flow streamline which is orthogonal to the magnetosheath field, or both. In addition, the sheath Alfvén speed at the X line is found to be 220±45 km s−1, and the speed with which newly opened field lines are ejected from the X line is 165±30 km s−1. We show that the inferred magnetic field, plasma density, and temperature of the sheath near the X line are consistent with a near-subsolar reconnection site and confirm that the magnetosheath field makes a large angle (>58°) with the X line.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This chapter discusses the pedagogic and scholarly priorities that informed Heyne’s commentaries on Tibullus (1755), Virgil (1767-75) and Homer (1802), as well as their initial critical reception. Like those of his teachers, Gesner and Ernesti, Heyne’s works eschew detailed textual scholarship in favour of aesthetic and historicizing appreciation of literary works as wholes. Their formal innovations – most notably the relegation of advanced philological discussions to endnotes and the inclusion of excursuses on significant historical and cultural questions – are an attempt to tailor a traditional format to the demands of an Enlightened age and the cultural-historical interests of the new Altertumswissenschaft. The chapter discusses their contrasting critical receptions in order to raise questions about the viability of Heyne’s endeavours to make a traditional medium fit new concerns.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Optimal state estimation is a method that requires minimising a weighted, nonlinear, least-squares objective function in order to obtain the best estimate of the current state of a dynamical system. Often the minimisation is non-trivial due to the large scale of the problem, the relative sparsity of the observations and the nonlinearity of the objective function. To simplify the problem the solution is often found via a sequence of linearised objective functions. The condition number of the Hessian of the linearised problem is an important indicator of the convergence rate of the minimisation and the expected accuracy of the solution. In the standard formulation the convergence is slow, indicating an ill-conditioned objective function. A transformation to different variables is often used to ameliorate the conditioning of the Hessian by changing, or preconditioning, the Hessian. There is only sparse information in the literature for describing the causes of ill-conditioning of the optimal state estimation problem and explaining the effect of preconditioning on the condition number. This paper derives descriptive theoretical bounds on the condition number of both the unpreconditioned and preconditioned system in order to better understand the conditioning of the problem. We use these bounds to explain why the standard objective function is often ill-conditioned and why a standard preconditioning reduces the condition number. We also use the bounds on the preconditioned Hessian to understand the main factors that affect the conditioning of the system. We illustrate the results with simple numerical experiments.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The systems used for the procurement of buildings are organizational systems. They involve people in a series of strategic decisions, and a pattern of roles, responsibilities and relationships that combine to form the organizational structure of the project. To ensure effectiveness of the building team, this organizational structure needs to be contingent upon the environment within which the construction project takes place. In addition, a changing environment means that the organizational structure within a project needs to be responsive, and dynamic. These needs are often not satisfied in the construction industry, due to the lack of analytical tools with which to analyse the environment and to design appropriate temporary organizations. This paper presents two techniques. First is the technique of "Environmental Complexity Analysis", which identifies the key variables in the environment of the construction project. These are classified as Financial, Legal, Technological, Aesthetic and Policy. It is proposed that their identification will set the parameters within which the project has to be managed. This provides a basis for the project managers to define the relevant set of decision points that will be required for the project. The Environmental Complexity Analysis also identifies the project's requirements for control systems concerning Budget, Contractual, Functional, Quality and Time control. The process of environmental scanning needs to be done at regular points during the procurement process to ensure that the organizational structure is adaptive to the changing environment. The second technique introduced is the technique of "3R analysis", being a graphical technique for describing and modelling Roles, Responsibilities and Relationships. A list of steps is introduced that explains the procedure recommended for setting up a flexible organizational structure that is responsive to the environment of the project. This is by contrast with the current trend towards predetermined procurement paths that may not always be in the best interests of the client.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The devolution of political power in Scotland, Wales and Northern Ireland and the developing regional agenda in England are widely read as a significant reconfiguration of the institutions and scales of economic governance. The process is furthest developed in Scotland while Wales and Northern Ireland, in their own distinct ways, provide intermediate cases. Devolution is least developed in England where regional political identities are generally weak and the historical legacy of regional institutions is limited. Within the overall context of devolution government policy has continued to emphasize partnership forms of. governance. Accordingly, the political representation of business interests has a particular salience in the new arrangements. This paper reports on findings from a study designed to examine the relationship between devolution and changes in the political representation of business interests in the territories and regions of the UK. It highlights a number of changes in the nature and extent of business representation. While some of these are significant the evidence suggests that they fail to mark a fundamental shift in the institutional foundation for sub-national business interest representation in the UK. Indeed the political geography of business representation remains dominated by an overarching centralism that is likely to provide a significant check on the further devolution of political power and democratic authority. (c) 2004 Elsevier Ltd. All rights reserved.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The devolution of political power in Scotland, Wales and Northern Ireland and the developing regional agenda in England are widely read as a significant reconfiguration of the institutions and scales of economic governance. The process is furthest developed in Scotland while Wales and Northern Ireland, in their own distinct ways, provide intermediate cases. Devolution is least developed in England where regional political identities are generally weak and the historical legacy of regional institutions is limited. Within the overall context of devolution government policy has continued to emphasize partnership forms of. governance. Accordingly, the political representation of business interests has a particular salience in the new arrangements. This paper reports on findings from a study designed to examine the relationship between devolution and changes in the political representation of business interests in the territories and regions of the UK. It highlights a number of changes in the nature and extent of business representation. While some of these are significant the evidence suggests that they fail to mark a fundamental shift in the institutional foundation for sub-national business interest representation in the UK. Indeed the political geography of business representation remains dominated by an overarching centralism that is likely to provide a significant check on the further devolution of political power and democratic authority. (c) 2004 Elsevier Ltd. All rights reserved.