17 resultados para Transmission system planning
em CentAUR: Central Archive University of Reading - UK
Resumo:
This study investigates the superposition-based cooperative transmission system. In this system, a key point is for the relay node to detect data transmitted from the source node. This issued was less considered in the existing literature as the channel is usually assumed to be flat fading and a priori known. In practice, however, the channel is not only a priori unknown but subject to frequency selective fading. Channel estimation is thus necessary. Of particular interest is the channel estimation at the relay node which imposes extra requirement for the system resources. The authors propose a novel turbo least-square channel estimator by exploring the superposition structure of the transmission data. The proposed channel estimator not only requires no pilot symbols but also has significantly better performance than the classic approach. The soft-in-soft-out minimum mean square error (MMSE) equaliser is also re-derived to match the superimposed data structure. Finally computer simulation results are shown to verify the proposed algorithm.
Resumo:
In order to increase overall transparency on key operational information, power transmission system operators publish an increasing amount of fundamental data, including forecasts of electricity demand and available capacity. We employ a fundamental model for electricity prices which lends itself well to integrating such forecasts, while retaining ease of implementation and tractability to allow for analytic derivatives pricing formulae. In an extensive futures pricing study, the pricing performance of our model is shown to further improve based on the inclusion of electricity demand and capacity forecasts, thus confirming the general importance of forward-looking information for electricity derivatives pricing. However, we also find that the usefulness of integrating forecast data into the pricing approach is primarily limited to those periods during which electricity prices are highly sensitive to demand or available capacity, whereas the impact is less visible when fuel prices are the primary underlying driver to prices instead.
Resumo:
Planning a project with proper considerations of all necessary factors and managing a project to ensure its successful implementation will face a lot of challenges. Initial stage in planning a project for bidding a project is costly, time consuming and usually with poor accuracy on cost and effort predictions. On the other hand, detailed information for previous projects may be buried in piles of archived documents which can be increasingly difficult to learn from the previous experiences. Project portfolio has been brought into this field aiming to improve the information sharing and management among different projects. However, the amount of information that could be shared is still limited to generic information. This paper, we report a recently developed software system COBRA to automatically generate a project plan with effort estimation of time and cost based on data collected from previous completed projects. To maximise the data sharing and management among different projects, we proposed a method of using product based planning from PRINCE2 methodology. (Automated Project Information Sharing and Management System -�COBRA) Keywords: project management, product based planning, best practice, PRINCE2
Resumo:
This paper examines the achievements to date of Twf (“Growth”) — a project initiated as part of language planning efforts in Wales to encourage families to bring up their children to be bilingual. Evidence is presented of the ways in which the project has succeeded in raising awareness of the advantages of bilingualism amongst parents, prospective parents and the public at large by working strategically with health professionals and Early Years organizations, and by developing a range of highly innovative promotional materials. Given the central importance of the family as a site of intergenerational language transmission, the achievements of this project are likely to be of interest to those concerned with language planning in other minority communities in many other parts of the world. The lessons for language planning both in Wales and in other settings are discussed.
Resumo:
The aim of this paper is to critically examine the application of development appraisal to viability assessment in the planning system. This evaluation is of development appraisal models in general and also their use in particular applications associated with estimating planning obligation capacity. The paper is organised into four themes: · The context and conceptual basis for development viability appraisal · A review of development viability appraisal methods · A discussion of selected key inputs into a development viability appraisal · A discussion of the applications of development viability appraisals in the planning system It is assumed that readers are familiar with the basic models and information needs of development viability appraisal rather than at the cutting edge of practice and/or academe
Resumo:
This paper explores the relationship between political ideology and planning in Britain and Sweden, with particular emphasis on the by-passing of the planning system. The prevailing ideology in each country over the last ten years is outlined and the impact on planning identified. The argument is then given in greater depth through case studies of two major projects. For Britain, this involves setting out the main features of Thatcherism and the way that this has changed the purposes underlying planning and created a diversified planning system. This is followed by a case study of Canary Wharf. For Sweden, the consensus culture and the emphasis on participation and decentralisation are discussed. The new planning legislation of 1987 is outlined. These aspects are then contrasted with the fiscal crisis and the development of 'negotiation planning'. These themes are illustrated by a case study of the Globe in Stockholm.
Resumo:
Planning is highly conditioned by the relationships between the market, state and politics. This becomes particularly clear in looking at the changes taking place in the countries of the former Communist block as they attempt to establish a new set of relationships. The old power structures have been dislodged and old laws discarded. This paper examines the situation in Bulgaria and explores the preconditions for setting up a new planning system there. The first section outlines the political changes since 1989 and shows how political instability has effected the pace of change. The establishment of a market in land and property is a second precondition for the planning system there and moves in this direction are presented, including restitution policies. Finally the issues raised by the early attempts towards a new planning system are discussed. This paper is the first of a series looking at the countries of Eastern Europe and the author would welcome comments from others working in this field.
Resumo:
Due to the requirement to demonstrate financial feasibility of policy proposals and scheme-specific planning obligations, development viability and development appraisal have become core themes in the English planning system. The objective of this paper is to evaluate the application of development appraisal in practice. The paper reviews the literature and the models available to assess the viability of development and analyses a sample 19 development viability appraisals to identify practice. The paper concludes that the practice of development appraisal deviates significantly from the tenets of capital budgeting theory. In particular, in addition to a propensity to oversimplify the timing of income and expenditure, the way in which debt, developer’s return and value and cost change are handled in practice illustrates a major gap between mainstream capital budgeting theory and development appraisal in practice.
Resumo:
This paper investigates the application and use of development viability models in the formation of planning policies in the UK. Particular attention is paid to three key areas; the assumed development scheme in development viability models, the use of forecasts and the debate concerning Threshold Land Value. The empirical section reports on the results of an interview survey involving the main producers of development viability models and appraisals. It is concluded that, although development viability models have intrinsic limitations associated with model composition and input uncertainties, the most significant limitations are related to the ways that they have been adapted for use in the planning system. In addition, it is suggested that the contested nature of Threshold Land Value is an example of calculative practices providing a façade of technocratic rationality in the planning system.
Resumo:
Consultation on the Reform of the Planning System in Northern Ireland commenced on 6 July 2009 with the publication of the long awaited proposals paper: 'Reform of the Planning System in Northern Ireland: Your chance to influence change'. A 12 week consultation period followed during which time a series of consultation roadshow events were undertaken. This report is an account of that strand of the reform consultation and the discussions that took place at the roadshows during a three week period in September 2009. The roadshow events formed the central part in a process of encouraging engagement and response to the Reform Proposals before the closing date of 2 October 2009. They were organised and facilitated by a team of event managers and independent planners who, together with key Planning Service personnel, attended a mixture of day and evening events in each of the new eleven council areas to hear the views and opinions of those who came along. Aside from being publicly advertised, over 1,500 invitations (written and e-invites) were issued to a wide range of sectors, including the business community,environmentalists, councils, community and voluntary groups and other organisations, and 1,000 fliers were issued to libraries, leisure centres, council offices and civic centres. In total almost 500 people took up the invitation and came along to one or more of the events.