3 resultados para Team working
em CentAUR: Central Archive University of Reading - UK
Resumo:
Background: The care of the acutely ill patient in hospital is often sub-optimal. Poor recognition of critical illness combined with a lack of knowledge, failure to appreciate the clinical urgency of a situation, a lack of supervision, failure to seek advice and poor communication have been identified as contributory factors. At present the training of medical students in these important skills is fragmented. The aim of this study was to use consensus techniques to identify the core competencies in the care of acutely ill or arrested adult patients that medical students should possess at the point of graduation. Design: Healthcare professionals were invited to contribute suggestions for competencies to a website as part of a modified Delphi survey. The competency proposals were grouped into themes and rated by a nominal group comprised of physicians, nurses and students from the UK. The nominal group rated the importance of each competency using a 5-point Likert scale. Results: A total of 359 healthcare professionals contributed 2,629 competency suggestions during the Delphi survey. These were reduced to 88 representative themes covering: airway and oxygenation; breathing and ventilation; circulation; confusion and coma; drugs, therapeutics and protocols; clinical examination; monitoring and investigations; team-working, organisation and communication; patient and societal needs; trauma; equipment; pre-hospital care; infection and inflammation. The nominal group identified 71 essential and 16 optional competencies which students should possess at the point of graduation. Conclusions: We propose these competencies form a core set for undergraduate training in resuscitation and acute care.
Resumo:
Construction planning plays a fundamental role in construction project management that requires team working among planners from a diverse range of disciplines and in geographically dispersed working situations. Model-based four-dimensional (4D) computer-aided design (CAD) groupware, though considered a possible approach to supporting collaborative planning, is still short of effective collaborative mechanisms for teamwork due to methodological, technological and social challenges. Targeting this problem, this paper proposes a model-based groupware solution to enable a group of multidisciplinary planners to perform real-time collaborative 4D planning across the Internet. In the light of the interactive definition method, and its computer-supported collaborative work (CSCW) design analysis, the paper discusses the realization of interactive collaborative mechanisms from software architecture, application mode, and data exchange protocol. These mechanisms have been integrated into a groupware solution, which was validated by a planning team in a truly geographically dispersed condition. Analysis of the validation results revealed that the proposed solution is feasible for real-time collaborative 4D planning to gain a robust construction plan through collaborative teamwork. The realization of this solution triggers further considerations about its enhancement for wider groupware applications.
Resumo:
How does the work of designers impact on the safety of operatives at the construction site? Safety research and policy emphasize the importance of designing for safe construction, yet the interface between design and construction is poorly understood: accidents have multiple causes making it hard to establish causal links between design choices and safety outcomes. An in-depth case study of a major station project examines how professionals on the construction site perceive and manage the safety challenges of a building design. Analyses reveal understandings that, on the project studied, design has an impact on safety because of: (1) the timing of design work, where the volume of late design changes increased the difficulty of planning safe procedures, e.g. for working at height, lifting heavy items, refurbishing and demolishing old buildings; and (2) inputs from design stakeholders with insufficient practical knowledge of construction and operation required unplanned work-arounds, e.g. to coordinate different sub-systems, provide maintenance access, and manage loads during construction. These findings suggest that safety suffers where projects are under-designed, and that alongside regulation, there is a need for robust management attention to the contractual structures, incentives, processes and tools that enable clients and designers to understand material practices of construction and operation.