Resumo:
To ensure minimum loss of system security and revenue it is essential that faults on underground cable systems be located and repaired rapidly. Currently in the UK, the impulse current method is used to prelocate faults, prior to using acoustic methods to pinpoint the fault location. The impulse current method is heavily dependent on the engineer's knowledge and experience in recognising/interpreting the transient waveforms produced by the fault. The development of a prototype real-time expert system aid for the prelocation of cable faults is described. Results from the prototype demonstrate the feasibility and benefits of the expert system as an aid for the diagnosis and location of faults on underground cable systems.
Resumo:
The next couple of years will see the need for replacement of a large amount of life-expired switchgear on the UK 11 kV distribution system. Latest technology and alternative equipment have made the choice of replacement a complex task. The authors present an expert system as an aid to the decision process for the design of the 11 kV power distribution network.
Resumo:
In the reliability literature, maintenance time is usually ignored during the optimization of maintenance policies. In some scenarios, costs due to system failures may vary with time, and the ignorance of maintenance time will lead to unrealistic results. This paper develops maintenance policies for such situations where the system under study operates iteratively at two successive states: up or down. The costs due to system failure at the up state consist of both business losses & maintenance costs, whereas those at the down state only include maintenance costs. We consider three models: Model A, B, and C: Model A makes only corrective maintenance (CM). Model B performs imperfect preventive maintenance (PM) sequentially, and CM. Model C executes PM periodically, and CM; this PM can restore the system as good as the state just after the latest CM. The CM in this paper is imperfect repair. Finally, the impact of these maintenance policies is illustrated through numerical examples.
Resumo:
Garment information tracking is required for clean room garment management. In this paper, we present a camera-based robust system with implementation of Optical Character Reconition (OCR) techniques to fulfill garment label recognition. In the system, a camera is used for image capturing; an adaptive thresholding algorithm is employed to generate binary images; Connected Component Labelling (CCL) is then adopted for object detection in the binary image as a part of finding the ROI (Region of Interest); Artificial Neural Networks (ANNs) with the BP (Back Propagation) learning algorithm are used for digit recognition; and finally the system is verified by a system database. The system has been tested. The results show that it is capable of coping with variance of lighting, digit twisting, background complexity, and font orientations. The system performance with association to the digit recognition rate has met the design requirement. It has achieved real-time and error-free garment information tracking during the testing.
Resumo:
A key issue in UK railway history is whether the railway system was an efficient response to the traffic requirements of the economy. The UK railway system was constructed entirely by private enterprise with minimal state subsidies. This chapter considers whether the railway system was 'over-built' because the government ignored the advice of the Railway Committee of the Board of Trade. The chapter suggests that the system was over-built by about 35 per cent. The causes of this over-building are investigated and are found to be mainly social and political failures arising from distrust between MPs and civil servants and public pressure on local MPs to ensure that their constituencies were well served by railways.