4 resultados para Scheduling Systems
em CentAUR: Central Archive University of Reading - UK
Resumo:
Graphical tracking is a technique for crop scheduling where the actual plant state is plotted against an ideal target curve which encapsulates all crop and environmental characteristics. Management decisions are made on the basis of the position of the actual crop against the ideal position. Due to the simplicity of the approach it is possible for graphical tracks to be developed on site without the requirement for controlled experimentation. Growth models and graphical tracks are discussed, and an implementation of the Richards curve for graphical tracking described. In many cases, the more intuitively desirable growth models perform sub-optimally due to problems with the specification of starting conditions, environmental factors outside the scope of the original model and the introduction of new cultivars. Accurate specification for a biological model requires detailed and usually costly study, and as such is not adaptable to a changing cultivar range and changing cultivation techniques. Fitting of a new graphical track for a new cultivar can be conducted on site and improved over subsequent seasons. Graphical tracking emphasises the current position relative to the objective, and as such does not require the time consuming or system specific input of an environmental history, although it does require detailed crop measurement. The approach is flexible and could be applied to a variety of specification metrics, with digital imaging providing a route for added value. For decision making regarding crop manipulation from the observed current state, there is a role for simple predictive modelling over the short term to indicate the short term consequences of crop manipulation.
Resumo:
In multi-tasking systems when it is not possible to guarantee completion of all activities by specified times, the scheduling problem is not straightforward. Examples of this situation in real-time programming include the occurrence of alarm conditions and the buffering of output to peripherals in on-line facilities. The latter case is studied here with the hope of indicating one solution to the general problem.
Resumo:
Very large scale scheduling and planning tasks cannot be effectively addressed by fully automated schedule optimisation systems, since many key factors which govern 'fitness' in such cases are unformalisable. This raises the question of an interactive (or collaborative) approach, where fitness is assigned by the expert user. Though well-researched in the domains of interactively evolved art and music, this method is as yet rarely used in logistics. This paper concerns a difficulty shared by all interactive evolutionary systems (IESs), but especially those used for logistics or design problems. The difficulty is that objective evaluation of IESs is severely hampered by the need for expert humans in the loop. This makes it effectively impossible to, for example, determine with statistical confidence any ranking among a decent number of configurations for the parameters and strategy choices. We make headway into this difficulty with an Automated Tester (AT) for such systems. The AT replaces the human in experiments, and has parameters controlling its decision-making accuracy (modelling human error) and a built-in notion of a target solution which may typically be at odds with the solution which is optimal in terms of formalisable fitness. Using the AT, plausible evaluations of alternative designs for the IES can be done, allowing for (and examining the effects of) different levels of user error. We describe such an AT for evaluating an IES for very large scale planning.
Resumo:
Cross-layer techniques represent efficient means to enhance throughput and increase the transmission reliability of wireless communication systems. In this paper, a cross-layer design of aggressive adaptive modulation and coding (A-AMC), truncated automatic repeat request (T-ARQ), and user scheduling is proposed for multiuser multiple-input-multiple-output (MIMO) maximal ratio combining (MRC) systems, where the impacts of feedback delay (FD) and limited feedback (LF) on channel state information (CSI) are also considered. The A-AMC and T-ARQ mechanism selects the appropriate modulation and coding schemes (MCSs) to achieve higher spectral efficiency while satisfying the service requirement on the packet loss rate (PLR), profiting from the feasibility of using different MCSs to retransmit a packet, which is destined to a scheduled user selected to exploit multiuser diversity and enhance the system's performance in terms of both transmission efficiency and fairness. The system's performance is evaluated in terms of the average PLR, average spectral efficiency (ASE), outage probability, and average packet delay, which are derived in closed form, considering transmissions over Rayleigh-fading channels. Numerical results and comparisons are provided and show that A-AMC combined with T-ARQ yields higher spectral efficiency than the conventional scheme based on adaptive modulation and coding (AMC), while keeping the achieved PLR closer to the system's requirement and reducing delay. Furthermore, the effects of the number of ARQ retransmissions, numbers of transmit and receive antennas, normalized FD, and cardinality of the beamforming weight vector codebook are studied and discussed.